CO20260010, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

CO20260010 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER (FORM WORK ONLY)$33.11$12.17$45.28CARP9901-008
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS)$35.58$15.20$50.78ENGI0009-014
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS)$35.41$15.20$50.61ENGI0009-014
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER)$35.20$15.20$50.40ENGI0009-014
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR), POWER BROOM/SWEEPER (70 HP AND OVER)$35.03$15.20$50.23ENGI0009-014
eff. 05/01/2024
POWER EQUIPMENT OPERATOR: (1)-POWER BROOM/SWEEPER(UNDER 70 HP)$34.14$15.20$49.34ENGI0009-014
eff. 05/01/2024
TRUCK DRIVER: WATER TRUCK$14.88$2.07$16.95SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: PICKUP AND PILOT CAR$14.04$3.49$17.53SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK$18.89$3.49$22.38SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: MECHANIC$17.79$3.51$21.30SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: LOWBOY TRUCK (LAS ANIMAS)$19.77$3.25$23.02SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: LOWBOY TRUCK (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)$19.95$3.36$23.31SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: DUMP TRUCK$17.61$2.69$20.30SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER: DISTRIBUTOR$17.98$5.27$23.25SUCO2011-005
eff. 09/15/2011
TRUCK DRIVER (SEMI TRUCK)$17.58$4.67$22.25SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: TRACTOR$16.83$2.95$19.78SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCREED$16.21$3.76$19.97SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: SCRAPER$19.93$5.38$25.31SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ROLLER COMPACTOR (DIRT AND GRADE COMPACTION)$17.78$2.83$20.61SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: MECHANIC$18.91$4.20$23.11SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (LAS ANIMAS)$23.56$5.93$29.49SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)$23.58$6.66$30.24SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER$16.07$4.41$20.48SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GRADER/BLADE (LAS ANIMAS)$18.88$3.14$22.02SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: GRADER/BLADE (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)$18.40$4.20$22.60SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: FORKLIFT$18.30$5.01$23.31SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: DRILL$20.49$2.66$23.15SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: CHIPPER$22.04$8.26$30.30SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BULLDOZER$26.65$4.46$31.11SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER$18.43$3.12$21.55SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (LAS ANIMAS)$24.70$3.40$28.10SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)$23.19$4.18$27.37SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER$23.19$7.66$30.85SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER$23.14$7.51$30.65SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT PLANT$21.13$2.16$23.29SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT PAVER$22.67$8.72$31.39SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN$24.17$6.73$30.90SUCO2011-005
eff. 09/15/2011
POWER EQUIPMENT OPERATOR: (OILER)$22.54$9.22$31.76SUCO2011-005
eff. 09/15/2011
PAINTER (SPRAY ONLY)$17.54$3.52$21.06SUCO2011-005
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS) (EXCLUDES FLAGGERS)$12.39
EO 13658 minimum $13.65 may apply
$3.20$15.59SUCO2011-005
eff. 09/15/2011
LABORER: TRAFFIC CONTROL (FLAGGER)$9.42
EO 13658 minimum $13.65 may apply
$3.21$12.63SUCO2011-005
eff. 09/15/2011
LABORER: MASON TENDER-CEMENT/CONCRETE$12.44
EO 13658 minimum $13.65 may apply
$3.10$15.54SUCO2011-005
eff. 09/15/2011
LABORER: LANDSCAPE AND IRRIGATION$15.37$3.16$18.53SUCO2011-005
eff. 09/15/2011
LABORER: CONCRETE SAW (HAND HELD)$16.00$6.14$22.14SUCO2011-005
eff. 09/15/2011
LABORER: COMMON OR GENERAL (LAS ANIMAS)$14.52$3.53$18.05SUCO2011-005
eff. 09/15/2011
LABORER: COMMON OR GENERAL (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)$14.48$3.53$18.01SUCO2011-005
eff. 09/15/2011
IRONWORKER, STRUCTURAL$16.76$6.01$22.77SUCO2011-005
eff. 09/15/2011
IRONWORKER, REINFORCING$16.94$6.77$23.71SUCO2011-005
eff. 09/15/2011
HIGHWAY/PARKING LOT STRIPING: PAINTER$13.92$3.07$16.99SUCO2011-005
eff. 09/15/2011
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)$14.60$3.49$18.09SUCO2011-005
eff. 09/15/2011
ELECTRICIAN$28.06$8.76$36.82SUCO2011-005
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (LAS ANIMAS)$17.24$2.85$20.09SUCO2011-005
eff. 09/15/2011
CEMENT MASON/CONCRETE FINISHER (BACA, BENT, COSTILLA, CROWLEY, HUERFANO, KIOWA, OTERO, PROWERS)$17.70$2.53$20.23SUCO2011-005
eff. 09/15/2011
CARPENTER (EXCLUDES FORM WORK)$18.96$3.18$22.14SUCO2011-005
eff. 09/15/2011

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.