Arizona prevailing wage rates: AZ20260007
Heavy construction in Apache, Cochise, Coconino, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz, Yavapai Counties.
AZ20260007, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
6 classifications added, 6 removed or reworded
- removed DIVER (Standby) was $22.98 + $8.93 fringe
- removed DIVER (Standby) was $25.37 + $8.93 fringe
- removed DIVER (Standby) was $28.49 + $8.93 fringe
- added DIVER (STANDBY): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER $22.98 + $8.93 fringe
- added DIVER (STANDBY): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER $25.37 + $8.93 fringe
- added DIVER (STANDBY): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER $28.49 + $8.93 fringe
- removed DIVER (Wet) was $43.79 + $8.93 fringe
- removed DIVER (Wet) was $45.17 + $8.93 fringe
- removed DIVER (Wet) was $48.29 + $8.93 fringe
- added DIVER (WET): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER $43.79 + $8.93 fringe
- added DIVER (WET): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER $45.17 + $8.93 fringe
- added DIVER (WET): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER $48.29 + $8.93 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $36.07 | $30.59 | $66.66 | BOIL0627-003 eff. 01/01/2021 |
BRICKLAYERScope and notesZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $31.68 | $8.90 | $40.58 | BRAZ0003-005 eff. 07/01/2021 |
BRICKLAYER COCHISE AND SANTA CRUZ COUNTIES; AND THE AREA OF GRAHAM AND GREENLEE COUNTIES LOCATED EAST AND SOUTH OF THE SAN FRANCISCO RIVER TO THE GILA RIVERScope and notesZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $32.74 | $9.52 | $42.26 | BRAZ0003-013 eff. 07/01/2023 |
| PILEDRIVERMAN | $27.38 | $12.44 | $39.82 | CARP0408-004 eff. 07/01/2019 |
| CARPENTER (INCLUDING FORM WORK) | $28.08 | $12.74 | $40.82 | CARP0408-004 eff. 07/01/2019 |
| MILLWRIGHT ZONE DEFINITIONS FOR MILLWRIGHTS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $40.61 | $17.53 | $58.14 | CARP1914-001 eff. 09/01/2019 |
| DIVER (WET): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $48.29 | $8.93 | $57.22 | CARP1914-002 eff. 09/01/2003 |
| DIVER (WET): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $45.17 | $8.93 | $54.10 | CARP1914-002 eff. 09/01/2003 |
| DIVER (WET): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $43.79 | $8.93 | $52.72 | CARP1914-002 eff. 09/01/2003 |
| DIVER (STANDBY): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $28.49 | $8.93 | $37.42 | CARP1914-002 eff. 09/01/2003 |
| DIVER (STANDBY): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $25.37 | $8.93 | $34.30 | CARP1914-002 eff. 09/01/2003 |
| DIVER (STANDBY): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $22.98 | $8.93 | $31.91 | CARP1914-002 eff. 09/01/2003 |
| ELECTRICIAN (APACHE COUNTY [SOUTH OF HIGHWAY 66]; ALL OF GILA COUNTY; NAVAJO COUNTY [SOUTH AND EAST OF BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO-NAVAJO COUNTY LINE, EXTENDING NORTHEASTERLY ALONG CLEAR CREEK AND NORTHEASTERLY TO COTTONWOOD WASH, ALONG COTTONWOOD WASH NORTH EASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION, THEN EAST ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE]; AND PINAL COU | $36.50 | $14.84 | $51.34 | ELEC0518-001 eff. 08/01/2025 |
| ELECTRICIAN COCHISE, GRAHAM, LA PAZ, AND SANTA CRUZ COUNTIES ZONE DEFINITIONS- ZONE A: THE AREA WITHIN A THIRTY-NINE (39) MILE RADIUS FROM A BASING POINT AT THE TUCSON TOWN HALL. ZONE B: 40 TO 74 MILE RADIUS FROM THE TOWN HALL IN TUCSON- AN ADDITIONAL $ 3.50 PER HOUR ZONE C: 75 MILE RADIUS FROM THE TOWN HALL IN TUCSON TO THE OUTER LIMITS OF THE GEOGRAPHIC JURISDICTION- AN ADDITIONAL $ 7.50 PER HOUR | $33.00 | $13.04 | $46.04 | ELEC0570-004 eff. 06/01/2025 |
