District of Columbia prevailing wage rates: DC20260001
Heavy, Highway construction in Washington, D.C. County.
DC20260001, modification 6, published 08/27/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 5
1 change is not listed because we could not check it against both modifications. See the official determination.
No existing rate changed amount.
29 classifications added, 24 removed or reworded
- removed LABORERS GROUP 1 was $34.41 + $8.70 fringe
- removed LABORERS GROUP 2 was $35.48 + $8.70 fringe
- removed LABORERS GROUP 3 was $38.17 + $8.70 fringe
- removed LABORERS GROUP 4 was $39.29 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 - CARLAODERS, CHOKER SETTER, CONCRETE CREWMAN, CRUSHED FEEDER, DEMOLITION LABORERS, INCLUDING SALVAGING ALL MATERIAL, LOADING, CLEANING UP, WRECKING, DUMPMENT, FLAGMENT, FENCE ERECTOR AND INSTALLER (OTHER THAN CHAIN LINK), INCLUDING INSTALLATION AND ERECTION OF FENCE, GUARD RAILS, MEDIAL RAILS, REFERENCE POSTS, GUIDE POSTS AND RIGHT-OF-WAY MARKERS, FORM STRIPPERS, GENERAL LABORERS, RAILROAD TRACK LABORERS, RIPRAP MAN, SCALE MAN, STAKE JUMPER, STRUCTURE MOVER, INCLUDES FOUNDATION, SEPARATION, PREPARATION, CRIBBING, SHORING, JACKING AND UNLOADING OF STRUCTURES, WATER NOZZLEMAN, TIMBER BUCKER AND FALLER, TRUCK LOADER, WATER BOYS, TOOL ROOM MEN $33.25 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 - COMBINED AIR AND WATER NOZZLEMAN, CEMENT HANDLER, DOPE POT FIREMAN (NONMECHANICAL), FORM CLEANING MACHINE, MECHANICAL RAILROAD EQUIPMENT (INCLUDES SPIKER, PULLER, TILE CLEANER, TAMPER, PIPE WRAPPER, POWER DRIVEN WHEELBARROWS, OPERATORS OF HAND DERRICKS, TOWMASTERS, SCOOTSCRETES, BUGGYMOBILES, AND SIMILAR EQUIPMENT), TAMPER OR RAMMER OPERATOR, TRESTLE SCAFFOLD BUILDERS OVER ONE TIER HIGH, POWER TOOL OPERATOR (GAS, ELECTRIC, OR PNEUMATIC), SANDBLAST OR GUNNITE TAILHOSE MAN, SCAFFOLD ERECTOR (STEEL OR WOOD), VIBRATOR OPERATOR (UP TO 4 FEET), ASPHALT CUTTER, MORTAR MEN, SHORER AND LAGGER, CREOSOTE MATERIAL HANDLER, CORROSIVE ENAMEL OR EQUAL, PAVER BREAKER AND JACKHAMMER OPERATORS $34.27 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 - MULTI-SECTION PIPE LAYER, NON-METALLIC CLAY AND CONCRETE PIPE LAYER (INCLUDING CAULKER, COLLARMAN, JOINTER, RIGGER AND JACKER, THERMAL WELDER AND CORRUGATED METAL CULVERT PIPE LAYER $34.27 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 - ASPHALT BLOCK PNEUMATIC CUTTER, ASPHALT ROLLER, WALKER, CHAINSAW OPERATOR WITH ATTACHMENT, CONCRETE SAW (WALKING), HIGH SCALERS, JACKHAMMER OPERATOR *USING OVER 6 FEET OF STEEL), VIBRATORY OPERATOR (4 FEET AND OVER), WELL POINT INSTALLER, AIR TRAC OPERATOR $34.32 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 - ASPHALT SCREEDER, BIG DRILLS, CUT OF THE HOLE DRILLS (1 1/2" PISTON OR LARGER), DOWN THE HOLE DRILLS (3 1/2" PISTON OR LARGER) GUNNITE OR SANDBLASTER NOZZLEMAN, ASPHALT RAKER, ASPHALT TAMPER, FORM SETTER, DEMOLITION TORCH OPERATOR, SHOTCRETE NOZZLEMEN AND POTMAN $35.00 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 - POWDERMAN, MASTER FORM SETTERS $35.93 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 - BRICK PAVER (ASPHALT BLOCK PAVER, ASPHALT BLOCK SAWMAN, ASPHALT BLOCK GRINDER, HASTINGS BLOCK OR SIMILAR TYPE) $36.81 + $8.70 fringe
- added LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 - LICENSED POWDERMEN $37.95 + $8.70 fringe
- added LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (1-14) AND HOURS (7) $44.04 + $8.70 fringe
