Arizona prevailing wage rates: AZ20260058
Heavy construction in Mohave County.
AZ20260058, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed Laborer: Mason Tender was $27.79 + $8.87 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN | $33.00 | $13.04 | $46.04 | ELEC0570-014 eff. 06/01/2025 |
| ELECTRICIAN: LINEPERSON | $62.08 | $22.49 | $84.57 | ELEC0769-001 eff. 08/04/2025 |
| ELECTRICIAN: GROUNDPERSON | $36.00 | $16.88 | $52.88 | ELEC0769-003 eff. 08/04/2025 |
| ELECTRICIAN: LINE EQUIPMENT OPERATOR | $46.56 | $19.15 | $65.71 | ELEC0769-004 eff. 08/04/2025 |
| POWER EQUIPMENT OPERATOR: OILER | $32.29 | $18.12 | $50.41 | ENGI0012-035 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON | $35.56 | $18.12 | $53.68 | ENGI0012-037 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: CRANE/DERRICK | $36.64 | $18.12 | $54.76 | ENGI0012-042 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $37.67 | $18.12 | $55.79 | ENGI0012-043 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.29 | $18.12 | $50.41 | ENGI0012-044 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE | $35.56 | $18.12 | $53.68 | ENGI0012-045 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $35.56 | $18.12 | $53.68 | ENGI0012-046 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER | $35.56 | $18.12 | $53.68 | ENGI0012-047 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER) | $35.56 | $18.12 | $53.68 | ENGI0012-048 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER | $35.56 | $18.12 | $53.68 | ENGI0012-049 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: TRENCHER | $35.56 | $18.12 | $53.68 | ENGI0012-054 eff. 12/01/2024 |
| TRUCK DRIVER: HYDROVAC | $35.56 | $18.12 | $53.68 | ENGI0012-055 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE | $36.64 | $18.12 | $54.76 | ENGI0012-058 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GRADE CHECKER | $36.64 | $18.12 | $54.76 | ENGI0012-059 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE | $36.64 | $18.12 | $54.76 | ENGI0012-061 eff. 12/01/2024 |
| LABORER: GENERAL | $27.41 | $9.26 | $36.67 | LABO1184-012 eff. 06/01/2025 |
| LABORER: JACKHAMMER | $29.05 | $9.26 | $38.31 | LABO1184-013 eff. 06/01/2025 |
| LABORER: PIPELAYER | $29.91 | $9.26 | $39.17 | LABO1184-014 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $30.88 | $9.26 | $40.14 | LABO1184-015 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL | $31.98 | $9.26 | $41.24 | LABO1184-016 eff. 06/01/2025 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.05 | $9.26 | $38.31 | LABO1184-022 eff. 06/01/2025 |
| LABORER: GRADE SETTER | $29.91 | $9.26 | $39.17 | LABO1184-028 eff. 06/01/2025 |
| TRUCK DRIVER: CONCRETE | $30.88 | $9.26 | $40.14 | LABO1184-034 eff. 06/01/2025 |
| TRUCK DRIVER: DUMP | $30.88 | $9.26 | $40.14 | LABO1184-035 eff. 06/01/2025 |
| TRUCK DRIVER: WATER | $30.88 | $9.26 | $40.14 | LABO1184-036 eff. 06/01/2025 |
| TRAFFIC CONTROL | $27.41 | $9.26 | $36.67 | LABO1184-042 eff. 06/01/2025 |
| CARPENTER: FORMWORK CONCRETE | $31.98 | $9.26 | $41.24 | LABO1184-050 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $32.41 | $0.00 | $32.41 | SUAZ2023-008 eff. 11/19/2024 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.