Colorado prevailing wage rates: CO20260006

Highway construction in Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Counties.

CO20260006, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

CO20260006 wage rates
ClassificationBaseFringeTotalRate ID
ELECTRICIAN, TRAFFIC SIGNALIZATION ONLY (CLEAR CREEK)$38.97$13.16$52.13ELEC0111-003
eff. 03/01/2025
POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES)$37.34$15.20$52.54ENGI0009-010
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), SCRAPER (40 CU.YD AND OVER)$35.41$15.20$50.61ENGI0009-010
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (5)-CRANE (51-90 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES)$36.09$15.20$51.29ENGI0009-010
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD)$35.20$15.20$50.40ENGI0009-010
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES)$35.78$15.20$50.98ENGI0009-010
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR)$35.03$15.20$50.23ENGI0009-010
eff. 05/01/2024
TRUCK DRIVER: WATER TRUCK (JEFFERSON)$17.57$5.27$22.84SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: WATER TRUCK (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$19.36$4.07$23.43SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: WATER TRUCK (ADAMS)$17.50$5.19$22.69SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR$12.43
EO 13658 minimum $13.65 may apply
$3.22$15.65SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$14.74$3.68$18.42SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (ARAPAHOE)$15.10$3.77$18.87SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (ADAMS, JEFFERSON)$13.93$3.68$17.61SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: SEMI/TRAILER TRUCK (ARAPAHOE)$16.00$2.60$18.60SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: SEMI/TRAILER TRUCK (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)$18.39$4.13$22.52SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (JEFFERSON)$15.13$3.89$19.02SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ARAPAHOE)$15.79$2.48$18.27SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$17.49$3.17$20.66SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: MECHANIC$26.48$3.50$29.98SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: LOWBOY TRUCK (JEFFERSON)$19.80$6.42$26.22SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: LOWBOY TRUCK (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$17.25$5.27$22.52SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DUMP TRUCK (PARK)$15.40$3.21$18.61SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DUMP TRUCK (JEFFERSON)$16.97$4.78$21.75SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DUMP TRUCK (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$16.47$5.27$21.74SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DUMP TRUCK (ARAPAHOE)$18.94$5.27$24.21SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DUMP TRUCK (ADAMS)$16.68$5.27$21.95SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DISTRIBUTOR (JEFFERSON)$19.46$6.04$25.50SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DISTRIBUTOR (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$18.19$5.27$23.46SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DISTRIBUTOR (ARAPAHOE)$19.62$5.27$24.89SUCO2011-001
eff. 09/15/2011
TRUCK DRIVER: DISTRIBUTOR (ADAMS)$15.80$5.27$21.07SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: TRACTOR$13.13
EO 13658 minimum $13.65 may apply
$2.95$16.08SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCREED (PARK)$20.36$3.04$23.40SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCREED (JEFFERSON)$22.64$8.43$31.07SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCREED (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$24.67$6.02$30.69SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCREED (ARAPAHOE)$22.67$8.72$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCREED (ADAMS)$27.89$3.50$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ROTOMILL$16.22$4.41$20.63SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (PARK)$16.52$3.13$19.65SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)$20.30$5.51$25.81SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (ADAMS)$16.70$3.30$20.00SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: OILER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$23.73$8.41$32.14SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: OILER (ADAMS, JEFFERSON)$21.97$8.72$30.69SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: MECHANIC (JEFFERSON)$23.56$8.72$32.28SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: MECHANIC (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$24.04$7.35$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: MECHANIC (ADAMS)$22.82$8.72$31.54SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PARK)$22.67$8.72$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (JEFFERSON)$23.06$7.76$30.82SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$23.20$8.33$31.53SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (ARAPAHOE)$26.80$4.84$31.64SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (ADAMS)$23.09$8.72$31.81SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER$16.07$4.41$20.48SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GRADER/BLADE (JEFFERSON)$23.28$7.73$31.01SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GRADER/BLADE (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$23.90$7.93$31.83SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GRADER/BLADE (ARAPAHOE)$22.67$8.72$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAMS)$23.94$8.23$32.17SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: FORKLIFT$15.91$4.68$20.59SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: DRILL (JEFFERSON)$20.65$5.74$26.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: DRILL (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$20.48$4.71$25.19SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: CRANE (JEFFERSON)$23.55$6.68$30.23SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: CRANE (ADAMS, PARK)$22.82$8.72$31.54SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: CONCRETE PUMP$21.60$5.21$26.81SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BULLDOZER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)$26.90$5.59$32.49SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BULLDOZER (ADAMS)$25.20$6.72$31.92SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (JEFFERSON)$22.18$8.36$30.54SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ARAPAHOE)$22.67$8.73$31.40SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$22.70$8.07$30.77SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BOOM$22.67$8.72$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (PARK)$22.46$0.00$22.46SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (JEFFERSON)$16.85$4.28$21.13SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (ARAPAHOE)$18.23$4.28$22.51SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$15.37$4.28$19.65SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PARK)$20.81$6.58$27.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (JEFFERSON)$21.99$5.60$27.59SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$22.19$6.48$28.67SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ARAPAHOE)$24.59$6.24$30.83SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ADAMS)$20.31$4.24$24.55SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER (JEFFERSON)$23.34$8.06$31.40SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$22.67$8.67$31.34SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (PARK)$22.84$8.72$31.56SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (JEFFERSON)$22.84$7.69$30.53SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$23.41$7.67$31.08SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ARAPAHOE)$22.68$8.72$31.40SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ADAMS)$24.20$7.70$31.90SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT PAVER$24.97$6.13$31.10SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (PARK)$22.67$8.72$31.39SUCO2011-001
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)$22.67$8.75$31.42SUCO2011-001
eff. 09/15/2011
PAINTER (SPRAY ONLY)$16.99$2.87$19.86SUCO2011-001
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (PARK)$12.76
EO 13658 minimum $13.65 may apply
$3.20$15.96SUCO2011-001
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (CLEAR CREEK)$13.14
EO 13658 minimum $13.65 may apply
$3.20$16.34SUCO2011-001
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON)$12.43
EO 13658 minimum $13.65 may apply
$3.22$15.65SUCO2011-001
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (FLAGGER) (PARK)$9.42
EO 13658 minimum $13.65 may apply
$3.21$12.63SUCO2011-001
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (FLAGGER) (JEFFERSON)$9.73
EO 13658 minimum $13.65 may apply
$3.05$12.78SUCO2011-001
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (FLAGGER) (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$9.55
EO 13658 minimum $13.65 may apply
$3.05$12.60SUCO2011-001
eff. 09/15/2011