- added LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (14-18) AND HOURS (6) $51.82 + $8.70 fringe
- added LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 1 - BRAKEMAN, BULL GANG, DUMPER, TRACKMEN, CONCRETE MAN $34.41 + $8.70 fringe
- added LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 2 - CHUCK TENDER, POWDERMEN IN PRIME HOUSE, FORM SETTERS AND MOVERS, NIPPERS, CABLEMAN, HOUSEMAN, GROUTMAN, BELL OR SIGNALMAN, TOP OR BOTTOM VIBRATORY OPERATOR $35.48 + $8.70 fringe
- added LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 3 - MINERS, RE-BAR UNDERGROUND, CONCRETE OR GUNNITE NOZZLEMEN, POWDERMEN, TIMBERMEN AND RE-TIMBERMEN, WOOD STEEL INCLUDING LINER PLATE OR OTHER SUPPORT, MATERIAL MOTORMAN, CAULKERS, DIAMOND DRILL OPERATORS, RIGGERS, CEMENT FINISHERS-UNDERGROUND, WELDERS AND BURNERS, SHIELD DRIVER, AIR TRAC OPERATOR, SHOT CRETE NOZZLEMAN AND POTMAN $38.17 + $8.70 fringe
- added LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 4 - MUCKING MACHINE OPERATOR (AIR) $39.29 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 was $33.25 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 was $34.27 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 was $34.27 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 was $34.32 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 was $35.00 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 was $35.93 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 was $36.81 + $8.70 fringe
- removed LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 was $37.95 + $8.70 fringe
- added METAL POLISHING AND REFINISHING $28.46 + $11.56 fringe
- added PAINTERS: ALL INDUSTRIAL WORK $34.30 + $12.98 fringe
- added PAINTERS: BRIDGES, HEAVY HIGHWAY, LEAD ABATEMENT AND FLAME/THERMAL SPRAY $42.93 + $13.77 fringe
- added PLUMBERS (PAID $53.30 + $23.71 fringe
- removed PLUMBERS A. was $53.30 + $23.71 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 - TOWER CRANES AND CRANES 100 TON AND OVER. (PAID $45.76 + $13.27 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 - 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. (PAID $43.44 + $13.27 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 - CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. (PAID $40.73 + $13.27 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 - FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). (PAID $36.31 + $13.27 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 - BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). (PAID $31.09 + $13.27 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 - FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. (PAID $28.39 + $13.27 fringe
- added POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 - MASTER MECHANIC. (PAID $47.18 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING was $43.44 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 TOWER CRANES AND CRANES 100 TON AND OVER. A. was $45.76 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. was $40.73 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). A. was $36.31 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. was $31.09 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. A. was $28.39 + $13.27 fringe
- removed POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 MASTER MECHANIC. A. was $47.18 + $13.27 fringe
- added SHEET METAL WORKER (PAID $53.42 + $23.20 fringe
- removed SHEET METAL WORKER A. was $53.42 + $23.20 fringe
