PrevailCrew

Florida prevailing wage rates: FL20260052

Residential construction in Alachua County.

FL20260052, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

FL20260052 wage rates
ClassificationBaseFringeTotalRate ID
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE
Scope and notes

JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE

$37.01$16.85$53.86ENGI0487-032
eff. 06/01/2023
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES$38.01$16.85$54.86ENGI0487-032
eff. 06/01/2023
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM
Scope and notes

JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE

$39.01$16.85$55.86ENGI0487-032
eff. 06/01/2023
SHEET METAL WORKER (EXCLUDES METAL ROOF INSTALLATION)$31.64$15.98$47.62SHEE0435-007
eff. 04/01/2025
TRUCK DRIVER: LOWBOY TRUCK$12.14
EO 13658 minimum $13.65 may apply
$0.00$12.14SUFL2009-091
eff. 06/08/2009
TRUCK DRIVER: DUMP TRUCK$10.62
EO 13658 minimum $13.65 may apply
$0.00$10.62SUFL2009-091
eff. 06/08/2009
ROOFER: METAL ROOF$16.99$0.00$16.99SUFL2009-091
eff. 06/08/2009
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS)$9.77
EO 13658 minimum $13.65 may apply
$0.00$9.77SUFL2009-091
eff. 06/08/2009
PLUMBER$11.61
EO 13658 minimum $13.65 may apply
$0.00$11.61SUFL2009-091
eff. 06/08/2009
PLASTERER$13.94$0.00$13.94SUFL2009-091
eff. 06/08/2009
PAINTER: BRUSH, ROLLER AND SPRAY$11.28
EO 13658 minimum $13.65 may apply
$0.00$11.28SUFL2009-091
eff. 06/08/2009
OPERATOR: TRACTOR$10.20
EO 13658 minimum $13.65 may apply
$0.00$10.20SUFL2009-091
eff. 06/08/2009
OPERATOR: TRACKHOE$15.68$0.00$15.68SUFL2009-091
eff. 06/08/2009
OPERATOR: SCREED$10.93
EO 13658 minimum $13.65 may apply
$0.00$10.93SUFL2009-091
eff. 06/08/2009
OPERATOR: ROLLER$10.59
EO 13658 minimum $13.65 may apply
$0.00$10.59SUFL2009-091
eff. 06/08/2009
OPERATOR: LOADER$12.28
EO 13658 minimum $13.65 may apply
$0.00$12.28SUFL2009-091
eff. 06/08/2009
OPERATOR: GRADER/BLADE$15.50$0.00$15.50SUFL2009-091
eff. 06/08/2009
OPERATOR: FORKLIFT$17.50$0.00$17.50SUFL2009-091
eff. 06/08/2009
OPERATOR: DISTRIBUTOR$11.41
EO 13658 minimum $13.65 may apply
$0.00$11.41SUFL2009-091
eff. 06/08/2009
OPERATOR: BULLDOZER$12.40
EO 13658 minimum $13.65 may apply
$0.00$12.40SUFL2009-091
eff. 06/08/2009
OPERATOR: BACKHOE/EXCAVATOR$12.72
EO 13658 minimum $13.65 may apply
$0.00$12.72SUFL2009-091
eff. 06/08/2009
OPERATOR: BACKHOE LOADER COMBO$17.04$0.00$17.04SUFL2009-091
eff. 06/08/2009
OPERATOR: ASPHALT PAVER$11.63
EO 13658 minimum $13.65 may apply
$0.00$11.63SUFL2009-091
eff. 06/08/2009
LABORER: LANDSCAPE AND IRRIGATION$8.90
EO 13658 minimum $13.65 may apply
$0.00$8.90SUFL2009-091
eff. 06/08/2009
LABORER: ROOF TEAROFF$9.00
EO 13658 minimum $13.65 may apply
$0.00$9.00SUFL2009-091
eff. 06/08/2009
LABORER: PIPELAYER$10.08
EO 13658 minimum $13.65 may apply
$0.00$10.08SUFL2009-091
eff. 06/08/2009
LABORER: MASON TENDER - CEMENT/CONCRETE$10.46
EO 13658 minimum $13.65 may apply
$0.00$10.46SUFL2009-091
eff. 06/08/2009
LABORER: MASON TENDER - BRICK$11.51
EO 13658 minimum $13.65 may apply
$0.00$11.51SUFL2009-091
eff. 06/08/2009
LABORER: COMMON OR GENERAL$9.06
EO 13658 minimum $13.65 may apply
$0.00$9.06SUFL2009-091
eff. 06/08/2009
IRONWORKER: STRUCTURAL, REINFORCING AND ORNAMENTAL$9.00
EO 13658 minimum $13.65 may apply
$0.00$9.00SUFL2009-091
eff. 06/08/2009
INSULATOR: BATT AND BLOWN$10.04
EO 13658 minimum $13.65 may apply
$0.00$10.04SUFL2009-091
eff. 06/08/2009
ELECTRICIAN$11.47
EO 13658 minimum $13.65 may apply
$0.00$11.47SUFL2009-091
eff. 06/08/2009
DRYWALL HANGER$15.00$0.00$15.00SUFL2009-091
eff. 06/08/2009
CEMENT MASON/CONCRETE FINISHER$12.83
EO 13658 minimum $13.65 may apply
$0.00$12.83SUFL2009-091
eff. 06/08/2009
CARPENTER, INCLUDES CABINET INSTALLATION (EXCLUDES DRYWALL HANGING)$12.15
EO 13658 minimum $13.65 may apply
$0.00$12.15SUFL2009-091
eff. 06/08/2009
BRICKLAYER$20.00$0.00$20.00SUFL2009-091
eff. 06/08/2009

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.