Florida prevailing wage rates: FL20260197
Building construction in Broward County.
FL20260197, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $39.76 | $19.02 | $58.78 | ASBE0060-001 eff. 03/01/2025 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $25.95 | $8.65 | $34.60 | CARP1809-001 eff. 06/01/2015 |
| CARPENTER: PILEDRIVERMAN | $25.20 | $10.36 | $35.56 | CARP1809-002 eff. 08/01/2016 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $40.25 | $15.20 | $55.45 | ELEC0728-008 eff. 03/01/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTE: A: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT; B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; PLUS THE FRIDAY AFTER THANKSGIVING; AND CHRISTMAS DAY | $55.85 | $38.44 | $94.29 | ELEV0071-002 eff. 01/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.00 | $14.90 | $41.90 | ENGI0487-019 eff. 07/01/2023 |
| OPERATOR: CONCRETE PUMP | $32.75 | $14.90 | $47.65 | ENGI0487-020 eff. 07/01/2023 |
| OPERATOR: CRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 | $52.47 | ENGI0487-023 eff. 07/01/2023 |
| OPERATOR: CRANE (CRANES 130-300 TON) | $39.38 | $14.90 | $54.28 | ENGI0487-023 eff. 07/01/2023 |
| OPERATOR: CRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 | $55.30 | ENGI0487-023 eff. 07/01/2023 |
| OPERATOR: CRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 | $51.97 | ENGI0487-023 eff. 07/01/2023 |
| OPERATOR: OILER | $27.53 | $14.90 | $42.43 | ENGI0487-029 eff. 07/01/2023 |
| OPERATOR: MECHANIC | $37.07 | $14.90 | $51.97 | ENGI0487-029 eff. 07/01/2023 |
| OPERATOR: FORKLIFT | $26.75 | $14.90 | $41.65 | ENGI0487-029 eff. 07/01/2023 |
| IRONWORKER, STRUCTURAL | $28.84 | $15.72 | $44.56 | IRON0272-001 eff. 10/01/2024 |
| IRONWORKER: ORNAMENTAL | $28.90 | $15.66 | $44.56 | IRON0402-001 eff. 10/01/2024 |
PLUMBERScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDING THE EMPLOYEE WORKS THE SCHEDULED WORK DAY PRECEDING AND AFTER THE HOLIDAY | $34.75 | $13.90 | $48.65 | PLUM0719-002 eff. 09/01/2025 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $43.38 | $16.70 | $60.08 | PLUM0725-001 eff. 07/16/2024 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $35.03 | $24.00 | $59.03 | SFFL0821-004 eff. 07/01/2025 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $29.10 | $14.68 | $43.78 | SHEE0032-001 eff. 08/12/2023 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.24 | $0.00 | $14.24 | SUFL2014-005 eff. 08/16/2016 |
| TRUCK DRIVER: DUMP TRUCK | $13.22 EO 13658 minimum $13.65 may apply | $2.12 | $15.34 | SUFL2014-005 eff. 08/16/2016 |
| TILE SETTER | $18.01 | $0.00 | $18.01 | SUFL2014-005 eff. 08/16/2016 |
| ROOFER | $19.98 | $4.77 | $24.75 | SUFL2014-005 eff. 08/16/2016 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.00 | $3.48 | $19.48 | SUFL2014-005 eff. 08/16/2016 |
| OPERATOR: ROLLER | $14.43 | $4.78 | $19.21 | SUFL2014-005 eff. 08/16/2016 |
| OPERATOR: LOADER | $16.00 | $2.82 | $18.82 | SUFL2014-005 eff. 08/16/2016 |
| OPERATOR: GRADER/BLADE | $18.97 | $0.00 | $18.97 | SUFL2014-005 eff. 08/16/2016 |
| OPERATOR: BULLDOZER | $15.40 | $1.90 | $17.30 | SUFL2014-005 eff. 08/16/2016 |
| LABORER: PIPELAYER | $13.56 EO 13658 minimum $13.65 may apply | $1.34 | $14.90 | SUFL2014-005 eff. 08/16/2016 |
| LABORER: COMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $12.79 EO 13658 minimum $13.65 may apply | $0.00 | $12.79 | SUFL2014-005 eff. 08/16/2016 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 | SUFL2014-005 eff. 08/16/2016 |
| CEMENT MASON/CONCRETE FINISHER | $13.06 EO 13658 minimum $13.65 may apply | $0.70 | $13.76 | SUFL2014-005 eff. 08/16/2016 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.