- added STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC (PAID $55.00 + $24.46 fringe
- removed STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC A. was $55.00 + $24.46 fringe
- added TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRACTOR TRAILER, LOW BOY (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S $33.75 + $7.30 fringe
- added TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRUCK DRIVERS (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S $31.75 + $7.30 fringe
- removed TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S was $33.75 + $7.30 fringe
- removed TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S was $31.75 + $7.30 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KIND DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY) | $40.77 | $20.17 | $60.94 | ASBE0024-001 eff. 10/01/2024 |
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS.) (A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.) | $24.46 | $10.19 | $34.65 | ASBE0024-002 eff. 10/01/2024 |
FIRE STOP TECHNICIAN (INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS) (A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.) | $30.21 | $10.43 | $40.64 | ASBE0024-005 eff. 10/01/2024 |
| BOILERMAKERS | $47.37 | $25.60 | $72.97 | BOIL0193-001 eff. 01/01/2025 |
| BRICKLAYER | $38.80 | $15.17 | $53.97 | BRDC0001-001 eff. 04/27/2025 |
| BRICKLAYER: REFRACTORY (FIREBRICK) | $43.94 | $17.74 | $61.68 | BRMD0001-004 eff. 04/27/2025 |
| CARPENTER/LATHER | $34.41 | $14.33 | $48.74 | CARP0197-010 eff. 05/01/2024 |
| MILLWRIGHT | $39.50 | $17.32 | $56.82 | CARP0219-001 eff. 05/01/2025 |
| PILEDRIVERMAN | $36.60 | $14.47 | $51.07 | CARP0474-006 eff. 05/01/2024 |
| DIVER | $43.92 | $14.47 | $58.39 | CARP0474-007 eff. 05/01/2024 |
| DIVER TENDER | $36.60 | $14.47 | $51.07 | CARP0474-007 eff. 05/01/2024 |
| ELECTRICIANS | $59.50 | $23.06 | $82.56 | ELEC0026-001 eff. 06/02/2025 |
| LINE CONSTRUCTION: CABLE SPLICERS | $44.56 | $17.50 | $62.06 | ELEC0070-001 eff. 05/05/2024 |
| LINE CONSTRUCTION: EQUIPMENT OPERATORS | $44.56 | $17.50 | $62.06 | ELEC0070-001 eff. 05/05/2024 |
| LINE CONSTRUCTION: GROUNDMEN | $18.00 | $11.66 | $29.66 | ELEC0070-001 eff. 05/05/2024 |
| LINE CONSTRUCTION: LINEMEN | $44.56 | $17.50 | $62.06 | ELEC0070-001 eff. 05/05/2024 |
| LINE CONSTRUCTION: TRUCK DRIVER | $23.00 | $12.76 | $35.76 | ELEC0070-001 eff. 05/05/2024 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 - TOWER CRANES AND CRANES 100 TON AND OVER. (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $45.76 | $13.27 | $59.03 | ENGI0077-001 eff. 05/01/2025 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 - 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $43.44 | $13.27 | $56.71 | ENGI0077-001 eff. 05/01/2025 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 - CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $40.73 | $13.27 | $54.00 | ENGI0077-001 eff. 05/01/2025 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 - FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $36.31 | $13.27 | $49.58 | ENGI0077-001 eff. 05/01/2025 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 - BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $31.09 | $13.27 | $44.36 | ENGI0077-001 eff. 05/01/2025 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 - FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $28.39 | $13.27 | $41.66 | ENGI0077-001 eff. 05/01/2025 |
POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 - MASTER MECHANIC. (PAIDScope and notesHOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY.) | $47.18 | $13.27 | $60.45 | ENGI0077-001 eff. 05/01/2025 |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 1 - GRADALL OPERATOR, CRANE | $37.07 | $11.17 | $48.24 | ENGI0077-002 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 2 - BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER, RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER | $32.89 | $11.17 | $44.06 | ENGI0077-002 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 3 - BROOM TRUCK, ASPHALT ROLLER | $28.09 | $11.17 | $39.26 | ENGI0077-002 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 4 - AIR COMPRESSOR, GRADE ROLLERS | $25.14 | $11.17 | $36.31 | ENGI0077-002 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 5 - MECHANIC | $37.93 | $10.97 | $48.90 | ENGI0077-002 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 - CRANES 50 TON AND ABOVE. (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $41.40 | $11.55 | $52.95 | ENGI0077-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 - CRANES UNDER 50 TON CAPACITY, BOOM TRUCKS. (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $35.00 | $11.55 | $46.55 | ENGI0077-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 - GRADALL, LEAD MECHANIC. (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $33.80 | $11.55 | $45.35 | ENGI0077-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 - EXCAVATORS, BACKHOES, FRONT-END LOADERS, FORK LIFT/LULL, BULLDOZERS, MOTOR GRADERS, MECHANIC 1, HYDRAULIC TAMPER AND HOE PACK, PAVING MIXERS, PILE DRIVING ENGINES, BATCH PLANT, CONCRETE PUMPS, LOW-BOY DRIVER, LUBE TRUCK. (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $33.26 | $11.55 | $44.81 | ENGI0077-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 - KNUCKLE BOOM, TRENCHING MACHINE, WELL DRILLING MACHINES, CONCRETE MIXERS, ASSISTANT MECHANIC, MINI EXCAVATOR UNDER 10,000 LBS. GROSS WEIGHT. (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $31.16 | $11.55 | $42.71 | ENGI0077-003 eff. 07/01/2025 |
POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 - OILER, DUMP TRUCK, SKID STEER/BOBCAT, ROLLERS. (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $25.89 | $11.55 | $37.44 | ENGI0077-003 eff. 07/01/2025 |
| IRONWORKER, STRUCTURAL AND ORNAMENTAL | $37.86 | $25.86 | $63.72 | IRON0005-005 eff. 06/01/2024 |
| IRONWORKER, REINFORCING | $31.88 | $23.78 | $55.66 | IRON0005-012 eff. 05/01/2024 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 - CARLAODERS, CHOKER SETTER, CONCRETE CREWMAN, CRUSHED FEEDER, DEMOLITION LABORERS, INCLUDING SALVAGING ALL MATERIAL, LOADING, CLEANING UP, WRECKING, DUMPMENT, FLAGMENT, FENCE ERECTOR AND INSTALLER (OTHER THAN CHAIN LINK), INCLUDING INSTALLATION AND ERECTION OF FENCE, GUARD RAILS, MEDIAL RAILS, REFERENCE POSTS, GUIDE POSTS AND RIGHT-OF-WAY MARKERS, FORM STRIPPERS, GENERAL LABORERS, RAILROAD TRACK LABORERS, RIPRAP MAN, SCALE MAN, STAKE JUMPER, STRUCTURE MOVER, INCLUDES FOUNDATION, SEPARATION, PREPARATION, CRIBBING, SHORING, JACKING AND UNLOADING OF STRUCTURES, WATER NOZZLEMAN, TIMBER BUCKER AND FALLER, TRUCK LOADER, WATER BOYS, TOOL ROOM MEN | $33.25 | $8.70 | $41.95 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 - COMBINED AIR AND WATER NOZZLEMAN, CEMENT HANDLER, DOPE POT FIREMAN (NONMECHANICAL), FORM CLEANING MACHINE, MECHANICAL RAILROAD EQUIPMENT (INCLUDES SPIKER, PULLER, TILE