Colorado prevailing wage rates: CO20260006
Highway construction in Adams, Arapahoe, Broomfield, Clear Creek, Elbert, Gilpin, Jefferson, Park Counties.
CO20260006, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN, TRAFFIC SIGNALIZATION ONLY (CLEAR CREEK) | $38.97 | $13.16 | $52.13 | ELEC0111-003 eff. 03/01/2025 |
| POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $37.34 | $15.20 | $52.54 | ENGI0009-010 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), SCRAPER (40 CU.YD AND OVER) | $35.41 | $15.20 | $50.61 | ENGI0009-010 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (5)-CRANE (51-90 TONS) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $36.09 | $15.20 | $51.29 | ENGI0009-010 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (4)-SCRAPER (SINGLE BOWL, UNDER 40 CU. YD) | $35.20 | $15.20 | $50.40 | ENGI0009-010 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN COUNTIES) | $35.78 | $15.20 | $50.98 | ENGI0009-010 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR) | $35.03 | $15.20 | $50.23 | ENGI0009-010 eff. 05/01/2024 |
| TRUCK DRIVER: WATER TRUCK (JEFFERSON) | $17.57 | $5.27 | $22.84 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: WATER TRUCK (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $19.36 | $4.07 | $23.43 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: WATER TRUCK (ADAMS) | $17.50 | $5.19 | $22.69 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR | $12.43 EO 13658 minimum $13.65 may apply | $3.22 | $15.65 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $14.74 | $3.68 | $18.42 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (ARAPAHOE) | $15.10 | $3.77 | $18.87 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: SINGLE AXLE (INCLUDES PICKUP AND PILOT CAR) (ADAMS, JEFFERSON) | $13.93 | $3.68 | $17.61 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK (ARAPAHOE) | $16.00 | $2.60 | $18.60 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $18.39 | $4.13 | $22.52 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (JEFFERSON) | $15.13 | $3.89 | $19.02 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ARAPAHOE) | $15.79 | $2.48 | $18.27 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALITY AND HOISTING TRUCK (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $17.49 | $3.17 | $20.66 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: MECHANIC | $26.48 | $3.50 | $29.98 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: LOWBOY TRUCK (JEFFERSON) | $19.80 | $6.42 | $26.22 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: LOWBOY TRUCK (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $17.25 | $5.27 | $22.52 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (PARK) | $15.40 | $3.21 | $18.61 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (JEFFERSON) | $16.97 | $4.78 | $21.75 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.47 | $5.27 | $21.74 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (ARAPAHOE) | $18.94 | $5.27 | $24.21 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (ADAMS) | $16.68 | $5.27 | $21.95 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR (JEFFERSON) | $19.46 | $6.04 | $25.50 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $18.19 | $5.27 | $23.46 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR (ARAPAHOE) | $19.62 | $5.27 | $24.89 | SUCO2011-001 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR (ADAMS) | $15.80 | $5.27 | $21.07 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.13 EO 13658 minimum $13.65 may apply | $2.95 | $16.08 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (PARK) | $20.36 | $3.04 | $23.40 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (JEFFERSON) | $22.64 | $8.43 | $31.07 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $24.67 | $6.02 | $30.69 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (ARAPAHOE) | $22.67 | $8.72 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (ADAMS) | $27.89 | $3.50 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $16.22 | $4.41 | $20.63 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (PARK) | $16.52 | $3.13 | $19.65 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $20.30 | $5.51 | $25.81 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (ADAMS) | $16.70 | $3.30 | $20.00 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: OILER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $23.73 | $8.41 | $32.14 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: OILER (ADAMS, JEFFERSON) | $21.97 | $8.72 | $30.69 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (JEFFERSON) | $23.56 | $8.72 | $32.28 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $24.04 | $7.35 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (ADAMS) | $22.82 | $8.72 | $31.54 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (PARK) | $22.67 | $8.72 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (JEFFERSON) | $23.06 | $7.76 | $30.82 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $23.20 | $8.33 | $31.53 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (ARAPAHOE) | $26.80 | $4.84 | $31.64 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (ADAMS) | $23.09 | $8.72 | $31.81 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 | $20.48 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (JEFFERSON) | $23.28 | $7.73 | $31.01 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $23.90 | $7.93 | $31.83 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ARAPAHOE) | $22.67 | $8.72 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (ADAMS) | $23.94 | $8.23 | $32.17 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $15.91 | $4.68 | $20.59 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: DRILL (JEFFERSON) | $20.65 | $5.74 | $26.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: DRILL (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $20.48 | $4.71 | $25.19 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: CRANE (JEFFERSON) | $23.55 | $6.68 | $30.23 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: CRANE (ADAMS, PARK) | $22.82 | $8.72 | $31.54 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: CONCRETE PUMP | $21.60 | $5.21 | $26.81 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $26.90 | $5.59 | $32.49 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ADAMS) | $25.20 | $6.72 | $31.92 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (JEFFERSON) | $22.18 | $8.36 | $30.54 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ARAPAHOE) | $22.67 | $8.73 | $31.40 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $22.70 | $8.07 | $30.77 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOOM | $22.67 | $8.72 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (PARK) | $22.46 | $0.00 | $22.46 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (JEFFERSON) | $16.85 | $4.28 | $21.13 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (ARAPAHOE) | $18.23 | $4.28 | $22.51 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (ADAMS, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $15.37 | $4.28 | $19.65 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PARK) | $20.81 | $6.58 | $27.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (JEFFERSON) | $21.99 | $5.60 | $27.59 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $22.19 | $6.48 | $28.67 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ARAPAHOE) | $24.59 | $6.24 | $30.83 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ADAMS) | $20.31 | $4.24 | $24.55 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER (JEFFERSON) | $23.34 | $8.06 | $31.40 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $22.67 | $8.67 | $31.34 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (PARK) | $22.84 | $8.72 | $31.56 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (JEFFERSON) | $22.84 | $7.69 | $30.53 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $23.41 | $7.67 | $31.08 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ARAPAHOE) | $22.68 | $8.72 | $31.40 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (ADAMS) | $24.20 | $7.70 | $31.90 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $24.97 | $6.13 | $31.10 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (PARK) | $22.67 | $8.72 | $31.39 | SUCO2011-001 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $22.67 | $8.75 | $31.42 | SUCO2011-001 eff. 09/15/2011 |
| PAINTER (SPRAY ONLY) | $16.99 | $2.87 | $19.86 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (PARK) | $12.76 EO 13658 minimum $13.65 may apply | $3.20 | $15.96 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (CLEAR CREEK) | $13.14 EO 13658 minimum $13.65 may apply | $3.20 | $16.34 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS) (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON) | $12.43 EO 13658 minimum $13.65 may apply | $3.22 | $15.65 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) (PARK) | $9.42 EO 13658 minimum $13.65 may apply | $3.21 | $12.63 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) (JEFFERSON) | $9.73 EO 13658 minimum $13.65 may apply | $3.05 | $12.78 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $9.55 EO 13658 minimum $13.65 may apply | $3.05 | $12.60 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: PIPELAYER | $13.55 EO 13658 minimum $13.65 may apply | $2.41 | $15.96 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (PARK) | $15.08 | $3.10 | $18.18 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (JEFFERSON) | $16.29 | $4.25 | $20.54 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.96 | $4.04 | $21.00 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (ADAMS) | $17.71 | $2.83 | $20.54 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: LANDSCAPE AND IRRIGATION (CLEAR CREEK) | $14.98 | $3.16 | $18.14 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: LANDSCAPE AND IRRIGATION (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, JEFFERSON, PARK) | $12.26 EO 13658 minimum $13.65 may apply | $3.16 | $15.42 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: CONCRETE SAW (HAND HELD) (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $16.29 | $6.14 | $22.43 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: CONCRETE SAW (HAND HELD) (ADAMS) | $16.29 | $5.20 | $21.49 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (PARK) | $15.64 | $2.46 | $18.10 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (JEFFERSON) | $16.51 | $4.27 | $20.78 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $16.67 | $4.27 | $20.94 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (ADAMS) | $16.29 | $4.25 | $20.54 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: ASPHALT SPREADER | $18.58 | $4.65 | $23.23 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: ASPHALT SHOVELER | $21.21 | $4.25 | $25.46 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (PARK) | $17.41 | $1.86 | $19.27 | SUCO2011-001 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $16.29 | $4.25 | $20.54 | SUCO2011-001 eff. 09/15/2011 |
| IRONWORKER: REINFORCING (PARK) | $19.98 | $2.89 | $22.87 | SUCO2011-001 eff. 09/15/2011 |
| IRONWORKER: REINFORCING (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON) | $16.69 | $5.45 | $22.14 | SUCO2011-001 eff. 09/15/2011 |
| IRONWORKER: REINFORCING (ADAMS) | $22.14 | $0.77 | $22.91 | SUCO2011-001 eff. 09/15/2011 |
| IRONWORKER, STRUCTURAL | $18.22 | $6.01 | $24.23 | SUCO2011-001 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING:PAINTER (JEFFERSON) | $14.21 | $3.21 | $17.42 | SUCO2011-001 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER (ADAMS, ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, PARK) | $12.62 EO 13658 minimum $13.65 may apply | $3.21 | $15.83 | SUCO2011-001 eff. 09/15/2011 |
| GUARDRAIL INSTALLER (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $12.89 EO 13658 minimum $13.65 may apply | $3.20 | $16.09 | SUCO2011-001 eff. 09/15/2011 |
| GUARDRAIL INSTALLER (ADAMS) | $12.89 EO 13658 minimum $13.65 may apply | $3.45 | $16.34 | SUCO2011-001 eff. 09/15/2011 |
| FORM WORKER (ARAPAHOE) | $15.30 | $3.90 | $19.20 | SUCO2011-001 eff. 09/15/2011 |
| FENCE ERECTOR | $13.02 EO 13658 minimum $13.65 may apply | $3.20 | $16.22 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (JEFFERSON) | $15.19 | $4.72 | $19.91 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (CLEAR CREEK) | $15.70 | $2.14 | $17.84 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (ARAPHAOE, BROOMFIELD, ELBERT, GILPIN, PARK) | $15.24 | $3.81 | $19.05 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (ADAMS) | $13.96 | $2.80 | $16.76 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (JEFFERSON) | $26.78 | $5.44 | $32.22 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (ADAMS, ARAPAHOE, BROOMFIELD, ELBERT, GILPIN, PARK) | $27.25 | $7.10 | $34.35 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $35.13 | $6.83 | $41.96 | SUCO2011-001 eff. 09/15/2011 |
| ELECTRICIAN: EXCLUDES TRAFFIC SIGNAL INSTALLATION (ADAMS) | $31.00 | $14.01 | $45.01 | SUCO2011-001 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (PARK) | $17.09 | $2.85 | $19.94 | SUCO2011-001 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (JEFFERSON) | $18.02 | $3.42 | $21.44 | SUCO2011-001 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $18.37 | $3.00 | $21.37 | SUCO2011-001 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (ARAPAHOE) | $18.70 | $3.85 | $22.55 | SUCO2011-001 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (ADAMS) | $16.05 | $3.00 | $19.05 | SUCO2011-001 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (PARK) | $17.28 | $5.38 | $22.66 | SUCO2011-001 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (JEFFERSON) | $16.88 | $3.81 | $20.69 | SUCO2011-001 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN) | $19.11 | $5.46 | $24.57 | SUCO2011-001 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (ADAMS) | $16.78 | $3.57 | $20.35 | SUCO2011-001 eff. 09/15/2011 |
| CARPENTER, EXCLUDES FORM WORK (ARAPAHOE, BROOMFIELD, CLEAR CREEK, ELBERT, GILPIN, JEFFERSON, PARK) | $19.27 | $5.08 | $24.35 | SUCO2011-001 eff. 09/15/2011 |
| CARPENTER, EXCLUDES FORM WORK (ADAMS) | $16.61 | $3.88 | $20.49 | SUCO2011-001 eff. 09/15/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.