A Davis-Bacon wage determination is a plain-text document full of codes, groups and footnotes. Once you know its layout, finding your rate takes a minute. Here's how to read one from top to bottom.

Last reviewed November 9, 2026 · Sources linked below · General information, not legal advice

Open any general wage determination on SAM.gov, or the one in your contract, and work through it in this order. Our Davis-Bacon rate pages show the same rates as a table, with links back to the original text.

The top of the determination tells you whether it applies to your job at all:

  • General Decision Number, such as CA20260014: state, year, sequence. Use this number on your certified payroll.
  • Superseded General Decision Number: the determination this one replaced.
  • State and counties: the area covered. Some determinations split a state into zones.
  • Construction type: building, residential, heavy or highway, often with a description of what it excludes, such as single-family homes and apartments up to 4 stories on a building determination. Match it to your project type.

2. The modification list

Below the header is a list of modification numbers and publication dates. Number 0 is the original; each later number is a revision. The modification that applies to your contract is fixed by the bid opening or award date, so it may not be the latest one. See which revision applies.

3. Executive order notes

Next come notes about federal contractor minimum wage and paid sick leave executive orders. Executive Order 14026 was revoked on March 14, 2025, and current determinations no longer print its note. You may still see:

  • Executive Order 13658: a contractor minimum wage for contracts awarded from January 1, 2015 to January 29, 2022 and not renewed or extended since. If it applies, a listed rate below it must be raised to that minimum.
  • Executive Order 13706: paid sick leave of 1 hour for every 30 hours worked, up to 56 hours a year, on covered contracts.

4. The rate blocks

The body is a series of blocks, one per rate source. Each block starts with a rate identifier and date, then lists one or more classifications with two columns: Rates (the basic hourly rate) and Fringes (the hourly fringe benefit). A simplified, illustrative block looks like this:

ELEC0003-004 06/01/2025

                                  Rates          Fringes
ELECTRICIAN......................$ 52.40        31.20

----------------------------------------------------------------
SUCA2023-011 05/14/2024

                                  Rates          Fringes
LABORER: Common or General.......$ 24.15         7.10
OPERATOR: Backhoe/Excavator......$ 31.80         9.45

For each worker, find the classification that matches the work they did, and note both numbers. If a classification lists groups (Group 1, Group 2 and so on), find the group that names the equipment or task. Some blocks also list areas or zones within the counties.

5. Rate identifiers

The code at the top of each block tells you where the rate came from. The legend at the end of every determination explains it:

IdentifierMeaningThe date shows
PLUM0198-005 (any four letters other than SU, UAVG, SA, SC)Union rate: PLUM is the union, 0198 the local or district council, 005 an internal DOL numberEffective date of the most recent negotiated rate
UAVG-OH-0010Union average: no single rate prevailed, but all the data reported were union ratesWhen DOL last updated the average, usually each January
SUFL2022-007Survey rate: a single non-union rate prevailed, or a weighted average that can include union rates. 2022 is the survey yearSurvey completion date
SAME2023-007State adopted: rates adopted from a state or local prevailing wage surveyWhen the rates took effect under state law
SCSupplemental classification rateAs printed

Union rates are updated as new agreements are reported to DOL, so they change most often between modifications. Under 29 CFR 1.2, a rate prevails if more than half the workers in the classification are paid it; if no rate has a majority, the rate paid to the largest group prevails if that group is at least 30%; otherwise DOL uses a weighted average.

6. Footnotes

Letters after a rate point to footnotes, usually printed under the block. They add pay that isn't in the two columns, such as paid holidays, vacation as a percentage of base, or premiums for certain work. A footnote that adds money is part of the required rate: convert it to an hourly amount and include it in the fringe you pay.

At the very end, the determination explains the appeals process, which lets interested parties ask DOL to reconsider a rate.

7. If your trade isn't there

If none of the classifications fits the work, don't guess with a lower-paid one. Ask the contracting officer to request a conformance, a new classification and rate approved by DOL. On direct federal contracts it uses Standard Form 1444. The approved rate applies back to the first day of the work. Then report each worker's hours under that classification on your certified payroll.

Common questions

What does ELEC0003-004 mean on a wage determination?

It is a union rate identifier. ELEC is the union whose collectively bargained rate prevailed, 0003 is the local union or district council number, and 004 is an internal number DOL uses in processing. The date after it is the effective date of the most recent negotiated rate.

What does SU mean on a wage determination?

SU marks a rate from a DOL wage survey. It is either a single non-union rate that prevailed or a weighted average of all rates reported in the survey, which can include union rates. The year in the identifier is the survey year and the date is when the survey was completed.

Why does my classification show a fringe of 0 or a percentage?

A zero fringe means none prevailed for that trade in the survey. A percentage or footnote letter means part of the fringe is figured differently, for example vacation as a percentage of the base rate or paid holidays listed in a footnote. Read the footnote and convert it to an hourly amount.

Is the rate in the determination per hour?

Yes, almost always: a basic hourly rate and an hourly fringe. A few classifications, such as some divers or tunnel workers, may be stated per day or per shift. Read the classification line and its notes.

Sources

  1. SAM.gov: example general wage determination CA20260014, modification 7
  2. SAM.gov: wage determinations search
  3. 29 CFR 1.2: Definitions, including “prevailing wage” and “type of construction” (eCFR)
  4. 29 CFR 1.6: Use and effectiveness of wage determinations (eCFR)
  5. 29 CFR 5.5: Contract provisions and related matters, including certified payroll (eCFR)
  6. DOL Fact Sheet #66D: Application of general wage determinations under the DBRA
  7. Federal Register: Executive Order 14236 (revokes Executive Order 14026), March 20, 2025
  8. Federal Register: Executive Order 13658 minimum wage rate change notice, October 8, 2026

This page explains the rules in general terms. Your contract, the agency and the wage determination decide what applies to your job. When in doubt, ask the contracting agency or a lawyer.

Stop retyping the crew every week.

Save your workers and rates once. Each week starts from the last, with the math checked.

14 days of the Crew plan, free. No card needed, so nothing is charged when it ends.