CLEANER, TAMPER, PIPE WRAPPER, POWER DRIVEN WHEELBARROWS, OPERATORS OF HAND DERRICKS, TOWMASTERS, SCOOTSCRETES, BUGGYMOBILES, AND SIMILAR EQUIPMENT), TAMPER OR RAMMER OPERATOR, TRESTLE SCAFFOLD BUILDERS OVER ONE TIER HIGH, POWER TOOL OPERATOR (GAS, ELECTRIC, OR PNEUMATIC), SANDBLAST OR GUNNITE TAILHOSE MAN, SCAFFOLD ERECTOR (STEEL OR WOOD), VIBRATOR OPERATOR (UP TO 4 FEET), ASPHALT CUTTER, MORTAR MEN, SHORER AND LAGGER, CREOSOTE MATERIAL HANDLER, CORROSIVE ENAMEL OR EQUAL, PAVER BREAKER AND JACKHAMMER OPERATORS | $34.27 | $8.70 | $42.97 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 - MULTI-SECTION PIPE LAYER, NON-METALLIC CLAY AND CONCRETE PIPE LAYER (INCLUDING CAULKER, COLLARMAN, JOINTER, RIGGER AND JACKER, THERMAL WELDER AND CORRUGATED METAL CULVERT PIPE LAYER | $34.27 | $8.70 | $42.97 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 - ASPHALT BLOCK PNEUMATIC CUTTER, ASPHALT ROLLER, WALKER, CHAINSAW OPERATOR WITH ATTACHMENT, CONCRETE SAW (WALKING), HIGH SCALERS, JACKHAMMER OPERATOR *USING OVER 6 FEET OF STEEL), VIBRATORY OPERATOR (4 FEET AND OVER), WELL POINT INSTALLER, AIR TRAC OPERATOR | $34.32 | $8.70 | $43.02 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 - ASPHALT SCREEDER, BIG DRILLS, CUT OF THE HOLE DRILLS (1 1/2" PISTON OR LARGER), DOWN THE HOLE DRILLS (3 1/2" PISTON OR LARGER) GUNNITE OR SANDBLASTER NOZZLEMAN, ASPHALT RAKER, ASPHALT TAMPER, FORM SETTER, DEMOLITION TORCH OPERATOR, SHOTCRETE NOZZLEMEN AND POTMAN | $35.00 | $8.70 | $43.70 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 - POWDERMAN, MASTER FORM SETTERS | $35.93 | $8.70 | $44.63 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 - BRICK PAVER (ASPHALT BLOCK PAVER, ASPHALT BLOCK SAWMAN, ASPHALT BLOCK GRINDER, HASTINGS BLOCK OR SIMILAR TYPE) | $36.81 | $8.70 | $45.51 | LABO0011-003 eff. 06/01/2025 |
| LABORERS, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 - LICENSED POWDERMEN | $37.95 | $8.70 | $46.65 | LABO0011-003 eff. 06/01/2025 |
| LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $32.25 | $8.70 | $40.95 | LABO0011-004 eff. 06/01/2025 |
| LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $32.25 | $8.70 | $40.95 | LABO0011-004 eff. 06/01/2025 |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 1 - BRAKEMAN, BULL GANG, DUMPER, TRACKMEN, CONCRETE MAN | $34.41 | $8.70 | $43.11 | LABO0011-005 eff. 06/01/2025 |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 2 - CHUCK TENDER, POWDERMEN IN PRIME HOUSE, FORM SETTERS AND MOVERS, NIPPERS, CABLEMAN, HOUSEMAN, GROUTMAN, BELL OR SIGNALMAN, TOP OR BOTTOM VIBRATORY OPERATOR | $35.48 | $8.70 | $44.18 | LABO0011-005 eff. 06/01/2025 |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 3 - MINERS, RE-BAR UNDERGROUND, CONCRETE OR GUNNITE NOZZLEMEN, POWDERMEN, TIMBERMEN AND RE-TIMBERMEN, WOOD STEEL INCLUDING LINER PLATE OR OTHER SUPPORT, MATERIAL MOTORMAN, CAULKERS, DIAMOND DRILL OPERATORS, RIGGERS, CEMENT FINISHERS-UNDERGROUND, WELDERS AND BURNERS, SHIELD DRIVER, AIR TRAC OPERATOR, SHOT CRETE NOZZLEMAN AND POTMAN | $38.17 | $8.70 | $46.87 | LABO0011-005 eff. 06/01/2025 |
| LABORERS: TUNNEL, RAISE, & SHAFT (FREE AIR) FOR HEAVY AND SEWER AND WATER LINES CONSTRUCTION, GROUP 4 - MUCKING MACHINE OPERATOR (AIR) | $39.29 | $8.70 | $47.99 | LABO0011-005 eff. 06/01/2025 |
| LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (1-14) AND HOURS (7) | $44.04 | $8.70 | $52.74 | LABO0011-006 eff. 06/01/2025 |
