PrevailCrew

Davis-Bacon wage determinations: what they are and which one applies

A Davis-Bacon wage determination is the Department of Labor's list of minimum hourly wages and fringe benefits for each construction trade in a county. It decides what you must pay on a federal job, so picking the right one, and the right revision, matters before you bid.

Last reviewed November 9, 2026 · Sources linked below · General information, not legal advice

What a wage determination is

The Davis-Bacon Act requires contractors on covered federal construction to pay laborers and mechanics at least the wages and fringe benefits the Secretary of Labor determines to be prevailing in the area (40 U.S.C. 3142). Those rates are published as wage determinations, usually called WDs.

A general wage determination covers:

  • A state and set of counties, sometimes split into zones or areas
  • One or more types of construction: building, residential, heavy or highway
  • A list of classifications (trades) with a basic hourly rate and a fringe benefit rate for each
  • A number and modification, such as CA20260014, Modification 7, with a publication date

Each WD number has the state abbreviation, the year and a sequence number. When DOL updates the rates, it publishes a new modification of the same WD. Our guide to reading a wage determination explains the rest of the document.

The four construction types

DOL issues separate determinations for four types of construction, defined in All Agency Memorandum 130:

TypeTypical projects
BuildingSheltered enclosures with walk-in access: schools, offices, hospitals, and apartment buildings over 4 stories
ResidentialSingle-family homes and apartment buildings up to 4 stories
HighwayRoads, streets, highways, runways and similar paving work
HeavyThe catch-all: water and sewer lines, dams, utilities and other projects that aren't building, residential or highway

A project with substantial work of more than one type can use more than one determination. DOL's benchmark for adding a second type is work over 20% of the project cost or $2.5 million (Fact Sheet #66D).

Where to find one

  1. Your contract or bid documents. The contracting agency incorporates the applicable WD and modification. That is the one you must pay, even if a newer one exists online.
  2. SAM.gov. Every Davis-Bacon general wage determination is published on SAM.gov, searchable by state, county and construction type. It replaced the old WDOL.gov site.
  3. Our rate pages. Davis-Bacon wage rates by state show the same rates in a readable table, with each WD's number, modification, date and a link back to SAM.gov, plus what changed in the latest modification.

Which revision applies

WDs change during the year, so timing matters. Under 29 CFR 1.6(c)(2):

  • Sealed bids: a modification issued at least 10 days before bid opening applies. One issued fewer than 10 days before also applies, unless the agency finds there isn't reasonable time to notify bidders and notes that in the contract file.
  • After bid opening: later modifications don't apply if the contract is awarded within 90 days of bid opening. If award takes longer, modifications issued before award apply, unless DOL extends the 90 days.
  • Other contracts: for contracts not awarded by sealed bid, the WD in effect when the contract is awarded applies (or when construction starts, if there is no award).
  • Once awarded: the WD in the contract generally stays for the life of the contract. Exceptions include options and extensions, significant added scope, and yearly updates on some long-term or indefinite-delivery contracts.
Bid on the rate in the bid documents, but check SAM.gov for modifications published shortly before bid opening. A late modification can still apply.

When your trade isn't listed

If you need a classification that isn't on the WD, ask the contracting officer for a conformance (29 CFR 5.5(a)(1)(iii)). On direct federal contracts, the request uses Standard Form 1444 (48 CFR 22.406-3). The agency sends it to the Wage and Hour Division, which generally acts within 30 days. A conformed rate must be used in the area, not be work done by a listed classification, and bear a reasonable relationship to the listed rates. Once approved, it applies from the first day the work was done.

Executive order notes

Wage determinations print notes about federal contractor minimum wages and paid sick leave. Executive Order 14026, which set a higher contractor minimum wage, was revoked on March 14, 2025 by Executive Order 14236, and current WDs no longer carry its note. They may carry the Executive Order 13658 note, which applies to contracts awarded between January 1, 2015 and January 29, 2022 and not renewed or extended since, and the Executive Order 13706 paid sick leave note. Read the notes on your own WD.

Common questions

Where do I find a Davis-Bacon wage determination?

On SAM.gov, under wage determinations, searchable by state, county and construction type. But the one that binds your job is the determination (and modification) incorporated in your contract or bid documents, so start there.

What does the modification number mean?

Wage determinations are revised during the year. Each revision gets a modification number and publication date. The modification in effect at the right moment, usually bid opening or contract award, is the one that applies for the life of the contract.

What if my trade isn't on the wage determination?

Ask the contracting officer to request a conformance before or as the work starts. On direct federal contracts this goes on Standard Form 1444. The Department of Labor sets a rate, and it applies from the first day the work was performed.

Can a project have more than one wage determination?

Yes. A project with significant work of two types, for example a building with substantial site work, can carry both a building and a heavy or highway determination. DOL's guidance uses 20% of project cost or $2.5 million as a benchmark for adding a second type.

Does the Executive Order 14026 minimum wage still apply?

Executive Order 14026 was revoked on March 14, 2025, and current wage determinations no longer carry its note. They may still carry the Executive Order 13658 note, which covers contracts awarded between January 1, 2015 and January 29, 2022 and not renewed or extended since. Check the notes on your own determination.

Sources

  1. 40 U.S.C. 3142: Davis-Bacon Act, rate of wages for laborers and mechanics (govinfo)
  2. 29 CFR 1.2: Definitions, including “prevailing wage” and “type of construction” (eCFR)
  3. 29 CFR 1.6: Use and effectiveness of wage determinations (eCFR)
  4. DOL Fact Sheet #66D: Application of general wage determinations under the DBRA
  5. 29 CFR 5.5: Contract provisions and related matters, including certified payroll (eCFR)
  6. 48 CFR 22.406-3: Additional classifications (SF-1444) (eCFR)
  7. SAM.gov: wage determinations search
  8. Federal Register: Executive Order 14236 (revokes Executive Order 14026), March 20, 2025
  9. Federal Register: Executive Order 13658 minimum wage rate change notice, October 8, 2026

This page explains the rules in general terms. Your contract, the agency and the wage determination decide what applies to your job. When in doubt, ask the contracting agency or a lawyer.

Stop retyping the crew every week.

Save your workers and rates once. Each week starts from the last, with the math checked.

14 days of the Crew plan, free. No card needed, so nothing is charged when it ends.