LABORER: PIPELAYER$13.55
EO 13658 minimum $13.65 may apply
$2.41$15.96SUCO2011-001
eff. 09/15/2011
LABORER: MASON TENDER-CEMENT/CONCRETE (PARK)$15.08$3.10$18.18SUCO2011-001
eff. 09/15/2011
LABORER: MASON TENDER-CEMENT/CONCRETE (JEFFERSON)$16.29$4.25$20.54SUCO2011-001
eff. 09/15/2011
LABORER: MASON TENDER-CEMENT/CONCRETE (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$16.96$4.04$21.00SUCO2011-001
eff. 09/15/2011
LABORER: MASON TENDER-CEMENT/CONCRETE (ADAMS)$17.71$2.83$20.54SUCO2011-001
eff. 09/15/2011
LABORER: LANDSCAPE AND IRRIGATION (CLEAR CREEK)$14.98$3.16$18.14SUCO2011-001
eff. 09/15/2011
LABORER: LANDSCAPE AND IRRIGATION (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON, PARK)$12.26
EO 13658 minimum $13.65 may apply
$3.16$15.42SUCO2011-001
eff. 09/15/2011
LABORER: CONCRETE SAW (HAND HELD) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)$16.29$6.14$22.43SUCO2011-001
eff. 09/15/2011
LABORER: CONCRETE SAW (HAND HELD) (ADAMS)$16.29$5.20$21.49SUCO2011-001
eff. 09/15/2011
LABORER: COMMON OR GENERAL (PARK)$15.64$2.46$18.10SUCO2011-001
eff. 09/15/2011
LABORER: COMMON OR GENERAL (JEFFERSON)$16.51$4.27$20.78SUCO2011-001
eff. 09/15/2011
LABORER: COMMON OR GENERAL (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$16.67$4.27$20.94SUCO2011-001
eff. 09/15/2011
LABORER: COMMON OR GENERAL (ADAMS)$16.29$4.25$20.54SUCO2011-001
eff. 09/15/2011
LABORER: ASPHALT SPREADER$18.58$4.65$23.23SUCO2011-001
eff. 09/15/2011
LABORER: ASPHALT SHOVELER$21.21$4.25$25.46SUCO2011-001
eff. 09/15/2011
LABORER: ASPHALT RAKER (PARK)$17.41$1.86$19.27SUCO2011-001
eff. 09/15/2011
LABORER: ASPHALT RAKER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)$16.29$4.25$20.54SUCO2011-001
eff. 09/15/2011
IRONWORKER: REINFORCING (PARK)$19.98$2.89$22.87SUCO2011-001
eff. 09/15/2011
IRONWORKER: REINFORCING (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON)$16.69$5.45$22.14SUCO2011-001
eff. 09/15/2011
IRONWORKER: REINFORCING (ADAMS)$22.14$0.77$22.91SUCO2011-001
eff. 09/15/2011
IRONWORKER, STRUCTURAL$18.22$6.01$24.23SUCO2011-001
eff. 09/15/2011
HIGHWAY/PARKING LOT STRIPING:PAINTER (JEFFERSON)$14.21$3.21$17.42SUCO2011-001
eff. 09/15/2011
HIGHWAY/PARKING LOT STRIPING: PAINTER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK)$12.62
EO 13658 minimum $13.65 may apply
$3.21$15.83SUCO2011-001
eff. 09/15/2011
GUARDRAIL INSTALLER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)$12.89
EO 13658 minimum $13.65 may apply
$3.20$16.09SUCO2011-001
eff. 09/15/2011
GUARDRAIL INSTALLER (ADAMS)$12.89
EO 13658 minimum $13.65 may apply
$3.45$16.34SUCO2011-001
eff. 09/15/2011
FORM WORKER (ARAPAHOE)$15.30$3.90$19.20SUCO2011-001
eff. 09/15/2011
FENCE ERECTOR$13.02
EO 13658 minimum $13.65 may apply
$3.20$16.22SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (JEFFERSON)$15.19$4.72$19.91SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (CLEAR CREEK)$15.70$2.14$17.84SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (ARAPHAOE, BROOMFIELD, ELBERT, GILPIN, PARK)$15.24$3.81$19.05SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (ADAMS)$13.96$2.80$16.76SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (JEFFERSON)$26.78$5.44$32.22SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, PARK)$27.25$7.10$34.35SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)$35.13$6.83$41.96SUCO2011-001
eff. 09/15/2011
ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION (ADAMS)$31.00$14.01$45.01SUCO2011-001
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (PARK)$17.09$2.85$19.94SUCO2011-001
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (JEFFERSON)$18.02$3.42$21.44SUCO2011-001
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$18.37$3.00$21.37SUCO2011-001
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (ARAPAHOE)$18.70$3.85$22.55SUCO2011-001
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (ADAMS)$16.05$3.00$19.05SUCO2011-001
eff. 09/15/2011
CARPENTER, FORM WORK ONLY (PARK)$17.28$5.38$22.66SUCO2011-001
eff. 09/15/2011
CARPENTER, FORM WORK ONLY (JEFFERSON)$16.88$3.81$20.69SUCO2011-001
eff. 09/15/2011
CARPENTER, FORM WORK ONLY (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN)$19.11$5.46$24.57SUCO2011-001
eff. 09/15/2011
CARPENTER, FORM WORK ONLY (ADAMS)$16.78$3.57$20.35SUCO2011-001
eff. 09/15/2011
CARPENTER, EXCLUDES FORM WORK (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK)$19.27$5.08$24.35SUCO2011-001
eff. 09/15/2011
CARPENTER, EXCLUDES FORM WORK (ADAMS)$16.61$3.88$20.49SUCO2011-001
eff. 09/15/2011

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.