Florida prevailing wage rates: FL20260065
Residential construction in Hillsborough County.
FL20260065, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVEScope and notesJOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | $53.86 | ENGI0487-032 eff. 06/01/2023 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES | $38.01 | $16.85 | $54.86 | ENGI0487-032 eff. 06/01/2023 |
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOMScope and notesJOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | $55.86 | ENGI0487-032 eff. 06/01/2023 |
| IRONWORKER, REINFORCING | $35.25 | $17.32 | $52.57 | IRON0397-004 eff. 07/01/2024 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 EO 13658 minimum $13.65 may apply | $0.00 | $12.10 | SUFL2009-104 eff. 06/08/2009 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 EO 13658 minimum $13.65 may apply | $0.00 | $10.22 | SUFL2009-104 eff. 06/08/2009 |
| TILE SETTER | $16.00 | $0.00 | $16.00 | SUFL2009-104 eff. 06/08/2009 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (EXCLUDES METAL ROOF INSTALLATION) | $14.82 | $0.00 | $14.82 | SUFL2009-104 eff. 06/08/2009 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 | SUFL2009-104 eff. 06/08/2009 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS (EXCLUDES METAL ROOFS) | $15.97 | $0.00 | $15.97 | SUFL2009-104 eff. 06/08/2009 |
| PLUMBER | $12.37 EO 13658 minimum $13.65 may apply | $0.00 | $12.37 | SUFL2009-104 eff. 06/08/2009 |
| PLASTERER | $13.91 | $0.00 | $13.91 | SUFL2009-104 eff. 06/08/2009 |
| PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $13.59 EO 13658 minimum $13.65 may apply | $0.00 | $13.59 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: TRACTOR | $10.20 EO 13658 minimum $13.65 may apply | $0.00 | $10.20 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: TRACKHOE | $14.81 | $0.00 | $14.81 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: SCREED | $10.93 EO 13658 minimum $13.65 may apply | $0.00 | $10.93 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: ROLLER | $10.62 EO 13658 minimum $13.65 may apply | $0.00 | $10.62 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: LOADER | $11.50 EO 13658 minimum $13.65 may apply | $0.00 | $11.50 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: GRADER/BLADE | $14.00 | $0.00 | $14.00 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: FORKLIFT | $17.50 | $0.00 | $17.50 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: DISTRIBUTOR | $11.41 EO 13658 minimum $13.65 may apply | $0.00 | $11.41 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: BULLDOZER | $12.67 EO 13658 minimum $13.65 may apply | $0.00 | $12.67 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.25 | $0.00 | $15.25 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 | SUFL2009-104 eff. 06/08/2009 |
| OPERATOR: ASPHALT PAVER | $12.40 EO 13658 minimum $13.65 may apply | $0.00 | $12.40 | SUFL2009-104 eff. 06/08/2009 |
| LABORER: LANDSCAPE AND IRRIGATION | $10.41 EO 13658 minimum $13.65 may apply | $0.00 | $10.41 | SUFL2009-104 eff. 06/08/2009 |
| LABORER: ROOF TEAROFF | $9.00 EO 13658 minimum $13.65 may apply | $0.00 | $9.00 | SUFL2009-104 eff. 06/08/2009 |
| LABORER: PIPELAYER | $15.14 | $0.00 | $15.14 | SUFL2009-104 eff. 06/08/2009 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.29 EO 13658 minimum $13.65 may apply | $0.00 | $11.29 | SUFL2009-104 eff. 06/08/2009 |
| LABORER: MASON TENDER - BRICK | $11.51 EO 13658 minimum $13.65 may apply | $0.00 | $11.51 | SUFL2009-104 eff. 06/08/2009 |
| LABORER: COMMON OR GENERAL | $9.21 EO 13658 minimum $13.65 may apply | $0.00 | $9.21 | SUFL2009-104 eff. 06/08/2009 |
| IRONWORKER, STRUCTURAL | $14.53 | $0.00 | $14.53 | SUFL2009-104 eff. 06/08/2009 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 | $15.25 | SUFL2009-104 eff. 06/08/2009 |
| INSULATOR: BATT AND BLOWN | $12.41 EO 13658 minimum $13.65 may apply | $0.00 | $12.41 | SUFL2009-104 eff. 06/08/2009 |
| GLAZIER | $15.88 | $0.00 | $15.88 | SUFL2009-104 eff. 06/08/2009 |
| FENCE ERECTOR | $14.00 | $0.75 | $14.75 | SUFL2009-104 eff. 06/08/2009 |
| ELECTRICIAN | $12.54 EO 13658 minimum $13.65 may apply | $0.00 | $12.54 | SUFL2009-104 eff. 06/08/2009 |
| DRYWALL FINISHER/TAPER | $18.27 | $0.00 | $18.27 | SUFL2009-104 eff. 06/08/2009 |
| CEMENT MASON/CONCRETE FINISHER | $15.93 | $0.00 | $15.93 | SUFL2009-104 eff. 06/08/2009 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $15.00 | $0.00 | $15.00 | SUFL2009-104 eff. 06/08/2009 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | SUFL2009-104 eff. 06/08/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.