Alaska prevailing wage rates: AK20260006
Highway construction in Aleutians East, Aleutians West, Anchorage, Bethel, Bristol Bay, Denali, Dillingham, Fairbanks North Star, Haines, Juneau, Kenai Peninsula, Ketchikan Gateway, Kodiak Island, Matanuska-Susitna, Matanuska-Susitna, Nome, North Slope, Northwest Artic, Peninsula & Lake, Prince Of Wales-Outer Ketchika, Sitka, Skagway-Yakutat-Angoon, Southeast Fairbanks, Southeast Fairbanks, Valdez-Cordova, Wade Hampton, Wrangell-Petersburg, Yukon-Koyukuk Counties.
AK20260006, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed POWER EQUIPMENT OPERATOR: Group 1 base $52.23 → $53.23 (+$1.00), fringe $29.40 → $29.40 Same effective date as before (04/01/2025).
14 classifications added, 15 removed or reworded
- removed CEMENT MASON/CONCRETE FINISHER was $49.28 + $22.28 fringe
- removed LABORER (North of N 63 Latitude and East of W 138 Longitude): Group 1 was $40.25 + $34.41 fringe
- removed LABORER (North of N 63 Latitude and East of W 138 Longitude): Group 2 was $41.25 + $34.41 fringe
- removed LABORER (North of N 63 Latitude and East of W 138 Longitude): Group 3 was $42.15 + $34.41 fringe
- removed LABORER (North of N 63 Latitude and East of W 138 Longitude): Group 3A was $46.53 + $34.41 fringe
- removed LABORER (North of N 63 Latitude and East of W 138 Longitude): Group 3B was $54.01 + $28.96 fringe
- removed LABORER (South of N 63 Latitude and West of W 138 Longitude): Group 1 was $40.25 + $34.41 fringe
- removed LABORER (South of N 63 Latitude and West of W 138 Longitude): Group 2 was $41.25 + $34.41 fringe
- removed LABORER (South of N 63 Latitude and West of W 138 Longitude): Group 3 was $42.15 + $34.41 fringe
- removed LABORER (South of N 63 Latitude and West of W 138 Longitude): Group 3A was $46.53 + $34.41 fringe
- removed LABORER (South of N 63 Latitude and West of W 138 Longitude): Group 3B was $54.01 + $28.96 fringe
- added LABORER Group 1 (North of N 63 Latitude and East of W 138 Longitude) $40.25 + $34.41 fringe
- added LABORER Group 1 (South of N 63 Latitude and West of W 138 Longitude) $40.25 + $34.41 fringe
- added LABORER Group 2 (North of N 63 Latitude and East of W 138 Longitude) $41.25 + $34.41 fringe
- added LABORER Group 2 (South of N 63 Latitude and West of W 138 Longitude) $41.25 + $34.41 fringe
- added LABORER Group 3 (North of N 63 Latitude and East of W 138 Longitude) $42.15 + $34.41 fringe
- added LABORER Group 3 (South of N 63 Latitude and West of W 138 Longitude) $42.15 + $34.41 fringe
- added LABORER Group 3A (North of N 63 Latitude and East of W 138 Longitude) $46.53 + $34.41 fringe
- added LABORER Group 3A (South of N 63 Latitude and West of W 138 Longitude) $46.53 + $34.41 fringe
- added LABORER Group 3B (North of N 63 Latitude and East of W 138 Longitude) $54.01 + $28.96 fringe
- added LABORER Group 3B (South of N 63 Latitude and West of W 138 Longitude) $54.01 + $28.96 fringe
- removed PAINTER (Region 1: North of N 63 Latitude): Brush and Roller was $40.33 + $26.17 fringe
- removed PAINTER (Region 1: North of N 63 Latitude): Sandblast and Spray was $40.85 + $26.17 fringe
- removed PAINTER (South of N 63 Latitude): Brush, Roll, and Spray was $35.97 + $28.52 fringe
- removed PAINTER (South of N 63 Latitude): Sandblast and Structural Steel Painter was $37.32 + $28.52 fringe
- added PAINTER Brush and Roller (Region 1: North of N 63 Latitude) $40.33 + $26.17 fringe
- added PAINTER Brush, Roll, and Spray (South of N 63 Latitude) $35.97 + $28.52 fringe
- added PAINTER Sandblast and Spray (Region 1: North of N 63 Latitude) $40.85 + $26.17 fringe
- added PAINTER Sandblast and Structural Steel Painter (South of N 63 Latitude) $37.32 + $28.52 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| TRUCK DRIVER: Group 5 | $47.62 | $29.42 | $77.04 | SAAK2025-001 eff. 04/01/2025 |
| TRUCK DRIVER: Group 4 | $48.50 | $29.42 | $77.92 | SAAK2025-001 eff. 04/01/2025 |
| TRUCK DRIVER: Group 3 | $49.17 | $29.42 | $78.59 | SAAK2025-001 eff. 04/01/2025 |
| TRUCK DRIVER: Group 2 | $50.12 | $29.42 | $79.54 | SAAK2025-001 eff. 04/01/2025 |
| TRUCK DRIVER: Group 1A | $53.05 | $29.42 | $82.47 | SAAK2025-001 eff. 04/01/2025 |