| LABORERS: TUNNEL, RAISE AND SHAFT (COMPRESSED AIR) FOR HEAVY CONSTRUCTION ONLY, POUNDS (14-18) AND HOURS (6) | $51.82 | $8.70 | $60.52 | LABO0011-006 eff. 06/01/2025 |
| LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING) | $24.30 | $8.74 | $33.04 | LABO0011-007 eff. 09/01/2025 |
| LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING) | $23.86 | $8.74 | $32.60 | LABO0011-007 eff. 09/01/2025 |
| LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING) | $23.89 | $8.74 | $32.63 | LABO0011-007 eff. 09/01/2025 |
| LABORERS: LABORER (PAVING AND INCIDENTAL GRADING) | $23.06 | $8.74 | $31.80 | LABO0011-007 eff. 09/01/2025 |
| LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING) | $25.10 | $8.74 | $33.84 | LABO0011-007 eff. 09/01/2025 |
| LABORERS: ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING) | $23.27 | $8.74 | $32.01 | LABO0011-007 eff. 09/01/2025 |
| LABORERS: BRICK MASONRY WORK (MASON TENDERS) | $24.31 | $8.70 | $33.01 | LABO0011-008 eff. 06/01/2025 |
| LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN) | $24.96 | $8.70 | $33.66 | LABO0011-008 eff. 06/01/2025 |
| MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES) | $45.65 | $21.21 | $66.86 | MARB0002-003 eff. 04/27/2025 |
| MOSAIC & TERRAZZO WORKER, TILE LAYER | $34.34 | $14.20 | $48.54 | MARB0003-001 eff. 04/27/2025 |
| MARBLE, TILE & TERRAZZO FINISHER | $28.85 | $12.55 | $41.40 | MARB0003-004 eff. 04/27/2025 |
| PAINTERS: COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS | $29.16 | $11.86 | $41.02 | PAIN0051-001 eff. 06/01/2025 |
| PAINTERS: ALL INDUSTRIAL WORK | $34.30 | $12.98 | $47.28 | PAIN0051-001 eff. 06/01/2025 |
| PAINTERS: BRIDGES, HEAVY HIGHWAY, LEAD ABATEMENT AND FLAME/THERMAL SPRAY | $42.93 | $13.77 | $56.70 | PAIN0051-001 eff. 06/01/2025 |
| METAL POLISHING AND REFINISHING | $28.46 | $11.56 | $40.02 | PAIN0051-001 eff. 06/01/2025 |
| CEMENT MASONS: (HEAVY CONSTRUCTION ONLY) | $30.50 | $14.23 | $44.73 | PLAS0891-001 eff. 03/01/2025 |
| CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 | PLAS0891-002 eff. 06/01/2025 |
| CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 | PLAS0891-002 eff. 06/01/2025 |
| CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 | PLAS0891-002 eff. 06/01/2025 |
PLUMBERS (PAIDScope and notesHOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY.) | $53.30 | $23.71 | $77.01 | PLUM0005-001 eff. 08/01/2025 |
STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY) | $55.00 | $24.46 | $79.46 | PLUM0602-005 eff. 08/01/2025 |
SHEET METAL WORKER (PAIDScope and notesHOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY) | $53.42 | $23.20 | $76.62 | SHEE0100-001 eff. 11/01/2025 |
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRACTOR TRAILER, LOW BOY (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'SScope and notesPAID VACATION AFTER ONE (1) YEAR OF SERVICE.) | $33.75 | $7.30 | $41.05 | TEAM0639-001 eff. 06/01/2025 |
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION - TRUCK DRIVERS (VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'SScope and notesPAID VACATION AFTER ONE (1) YEAR OF SERVICE.) | $31.75 | $7.30 | $39.05 | TEAM0639-001 eff. 06/01/2025 |
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'SScope and notesPAID VACATION AFTER ONE (1) YEAR OF SERVICE | $31.75 | $7.30 | $39.05 | TEAM0639-005 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 6 published 08/27/2026. We format and check the official text; the determination in your contract is what applies.