Arizona prevailing wage rates: AZ20260002
Residential construction in Pima County.
AZ20260002, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
BRICKLAYERScope and notesZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $32.29 | $9.97 | $42.26 | BRAZ0003-007 eff. 07/01/2024 |
| ELECTRICIAN | $17.50 | $7.57 | $25.07 | ELEC0518-002 eff. 01/01/2018 |
| ELECTRICIAN (LOW VOLTAGE WIRING FOR ALARMS) | $25.36 | $5.54 | $30.90 | ELEC0570-006 eff. 01/01/2025 |
| IRONWORKER, STRUCTURAL | $33.00 | $19.91 | $52.91 | IRON0075-008 eff. 08/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $14.50 | $0.00 | $14.50 | SUAZ2011-002 eff. 07/28/2011 |
| TRUCK DRIVER: DUMP TRUCK | $16.75 | $0.93 | $17.68 | SUAZ2011-002 eff. 07/28/2011 |
| TILE SETTER | $18.79 | $0.00 | $18.79 | SUAZ2011-002 eff. 07/28/2011 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $14.33 | $0.00 | $14.33 | SUAZ2011-002 eff. 07/28/2011 |
| ROOFER | $13.67 | $0.00 | $13.67 | SUAZ2011-002 eff. 07/28/2011 |
| PLUMBER | $21.78 | $0.00 | $21.78 | SUAZ2011-002 eff. 07/28/2011 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $13.31 EO 13658 minimum $13.65 may apply | $0.00 | $13.31 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: TRACTOR | $20.00 | $0.47 | $20.47 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: SCRAPER | $19.20 | $1.52 | $20.72 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: ROLLER | $16.24 | $1.42 | $17.66 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.75 | $0.00 | $20.75 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: LOADER (FRONT END) | $16.38 | $0.00 | $16.38 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: GRADER/BLADE | $17.40 | $0.00 | $17.40 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: FORKLIFT | $16.00 | $0.00 | $16.00 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: EXCAVATOR | $24.67 | $0.00 | $24.67 | SUAZ2011-002 eff. 07/28/2011 |
| OPERATOR: BACKHOE | $16.32 | $0.00 | $16.32 | SUAZ2011-002 eff. 07/28/2011 |
| LATHER | $13.31 EO 13658 minimum $13.65 may apply | $0.00 | $13.31 | SUAZ2011-002 eff. 07/28/2011 |
| LABORER: PIPELAYER | $13.00 EO 13658 minimum $13.65 may apply | $0.00 | $13.00 | SUAZ2011-002 eff. 07/28/2011 |
| LABORER: MASON TENDER - CEMENT/CONCRETE/STONE | $13.94 | $0.00 | $13.94 | SUAZ2011-002 eff. 07/28/2011 |
| LABORER: MASON TENDER - BRICK | $12.77 EO 13658 minimum $13.65 may apply | $0.00 | $12.77 | SUAZ2011-002 eff. 07/28/2011 |
| LABORER: GRADE CHECKER | $16.83 | $0.45 | $17.28 | SUAZ2011-002 eff. 07/28/2011 |
| LABORER: FORM-STRIPPING | $18.00 | $0.35 | $18.35 | SUAZ2011-002 eff. 07/28/2011 |
| LABORER: COMMON OR GENERAL | $10.39 EO 13658 minimum $13.65 may apply | $0.23 | $10.62 | SUAZ2011-002 eff. 07/28/2011 |
| GLAZIER | $16.86 | $0.00 | $16.86 | SUAZ2011-002 eff. 07/28/2011 |
| FORM WORKER | $14.04 | $0.00 | $14.04 | SUAZ2011-002 eff. 07/28/2011 |
| DRYWALL HANGER | $17.44 | $0.00 | $17.44 | SUAZ2011-002 eff. 07/28/2011 |
| DRYWALL FINISHER/TAPER | $20.38 | $0.00 | $20.38 | SUAZ2011-002 eff. 07/28/2011 |
| CEMENT MASON/CONCRETE FINISHER | $17.13 | $0.00 | $17.13 | SUAZ2011-002 eff. 07/28/2011 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $24.45 | $0.00 | $24.45 | SUAZ2011-002 eff. 07/28/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.