| TRUCK DRIVER: Group 1 | $51.58 | $29.42 | $81.00 | SAAK2025-001 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 4 | $44.06 | $29.40 | $73.46 | SAAK2025-001 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 3 | $51.46 | $29.40 | $80.86 | SAAK2025-001 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 2 | $52.32 | $29.40 | $81.72 | SAAK2025-001 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 1A | $55.33 | $29.40 | $84.73 | SAAK2025-001 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 1 | $53.23 | $29.40 | $82.63 | SAAK2025-001 eff. 04/01/2025 |
| PLUMBER/PIPEFITTER: South of N 63 Latitude | $47.50 | $32.45 | $79.95 | SAAK2025-001 eff. 04/01/2025 |
| PLUMBER/PIPEFITTER: North of N 63 Latitude | $51.66 | $32.90 | $84.56 | SAAK2025-001 eff. 04/01/2025 |
| PLUMBER/PIPEFITTER: First Judicial District | $50.50 | $30.87 | $81.37 | SAAK2025-001 eff. 04/01/2025 |
| PILEDRIVER PERSON: Piledriver-Welder | $51.79 | $26.32 | $78.11 | SAAK2025-001 eff. 04/01/2025 |
| PILEDRIVER PERSON: Piledriver, Sheet Stabber | $50.79 | $26.32 | $77.11 | SAAK2025-001 eff. 04/01/2025 |
| PAINTER Sandblast and Structural Steel Painter (South of N 63 Latitude) | $37.32 | $28.52 | $65.84 | SAAK2025-001 eff. 04/01/2025 |
| PAINTER Sandblast and Spray (Region 1: North of N 63 Latitude) | $40.85 | $26.17 | $67.02 | SAAK2025-001 eff. 04/01/2025 |
| PAINTER Brush, Roll, and Spray (South of N 63 Latitude) | $35.97 | $28.52 | $64.49 | SAAK2025-001 eff. 04/01/2025 |
| PAINTER Brush and Roller (Region 1: North of N 63 Latitude) | $40.33 | $26.17 | $66.50 | SAAK2025-001 eff. 04/01/2025 |
| LINE CONSTRUCTION: Tree Trimmer | $42.23 | $30.25 | $72.48 | SAAK2025-001 eff. 04/01/2025 |
| LINE CONSTRUCTION: Power Journeyworker Line (Including Equipment Operator) | $72.59 | $35.90 | $108.49 | SAAK2025-001 eff. 04/01/2025 |
| LINE CONSTRUCTION: Powderperson | $70.59 | $35.84 | $106.43 | SAAK2025-001 eff. 04/01/2025 |
| LINE CONSTRUCTION: Line Installer | $53.53 | $34.54 | $88.07 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 3B (South of N 63 Latitude and West of W 138 Longitude) | $54.01 | $28.96 | $82.97 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 3B (North of N 63 Latitude and East of W 138 Longitude) | $54.01 | $28.96 | $82.97 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 3A (South of N 63 Latitude and West of W 138 Longitude) | $46.53 | $34.41 | $80.94 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 3A (North of N 63 Latitude and East of W 138 Longitude) | $46.53 | $34.41 | $80.94 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 3 (South of N 63 Latitude and West of W 138 Longitude) | $42.15 | $34.41 | $76.56 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 3 (North of N 63 Latitude and East of W 138 Longitude) | $42.15 | $34.41 | $76.56 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 2 (South of N 63 Latitude and West of W 138 Longitude) | $41.25 | $34.41 | $75.66 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 2 (North of N 63 Latitude and East of W 138 Longitude) | $41.25 | $34.41 | $75.66 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 1 (South of N 63 Latitude and West of W 138 Longitude) | $40.25 | $34.41 | $74.66 | SAAK2025-001 eff. 04/01/2025 |
| LABORER Group 1 (North of N 63 Latitude and East of W 138 Longitude) | $40.25 | $34.41 | $74.66 | SAAK2025-001 eff. 04/01/2025 |
| IRONWORKER: Signalman, Stage Rigger, Structural, Ornamental, and Reinforcing | $46.49 | $36.85 | $83.34 | SAAK2025-001 eff. 04/01/2025 |
| IRONWORKER: Guardrail Layout Man | $43.73 | $36.85 | $80.58 | SAAK2025-001 eff. 04/01/2025 |
| IRONWORKER: Guardrail Installer | $43.99 | $36.85 | $80.84 | SAAK2025-001 eff. 04/01/2025 |
| IRONWORKER: Fence Barrier Installer | $42.99 | $36.85 | $79.84 | SAAK2025-001 eff. 04/01/2025 |
| ELECTRICIAN: Inside Journeyman Wireman (Technician) | $53.44 | $30.52 | $83.96 | SAAK2025-001 eff. 04/01/2025 |
| CARPENTER (South of N63 Latitude) | $50.79 | $26.86 | $77.65 | SAAK2025-001 eff. 04/01/2025 |
| CARPENTER (North of 63 Latitude) | $50.79 | $26.32 | $77.11 | SAAK2025-001 eff. 04/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.