| ELECTRICIAN/WIREMAN: (ZONE 1) APACHE COUNTY [AREA NORTH OF HIGHWAY 66] ZONE 1: 0 TO 10 MILES FROM GALLUP, NM ZONE 2: 10 TO 30 MILES FROM GALLUP - ADD 9% ZONE 3: 30 TO 40 MILES FROM GALLUP - ADD 15% ZONE 4: OVER 40 MILES FROM GALLUP - ADD 26% | $40.30 | $13.41 | $53.71 | ELEC0611-005 eff. 01/01/2025 |
| ELECTRICIAN (COCONINO AND YAVAPAI COUNTIES; AND THE FOLLOWING PORTIONS OF COUNTIES: NAVAJO COUNTY (NORTH AND WEST OF A BOUNDARY BEGINNING AT A POINT WHERE CLEAR CREEK CROSSES THE COCONINO-NAVAJO COUNTY LINE, NORTHEASTERLY ALONG CLEAR CREEK AND NORTHEASTERLY TO COTTONWOOD WASH, ALONG COTTONWOOD WASH NORTHEASTERLY TO WHERE IT INTERSECTS THE NAVAJO INDIAN RESERVATION THEN EASTERLY ALONG THE NAVAJO INDIAN RESERVATION BOUNDARY LINE TO A POINT WHERE IT INTERSECTS THE NAVAJO-APACHE COUNTY LINE); PINAL | $30.30 | $12.36 | $42.66 | ELEC0640-003 eff. 01/01/2021 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANE OPERATOR (PNEUMATIC OR CRAWLER-100 TONS HOISTING CAPACITY AND OVER, MRC RATING), SKIP LOADER (ALL TYPES WITH RATED CAPACITY OF 10 CU. YD. OR MORE), UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL, ETC., 10 CU. YD. AND OVER) MULTIPLE-UNIT EARTH EQUIPMENT (HOLLAND LOADER ETC.), TRACTOR OPERATOR, PNEUMATIC-TIRED OR TRACK TYPE, TWO UNITS-$0.50 PER HOUR OVER BASE RATE; AND $1.00 PER HOUR FOR EACH ADDITIONAL UNIT ALL OPERATORS, OILERS, AND MOTOR CRANE DRIVERS ON EQUIPMENT WITH BOOMS, EXCEPT CONCRETE PUMPING TRUCK BOOMS, INCLUDING JIBS, SHALL RECEIVE $0.01 PER HOUR PER FOOT OVER 80 FT IN ADDITION TO REGULAR RATE OF PAY PREMIUM PAY FOR PERFORMING HAZARDOUS WASTE REMOVAL $0.50 PER HOUR OVER BASE RATE | $32.42 | $11.72 | $44.14 | ENGI0428-002 eff. 06/01/2020 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT OR CONCRETE PLANING, ROTOMILL AND MILLING MACHINE, AUTO GRADE MACHINE (CMI AND SIMILAR EQUIPMENT), BORING MACHINE (INCLUDING MOLE, BADGER AND SIMILAR TYPE), CONCRETE PUMP (TRUCK MOUNTED WITH BOOM), CRANE (CRAWLER AND PNEUMATIC OVER 15 TONS BUT LESS THAN 100 TONS CAPACITY MRC), CRAWLER TYPE TRACTOR WITH BOOM ATTACHMENT AND SLOPE BAR, DERRICK, GRADALL, HEAVY DUTY MECHANIC/WELDER, HELICOPTER HOIST OPERATOR OR PILOT, HIGHLINE CABLEWAY, MASS EXCAVATOR (150 BUCYRUS, ERIE AND SIMILAR TYPE), MECHANICAL HOIST (TWO OR MORE DRUMS), MOTOR GRADER (ANY TYPE POWER BLADE-FINISH), MUCKING MACHINE, OVERHEAD CRANE, GRADE CHECKER, PILEDRIVER ENGINEER (PORTABLE, STATIONARY OR SKID RIG), POWER DRIVEN DITCH LINING OR DITCH TRIMMING MACHINE, REMOTE CONTROL EARTH MOVING MACHINE, SKIP LOADER (ALL TYPES WITH RATED CAPACITY 6 CU. YD. BUT LESS THAN 10 CU. YD.), SLIP FORM PAVING MACHINE (INCLUDING GUNNERT, ZIMMERMAN AND SIMILAR TYPES), TOWER CRANE OR SIMILAR TYPE, UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL ETC., UP TO 10 CU. YD.); OPERATING ENGINEERS ELECTRICIAN INCLUDING TOWER ERECTOR, LINEMAN & CABLE SPLICER (LOAD SIDE OF MAIN DISCONNECT) | $31.39 | $11.72 | $43.11 | ENGI0428-002 eff. 06/01/2020 |
| POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT (INCLUDING CRUSHING, SCREENING AND SAND PLANTS, ETC.), ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE (RUBBER TIRED OR TRACK, LESS THAN 1 CU. YD. MRC), BEE GEE OPERATOR BORING MACHINE, CONCRETE BATCH PLANT (ALL TYPES AND SIZES), CONCRETE MECHANICAL TAMPING, SPREADING OR FINISHING MACHINE (INCLUDING CLARY, JOHNSON OR SIMILAR TYPES), CONCRETE MIXER (PAVING TYPE AND MOBILE MIXERS), CONCRETE PUMP, CRANE (CRAWLER AND PNEUMATIC LESS THAN 15 TON CAPACITY MRC), DRILLING MACHINE (INCLUDING WATER WELLS), ELEVATING GRADER (ALL TYPES AND SIZES EXCEPT AS OTHERWISE CLASSIFIED), FIELD EQUIPMENT SERVICEMAN, PAVER AND SIMILAR TYPE EQUIPMENT, MOTOR GRADER (ANY TYPE POWER BLADE-ROUGH), OILER DRIVER, OPERATING ENGINEER RIGGER, PNEUMATIC TIRED SCRAPER (ALL SIZES AND TYPES), POWER JUMBO FORM SETTER, ROAD OIL MIXING MACHINE, ROLLER (ON ALL TYPES ASPHALT PAVEMENT), SCREED, SELF-PROPELLED COMPACTOR (WITH BLADE, 815, 825 OR EQUIVALENT-GRADE OPERATION), SKIP LOADER (ALL TYPES WITH A RATED CAPACITY OVER 3 BUT LESS THAN 6 CU. YD.), SLIP FORM (POWER DRIVEN LIFTING DEVICE FOR CONCRETE FORMS), SOIL CEMENT ROAD MIXINGMACHINE (SINGLE PASS TYPE), HEATER AND PLANER, TRACTOR (DOZER, PUSHER-ALL), TRAVELING PIPE-WRAPPING MACHINE, TRENCHING MACHINE, TUGGER (TWO OR MORE) | $30.31 | $11.72 | $42.03 | ENGI0428-002 eff. 06/01/2020 |
| POWER EQUIPMENT OPERATOR: GROUP 1 A-FRAME BOOM TRUCK, WINCH TRUCK, AIR COMPRESSOR, BELTCRETE, BORING BRIDGE AND TEXTURE, CONCRETE MIXER (SKIP TYPE), CONDUCTOR, BRAKEMAN, HANDLER, CONVEYOR, CROSS TIMING AND PIPE FLOAT, CURING MACHINE, DINKY (UNDER 20 TONS), ELEVATOR HOIST (HUSKY AND SIMILAR), FIREMEN (ALL), FORKLIFT AND ROSS CARRIER, GENERATOR (ALL), HIGHLINE CABLEWAY SIGNALMAN, HYDROGRAPHIC MULCHER, HYDROGRAPHIC SEEDER, JOINT INSERTER, JUMBO FINISHING MACHINE, KOLMAN BELT LOADER, MACHINE CONVEYOR, MULTIPLE POWER CONCRETE SAW, OILER, PAVEMENT BREAKER, POWER GRIZZLY, POWER SWEEPER, PRESSURE GROUT MACHINE, PUMP, ROLLER (EXCEPT AS OTHERWISE CLASSIFIED), SELF-PROPELLED CHIP SPREADING MACHINE, SKIPLOADER (3 CU. YD. AND LESS), SLURRY SEAL MACHINE (MOTO PAVER DRIVER), SMALL SELF-PROPELLED COMPACTOR (WITH BLADE)-BACKFILL, DITCH OPERATION, STRAW BLOWER, TRACTOR (D-5 AND UNDER), TRIPPER, TUGGER, WELDING MACHINE, WHEEL-TYPE TRACTOR (FORD, FERGUSON TYPE WITH ATTACHMENTS, BEE GEE ETC.) | $27.04 | $11.72 | $38.76 | ENGI0428-002 eff. 06/01/2020 |
| IRONWORKER ZONE 1: 0 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2: 050 TO 100 MILES - ADD $4.00 ZONE 3: 100 TO 150 MILES - ADD $5.00 ZONE 4: 150 MILES & OVER - ADD $6.50 | $33.00 | $19.91 | $52.91 | IRON0075-001 eff. 08/01/2025 |
| PAINTER | $25.47 | $8.00 | $33.47 | PAIN0086-004 eff. 04/01/2024 |
| CEMENT MASON/CONCRETE FINISHER | $28.78 | $9.17 | $37.95 | PLAS0394-005 eff. 01/01/2024 |
| PLUMBER/PIPEFITTER COCHISE AND SANTA CRUZ | $48.40 | $19.50 | $67.90 | PLUM0469-006 eff. 07/01/2024 |
| PLUMBER/PIPEFITTER APACHE, COCONINO,GILA, GREENLEE, LA PAZ, NAVAJO, AND YAVAPAI | $48.40 | $19.50 | $67.90 | PLUM0469-006 eff. 07/01/2024 |
TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMPScope and notesFOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $29.47 | $1.65 | $31.12 | TEAM0104-002 eff. 07/01/2024 |
TRUCK DRIVER GROUP 5- 6-AXLE DUMPScope and notesFOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $27.80 | $1.65 | $29.45 | TEAM0104-002 eff. 07/01/2024 |
TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVERScope and notesFOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $28.68 | $1.65 | $30.33 | TEAM0104-002 eff. 07/01/2024 |
TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE- (2500 GAL BUT LESS THAN 4000 GAL)Scope and notesFOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $27.43 | $1.65 | $29.08 | TEAM0104-002 eff. 07/01/2024 |
TRUCK DRIVER GROUP 2: 2 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL.Scope and notesFOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $26.95 | $1.65 | $28.60 | TEAM0104-002 eff. 07/01/2024 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.