Colorado prevailing wage rates: CO20260013
Highway construction in Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Rio Blanco, Routt, Summit Counties.
CO20260013, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
2 classifications added, 2 removed or reworded
- removed TRAFFIC SIGNALIZATION: Traffic Signal Installation was $26.42 + $9.94 fringe
- removed TRAFFIC SIGNALIZATION: Traffic Signal Installation was $29.42 + $10.08 fringe
- added TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION ZONE 1 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES $26.42 + $9.93 fringe
- added TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION ZONE 2 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES $29.42 + $10.08 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (EXCLUDES FORM WORK) | $33.11 | $12.17 | $45.28 | CARP9901-009 eff. 05/01/2024 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION ZONE 2 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $29.42 | $10.08 | $39.50 | ELEC0068-017 eff. 03/01/2011 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION ZONE 1 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $26.42 | $9.93 | $36.35 | ELEC0068-017 eff. 03/01/2011 |
| POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER) | $35.41 | $15.20 | $50.61 | ENGI0009-013 eff. 05/01/2024 |
| POWER EQUIPMENT OPERATOR: (3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR) | $35.03 | $15.20 | $50.23 | ENGI0009-013 eff. 05/01/2024 |
| IRONWORKER: STRUCTURAL (GARFIELD COUNTY ONLY) | $39.21 | $12.50 | $51.71 | IRON0024-006 eff. 11/01/2024 |
| TRUCK DRIVER: WATER TRUCK (RIO BLANCO) | $17.25 | $3.75 | $21.00 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: WATER TRUCK (JACKSON, LAKE, MOFFATT, PTIKIN, ROUTT, SUMMIT) | $20.39 | $3.43 | $23.82 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: WATER TRUCK (GRAND) | $21.19 | $3.01 | $24.20 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: WATER TRUCK (GARFIELD) | $21.00 | $5.88 | $26.88 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: WATER TRUCK (EAGLE) | $23.05 | $2.90 | $25.95 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: SEMI | $20.72 | $0.00 | $20.72 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | $14.04 | $3.49 | $17.53 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK | $14.60 | $3.49 | $18.09 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: MECHANIC | $17.79 | $3.51 | $21.30 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: LOWBOY TRUCK (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $18.43 | $4.56 | $22.99 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: LOWBOY TRUCK (EAGLE) | $18.89 | $4.56 | $23.45 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (SUMMIT) | $15.27 | $5.27 | $20.54 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (RIO BLANCO) | $17.26 | $4.63 | $21.89 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (PITKIN) | $20.13 | $4.15 | $24.28 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (GRAND, JACKSON, LAKE, MOFFATT, ROUTT) | $17.79 | $4.02 | $21.81 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (GARFIELD) | $16.29 | $3.83 | $20.12 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DUMP TRUCK (EAGLE) | $16.17 | $3.83 | $20.00 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR (RIO BLANCO) | $15.80 | $5.27 | $21.07 | SUCO2011-008 eff. 09/15/2011 |
| TRUCK DRIVER: DISTRIBUTOR (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFAT, PITKIN, ROUTT, SUMMIT) | $19.07 | $4.35 | $23.42 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $15.08 | $2.95 | $18.03 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (GRAND) | $23.29 | $4.05 | $27.34 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, SUMMIT) | $23.76 | $5.05 | $28.81 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCREED (EAGLE) | $17.04 | $3.98 | $21.02 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $20.60 | $7.99 | $28.59 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL (SUMMIT) | $16.28 | $4.41 | $20.69 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL (GRAND) | $23.48 | $4.41 | $27.89 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $20.70 | $4.41 | $25.11 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROTOMILL (EAGLE) | $18.86 | $4.41 | $23.27 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (SUMMIT) | $24.38 | $6.11 | $30.49 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (RIO BLANCO) | $23.67 | $9.22 | $32.89 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFAT, PITKIN, ROUTT) | $22.72 | $5.98 | $28.70 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: OILER (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $24.04 | $7.77 | $31.81 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: OILER (EAGLE) | $23.82 | $7.62 | $31.44 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (GARFIELD) | $19.80 | $4.20 | $24.00 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (EAGLE, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $23.31 | $3.93 | $27.24 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SUMMIT) | $25.88 | $7.01 | $32.89 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (RIO BLANCO) | $23.67 | $9.22 | $32.89 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (JACKSON, LAKE, MOFFATT, ROUTT) | $24.07 | $7.92 | $31.99 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (GRAND, PITKIN) | $22.67 | $8.72 | $31.39 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (GARFIELD) | $21.93 | $9.22 | $31.15 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (EAGLE) | $24.98 | $7.55 | $32.53 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 | $20.48 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $23.05 | $6.45 | $29.50 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: GRADE CHECKER | $23.82 | $9.22 | $33.04 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $18.30 | $5.01 | $23.31 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: DRILL | $20.84 | $2.66 | $23.50 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: CRANE | $23.82 | $9.22 | $33.04 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: CHIPPER | $22.04 | $8.26 | $30.30 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $26.78 | $7.05 | $33.83 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (SUMMIT) | $22.67 | $8.72 | $31.39 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (RIO BLANCO) | $21.66 | $0.00 | $21.66 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (GRAND) | $21.67 | $8.22 | $29.89 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, ROUTT) | $21.92 | $7.66 | $29.58 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (EAGLE) | $23.35 | $7.78 | $31.13 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (SUMMIT) | $19.77 | $4.28 | $24.05 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $21.04 | $5.18 | $26.22 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (GARFIELD) | $24.63 | $0.00 | $24.63 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (EAGLE) | $18.25 | $4.32 | $22.57 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (SUMMIT) | $24.30 | $5.75 | $30.05 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $22.92 | $6.15 | $29.07 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (GARFIELD) | $19.40 | $4.42 | $23.82 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (EAGLE) | $22.56 | $7.02 | $29.58 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $25.61 | $6.96 | $32.57 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (GRAND) | $22.67 | $8.72 | $31.39 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $23.15 | $8.07 | $31.22 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (EAGLE) | $23.01 | $8.72 | $31.73 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PLANT | $19.27 | $4.47 | $23.74 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $22.67 | $8.72 | $31.39 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (RIO BLANCO) | $23.67 | $9.22 | $32.89 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, ROUTT) | $24.09 | $7.93 | $32.02 | SUCO2011-008 eff. 09/15/2011 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (EAGLE, SUMMIT) | $22.67 | $8.72 | $31.39 | SUCO2011-008 eff. 09/15/2011 |
| PAINTER: SPRAY ONLY (SUMMIT) | $19.96 | $3.52 | $23.48 | SUCO2011-008 eff. 09/15/2011 |
| PAINTER: SPRAY ONLY (GARFIELD, GRAND. JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $17.54 | $3.52 | $21.06 | SUCO2011-008 eff. 09/15/2011 |
| PAINTER: SPRAY ONLY (EAGLE) | $17.49 | $3.52 | $21.01 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) (JACKSON) | $12.93 EO 13658 minimum $13.65 may apply | $3.22 | $16.15 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) (EAGLE, GARFIELD, GRAND, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $12.39 EO 13658 minimum $13.65 may apply | $3.20 | $15.59 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: TRAFFIC CONTROL (FLAGGER) | $9.42 EO 13658 minimum $13.65 may apply | $3.21 | $12.63 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (GARFIELD) | $14.87 | $3.10 | $17.97 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (EAGLE, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMITT) | $12.44 EO 13658 minimum $13.65 may apply | $3.10 | $15.54 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: LANDSCAPE AND IRRIGATION (SUMMIT) | $13.09 EO 13658 minimum $13.65 may apply | $3.16 | $16.25 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: LANDSCAPE AND IRRIGATION (PITKIN) | $14.16 | $3.16 | $17.32 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: LANDSCAPE AND IRRIGATION (EAGLE) | $14.84 | $3.16 | $18.00 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: CONCRETE SAW (HAND HELD) | $16.00 | $6.14 | $22.14 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (GRAND) | $19.14 | $3.53 | $22.67 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: COMMON OR GENERAL (EAGLE, GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO. ROUTT, SUMMITT) | $12.44 EO 13658 minimum $13.65 may apply | $3.53 | $15.97 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (SUMMIT) | $16.77 | $3.26 | $20.03 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (RIO BLANCO) | $18.97 | $3.75 | $22.72 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (PITKIN) | $17.50 | $3.75 | $21.25 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (JACKSON, LAKE, MOFFAT, ROUTT) | $17.75 | $3.75 | $21.50 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (GRAND) | $17.90 | $3.02 | $20.92 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (GARFIELD) | $18.66 | $3.53 | $22.19 | SUCO2011-008 eff. 09/15/2011 |
| LABORER: ASPHALT RAKER (EAGLE) | $16.36 | $3.26 | $19.62 | SUCO2011-008 eff. 09/15/2011 |
| LABORER, LANDSCAPE AND IRRIGATION (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, RIO BLANCO, ROUTT) | $13.54 EO 13658 minimum $13.65 may apply | $3.16 | $16.70 | SUCO2011-008 eff. 09/15/2011 |
| IRONWORKER: STRUCTURAL (EXCLUDES GUARDRAIL INSTALLATION) | $22.22 | $6.01 | $28.23 | SUCO2011-008 eff. 09/15/2011 |
| IRONWORKER: REINFORCING (EXCLUDES GUARDRAIL INSTALLATION) | $16.94 | $6.77 | $23.71 | SUCO2011-008 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMITT) | $13.97 | $3.07 | $17.04 | SUCO2011-008 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER (EAGLE) | $13.85 | $3.07 | $16.92 | SUCO2011-008 eff. 09/15/2011 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | $14.60 | $3.49 | $18.09 | SUCO2011-008 eff. 09/15/2011 |
| GUARDRAIL INSTALLER (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $12.78 EO 13658 minimum $13.65 may apply | $3.31 | $16.09 | SUCO2011-008 eff. 09/15/2011 |
| GUARDRAIL INSTALLER (EAGLE) | $12.78 EO 13658 minimum $13.65 may apply | $3.46 | $16.24 | SUCO2011-008 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (SUMMIT) | $16.75 | $4.10 | $20.85 | SUCO2011-008 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION GROUNDSMAN (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $15.93 | $4.01 | $19.94 | SUCO2011-008 eff. 09/15/2011 |
| ELECTRICIAN: TRAFFIC SIGNALIZATION ELECTRICIAN (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $28.24 | $8.52 | $36.76 | SUCO2011-008 eff. 09/15/2011 |
| ELECTRICIAN (EXCLUDES TRAFFIC SIGNALIZATION) | $28.06 | $8.76 | $36.82 | SUCO2011-008 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (SUMMIT) | $15.55 | $2.85 | $18.40 | SUCO2011-008 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $18.23 | $2.85 | $21.08 | SUCO2011-008 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (GARFIELD) | $17.27 | $2.16 | $19.43 | SUCO2011-008 eff. 09/15/2011 |
| CEMENT MASON/CONCRETE FINISHER (EAGLE) | $17.59 | $2.85 | $20.44 | SUCO2011-008 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (GARFIELD) | $19.55 | $4.09 | $23.64 | SUCO2011-008 eff. 09/15/2011 |
| CARPENTER, FORM WORK ONLY (EAGLE, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $15.92 | $5.38 | $21.30 | SUCO2011-008 eff. 09/15/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.