Colorado prevailing wage rates: CO20260011
Highway construction in Cheyenne, Kit Carson, Lincoln, Logan, Morgan, Phillips, Sedgwick, Washington, Yuma Counties.
CO20260011, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) | $37.34 | $15.20 | $52.54 | ENGI0009-015 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS) | $35.41 | $15.20 | $50.61 | ENGI0009-015 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER) | $35.78 | $15.20 | $50.98 | ENGI0009-015 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (3)-ASPHALT SCREED (KIT CARSON COUNTY) | $35.03 | $15.20 | $50.23 | ENGI0009-015 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR), POWER BROOM/SWEEPER (70 HP AND OVER) | $35.03 | $15.20 | $50.23 | ENGI0009-015 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (1)-POWER BROOM/SWEEPER(UNDER 70 HP) | $34.14 | $15.20 | $49.34 | ENGI0009-015 eff. 05/01/2024 |
| LABORER, COMMON OR GENERAL (KIT CARSON COUNTY) | $20.84 | $7.04 | $27.88 | LABO0720-004 eff. 05/01/2021 |
| TRUCK DRIVER: WATER TRUCK | $14.88 | $2.07 | $16.95 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: SEMI TRUCK (LOGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $15.80 | $4.67 | $20.47 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: SEMI TRUCK (CHEYENNE, KIT CARSON, LINCOLN, MORGAN) | $17.58 | $4.67 | $22.25 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | $14.04 | $3.49 | $17.53 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK | $18.79 | $3.49 | $22.28 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: MECHANIC | $17.79 | $3.51 | $21.30 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: LOWBOY TRUCK | $18.29 | $4.87 | $23.16 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (SEDGWICK) | $18.92 | $6.19 | $25.11 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (LINCOLN) | $14.15 | $3.83 | $17.98 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (CHEYENNE, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $18.52 | $5.96 | $24.48 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR | $17.98 | $5.27 | $23.25 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $16.83 | $2.95 | $19.78 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $21.30 | $6.40 | $27.70 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $19.93 | $5.38 | $25.31 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) | $16.52 | $4.87 | $21.39 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: OILER | $22.54 | $9.22 | $31.76 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (SEDGWICK) | $21.09 | $4.87 | $25.96 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (KIT CARSON) | $16.74 | $4.20 | $20.94 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $20.52 | $5.49 | $26.01 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SEDGWICK) | $27.48 | $4.87 | $32.35 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CHEYENNE, KIT CARSON, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $27.22 | $5.85 | $33.07 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 | $20.48 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $19.02 | $4.20 | $23.22 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $18.30 | $2.01 | $20.31 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: DRILL | $20.49 | $2.66 | $23.15 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: CHIPPER | $22.04 | $8.26 | $30.30 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $29.99 | $2.90 | $32.89 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $20.79 | $5.36 | $26.15 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (KIT CARSON) | $28.64 | $1.40 | $30.04 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $25.88 | $4.18 | $30.06 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $23.19 | $7.66 | $30.85 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (SEDQWICK) | $23.92 | $9.22 | $33.14 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (CHEYENNE, KIT CARSON, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $23.79 | $7.59 | $31.38 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PLANT | $21.13 | $2.16 | $23.29 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $22.67 | $8.72 | $31.39 | SUCO2011-006 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN | $24.56 | $6.68 | $31.24 | SUCO2011-006 eff. 09/15/2011 |
| PAINTER (SPRAY ONLY) | $17.54 | $3.52 | $21.06 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) | $12.39 EO 13658 minimum $13.65 may apply | $3.20 | $15.59 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) | $9.42 EO 13658 minimum $13.65 may apply | $3.21 | $12.63 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $14.71 | $3.29 | $18.00 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: LANDSCAPE AND IRRIGATION | $12.81 EO 13658 minimum $13.65 may apply | $3.16 | $15.97 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: CONCRETE SAW (HAND HELD) | $16.00 | $6.14 | $22.14 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (CHEYENNE, LINCOLN, LOGAN, MORGAN, PHILLIPS, SEDGQICK, WASHINGTON, YUMA) | $12.44 EO 13658 minimum $13.65 may apply | $3.53 | $15.97 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: ASPHALT SPREADER | $22.67 | $8.72 | $31.39 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (SEDGWICK) | $15.79 | $4.87 | $20.66 | SUCO2011-006 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (CHEYENNE, KIT CARSON, LINCOLN, LOGAN, MORGAN, PHILLIPS, WASHINGTON, YUMA) | $17.02 | $5.79 | $22.81 | SUCO2011-006 eff. 09/15/2011 |
| IRONWORKER, STRUCTURAL | $16.76 | $6.01 | $22.77 | SUCO2011-006 eff. 09/15/2011 |
| IRONWORKER, REINFORCING | $21.12 | $3.89 | $25.01 | SUCO2011-006 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $12.90 EO 13658 minimum $13.65 may apply | $3.07 | $15.97 | SUCO2011-006 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | $14.60 | $3.49 | $18.09 | SUCO2011-006 eff. 09/15/2011 |
| ELECTRICIAN | $28.06 | $8.76 | $36.82 | SUCO2011-006 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (LINCOLN) | $21.00 | $1.40 | $22.40 | SUCO2011-006 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (KIT CARSON) | $17.98 | $2.53 | $20.51 | SUCO2011-006 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (CHEYENNE, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $19.22 | $2.74 | $21.96 | SUCO2011-006 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (LINCOLN) | $20.98 | $3.89 | $24.87 | SUCO2011-006 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (CHEYENNE, KIT CARSON, LOGAN, MORGAN, PHILLIPS, SEDGWICK, WASHINGTON, YUMA) | $20.28 | $4.50 | $24.78 | SUCO2011-006 eff. 09/15/2011 |
| CARPENTER (EXCLUDES FORM WORK) | $18.96 | $3.18 | $22.14 | SUCO2011-006 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP (UP TO AND INCLUDING 6 CU. YDS.) (KIT CARSON COUNTY) | $27.10 | $4.87 | $31.97 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (UP TO 39 CU. YDS UP TO AND INCLUDING 54 CU. YDS) (KIT CARSON COUNTY) | $28.21 | $4.87 | $33.08 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (OVER 80 CU. YDS UP TO AND INCLUDING 104 CU. YDS) (KIT CARSON COUNTY) | $28.77 | $4.87 | $33.64 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (OVER 6 CU. YDS UP TO AND INCLUDING 14 CU. YDS) (KIT CARSON COUNTY) | $27.25 | $4.87 | $32.12 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (OVER 54 CU. YDS UP TO AND INCLUDING 79 CU. YDS) (KIT CARSON COUNTY) | $28.50 | $4.87 | $33.37 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (OVER 30 CU.YDS UP TO AND INCLUDING 38 CU. YDS) (KIT CARSON COUNTY) | $27.93 | $4.87 | $32.80 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (OVER 14 CU. YDS UP TO AND INCLUDING 29 CU. YDS) (KIT CARSON COUNTY) | $27.59 | $4.87 | $32.46 | TEAM0455-001 eff. 05/01/2025 |
| TRUCK DRIVER: DUMP (OVER 104 CU. YDS) (KIT CARSON COUNTY) | $29.06 | $4.87 | $33.93 | TEAM0455-001 eff. 05/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.