Connecticut prevailing wage rates: CT20260023
Building construction in New Haven County.
CT20260023, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | $82.46 | ASBE0033-002 eff. 06/01/2025 |
| BRICKLAYER | $45.56 | $36.94 | $82.50 | BRCT0001-001 eff. 01/05/2026 |
| CEMENT MASON/CONCRETE FINISHER | $45.56 | $36.94 | $82.50 | BRCT0001-005 eff. 01/05/2026 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND RESILIENT) | $42.03 | $29.19 | $71.22 | CARP0326-023 eff. 05/05/2025 |
| FLOOR LAYER: CARPET ONLY | $42.03 | $29.19 | $71.22 | CARP0326-024 eff. 05/05/2025 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $42.03 | $29.19 | $71.22 | CARP0326-025 eff. 05/05/2025 |
| METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS) | $42.03 | $29.19 | $71.22 | CARP0326-026 eff. 05/05/2025 |
| CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CARP0326-027 eff. 05/05/2025 |
| SOFT FLOOR LAYER | $42.03 | $29.19 | $71.22 | CARP0326-036 eff. 05/05/2025 |
| MILLWRIGHT | $45.14 | $30.24 | $75.38 | CARP1121-006 eff. 01/05/2026 |
| ELECTRICIAN | $46.48 | $38.05 | $84.53 | ELEC0090-012 eff. 06/01/2024 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $46.48 | $38.05 | $84.53 | ELEC0090-013 eff. 06/01/2025 |
| ELECTRICIAN: COMMUNICATION TECHNICIAN | $46.48 | $38.05 | $84.53 | ELEC0090-014 eff. 06/01/2025 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $46.48 | $38.05 | $84.53 | ELEC0090-015 eff. 06/01/2025 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION) | $47.40 | $36.74 | $84.14 | ELEC0488-003 eff. 06/01/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $66.72 | $38.44 | $105.16 | ELEV0091-002 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOEScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | ENGI0478-004 eff. 04/06/2025 |
POWER EQUIPMENT OPERATOR, BULLDOZER: ROUGH GRADE DOZERScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 | ENGI0478-005 eff. 04/06/2025 |
POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 | ENGI0478-005 eff. 04/06/2025 |
POWER EQUIPMENT OPERATOR: CRANE UNDER 100 TON RATED CAPACITY)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 | ENGI0478-012 eff. 04/06/2025 |
POWER EQUIPMENT OPERATOR: LOADER - 7 CUBIC YARDS OR OVERScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 | ENGI0478-016 eff. 04/06/2025 |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL | $45.25 | $43.62 | $88.87 | IRON0424-001 eff. 06/02/2025 |
| LABORER: MASON TENDER- CEMENT/CONCRETE | $35.70 | $28.85 | $64.55 | LABO0455-001 eff. 04/06/2025 |
| GLAZIER | $43.13 | $26.75 | $69.88 | PAIN0011-014 eff. 06/01/2025 |
| PAINTER: BRUSH AND ROLLER | $39.57 | $26.75 | $66.32 | PAIN0011-021 eff. 06/01/2025 |
| DRYWALL FINISHER/TAPER | $40.32 | $26.75 | $67.07 | PAIN0011-023 eff. 06/01/2025 |
| PLUMBER | $50.58 | $35.85 | $86.43 | PLUM0777-001 eff. 06/01/2025 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $50.58 | $35.85 | $86.43 | PLUM0777-008 eff. 06/01/2025 |
| ROOFER: SLATE AND TILE | $45.65 | $23.53 | $69.18 | ROOF0009-001 eff. 01/01/2026 |
| ROOFER: COMPOSITION | $45.15 | $23.53 | $68.68 | ROOF0009-001 eff. 01/01/2026 |
| SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 | $89.20 | SHEE0040-001 eff. 07/01/2025 |
| SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 | $89.20 | SHEE0040-002 eff. 07/01/2025 |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) | $44.70 | $44.50 | $89.20 | SHEE0040-008 eff. 07/01/2025 |
| LABORER: COMMON OR GENERAL | $27.85 | $18.04 | $45.89 | SUCT2016-005 eff. 09/19/2018 |
| TRUCK DRIVER: DUMP TRUCK | $36.39 | $32.68 | $69.07 | TEAM0191-001 eff. 04/06/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.