PrevailCrew

Hawaii prevailing wage rates: HI20260001

Building, Heavy, Highway, Residential construction in Hawaii, Honolulu, Kalawao, Kauai, Maui Counties.

HI20260001, modification 4, published 10/15/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 3

We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

HI20260001 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.)$46.90$29.75$76.65ASBE0132-001
eff. 09/07/2025
BOILERMAKER$49.37$31.25$80.62BOIL0627-005
eff. 01/01/2025
BRICKLAYERS AND STONEMASONS$48.03$32.23$80.26BRHI0001-001
eff. 09/05/2023
BRICKLAYER: POINTERS, CAULKERS AND WEATHERPROOFERS$48.28$32.23$80.51BRHI0001-001
eff. 09/05/2023
TILE, MARBLE & TERRAZZO WORKER (TILE, MARBLE AND TERRAZZO WORKERS)$46.50$33.00$79.50BRHI0001-002
eff. 09/05/2023
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO FLOOR GRINDERS AND TENDERS)$43.14$33.00$76.14BRHI0001-002
eff. 09/05/2023
TILE, MARBLE & TERRAZZO WORKER (TERRAZZO BASE GRINDERS)$44.69$33.00$77.69BRHI0001-002
eff. 09/05/2023
CARPENTERS: POWER SAW OPERATORS (2 H.P. AND OVER)$55.65$29.81$85.46CARP0745-001
eff. 09/01/2025
CARPENTERS: MILLWRIGHTS AND MACHINE ERECTORS$55.75$29.81$85.56CARP0745-001
eff. 09/01/2025
CARPENTERS: (CARPENTERS; HARDWOOD FLOOR LAYERS; PATENT SCAFFOLD ERECTORS (14 FT. AND OVER); PILEDRIVERS; PNEUMATIC NAILERS; WOOD SHINGLERS AND TRANSIT AND/OR LAYOUT MAN)$55.50$29.81$85.31CARP0745-001
eff. 09/01/2025
DRYWALL AND ACOUSTICAL WORKERS AND LATHERS$55.75$29.81$85.56CARP0745-002
eff. 09/01/2025
ELECTRICIANS: TELECOMMUNICATION WORKER$41.00$16.28$57.28ELEC1186-001
eff. 08/24/2025
ELECTRICIANS: CABLE SPLICERS$63.90$33.38$97.28ELEC1186-001
eff. 08/24/2025
ELECTRICIANS$56.55$33.16$89.71ELEC1186-001
eff. 08/24/2025
LINE CONSTRUCTION: TELECOMMUNICATION WORKER$41.00$16.28$57.28ELEC1186-002
eff. 08/24/2025
LINE CONSTRUCTION: LINEMEN$56.55$33.16$89.71ELEC1186-002
eff. 08/24/2025
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATORS$50.90$30.75$81.65ELEC1186-002
eff. 08/24/2025
LINE CONSTRUCTION: GROUNDMEN/TRUCK DRIVERS$42.41$27.14$69.55ELEC1186-002
eff. 08/24/2025
LINE CONSTRUCTION: CABLE SPLICERS$63.90$33.38$97.28ELEC1186-002
eff. 08/24/2025
ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY

$73.85$38.44$112.29ELEV0126-001
eff. 01/01/2025
STAND-BY DIVER: OTHER THAN AQUA LUNG$62.97$35.68$98.65ENGI0003-002
eff. 09/01/2025
STAND-BY DIVER: (AQUA LUNG) (SCUBA)$62.97$35.68$98.65ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 13E: END DUMPS, UNLICENSED (EUCLID, MACK, CATERPILLAR OR SIMILAR); TRACTOR TRAILER (HAULING EQUIPMENT); TANDEM TRUCKS HOOKED UP TO TRAILER (HAULING EQUIPMENT)$59.60$35.68$95.28ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 13D: TRUCK DRIVER (SLIP-IN OR PUP)$59.49$35.68$95.17ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 13C: TRUCK DRIVER (SEMI-TRAILER. ROCK CANS, SEMI-DUMP OR ROLL-OFFS)$59.17$35.68$94.85ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 13B: WATER TRUCK (OVER 2,000 GALLONS); TANDEM DUMP TRUCK, OVER 8 CU. YDS. (WATER LEVEL)$58.52$35.68$94.20ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 13A: DUMP TRUCK, 8 CU.YDS. AND UNDER (WATER LEVEL); WATER TRUCK (UP TO AND INCLUDING 2,000 GALLONS)$58.21$35.68$93.89ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 13: TRUCK DRIVER (UTILITY, FLATBED, ETC.)$57.94$35.68$93.62ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 12 OR EQUIVALENT OR OVER); STRADDLE LIFTS (OVER 50 TONS); TOWER CRANE, MOBILE; TRAVELING TRUSS CRANES; UNIVERSAL, LIEBHER, LINDEN, AND SIMILAR TYPES OF TOWER CRANES (IN THE ERECTION, DISMANTLING, AND MOVING OF EQUIPMENT THERE SHALL BE AN ADDITIONAL OPERATING ENGINEER OR HEAVY DUTY REPAIRMAN); YO-YO CAT OR DOZER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$61.02$35.68$96.70ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 12 CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS "STRUCK"M.R.C.); OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HOUR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.66$35.68$96.34ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.," STRUCK" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC BACKHOE (OVER 2 CU. YDS. UP TO AND INCLUDING 4 CU. YDS.); LEVERMAN; LIFT SLAB MACHINE; LOADER (OVER 12 CU. YDS); MASTER BOAT OPERATOR; MOBILE TRUCK CRANE OPERATOR (OVER 25 TONS BUT LESS THAN 50 TONS); (MOBILE TRUCK CRANE DRIVER REQUIRED); PRE-STRESS WIRE WRAPPING MACHINE; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER MOUNT) (OVER 25 TONS M.R.C); SELF-PROPELLED COMPACTOR (WITH MULTIPLE-PROPULSION POWER UNITS); SINGLE ENGINE RUBBER TIRED EARTHMOVING MACHINE (WITH TANDEM SCRAPER); TANDEM CATS; TRENCHER (PULLING ATTACHED SHIELD). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.30$35.68$95.98ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) (MOBILE TRUCK CRANE DRIVER REQUIRED); SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER MOUNT) (UP TO AND INCLUDING 25 TONS) (GROVE, DROTT, P&H, PETTIBONE AND SIMILAR; TRENCHER (OVER 6 FEET AND 750 H.P. OR MORE); WATCH ENGINEER (STEAM OR ELECTRIC). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.15$35.68$95.83ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); TRACTOR (TANDEM SCRAPER); WATCH ENGINEER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.00$35.68$95.68ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR (D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN D-6, AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.94$35.68$95.62ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.71$35.68$95.39ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YDS.); STATIONARY PIPE WRAPPING, CLEANING AND BENDING MACHINE; SURFACE HEATER AND PLANER OPERATOR, TRACTOR (D-6 AND SIMILAR); TRI-BATCH PAVER; TUNNEL BADGER; TUNNEL MOLE AND/OR BORING MACHINE OPERATOR UNDERBRIDGE PERSONNEL AERIAL PLATFORM (OVER 50 FEET OF PLATFORM). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.60$35.68$95.28ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); ROLLER OPERATOR (ASPHALT); SELF-PROPELLED ELEVATING GRADE PLANE; SLUSHER OPERATOR; TRACTOR (WITH BOOM) (D-6, OR SIMILAR); TRENCHER (OVER 6 FEET AND LESS THAN 200 H.P.); WATER TANKER (PULLED BY EUCLIDS, T-PULLS, DW-10, 20 OR 21, OR SIMILAR); WINCHMAN (STERN WINCH ON DREDGE). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.49$35.68$95.17ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 6: BOOM TRUCK OR DUAL PURPOSE "A"FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP (TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT (UNDER 40 FEET); LUBRICATION AND SERVICE ENGINEER (MOBILE); MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON AIRPORTS, HIGHWAYS, CANALS AND WAREHOUSES); MAN OR MATERIAL HOIST; MECHANICAL CONCRETE FINISHER (LARGE CLARY, JOHNSON BIDWELL, BRIDGE DECK AND SIMILAR); MOBILE TRUCK CRANE DRIVER; PORTABLE SHOTBLAST CONCRETE CLEANING MACHINE; PORTABLE BORING MACHINE (UNDER STREETS, HIGHWAYS, ETC.); PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP FORMS, ETC., IN TUNNELS); ROLLERS (OVER 5 TONS); SELF-PROPELLED COMPACTOR (SINGLE ENGINE); SELF-PROPELLED PAVEMENT BREAKER; SKIDSTEER LOADER WITH ATTACHMENTS; SLIP FORM PUMPS (POWER DRIVEN BY HYDRAULIC, ELECTRIC, AIR, GAS, ETC., LIFTING DEVICE FOR CONCRETE FORMS); SMALL RUBBER TIRED TRACTORS; TRENCHER (UP TO AND INCLUDING 6 FEET); UNDERBRIDGE PERSONNEL AERIAL PLATFORM (50 FEET OF PLATFORM OR LESS). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.17$35.68$94.85ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES ("BANK" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER (GREASE RACK); SCREEDMAN BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$58.52$35.68$94.20ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 4: BOOM TRUCK OR DUAL PURPOSE "A" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, HYSTER AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$58.21$35.68$93.89ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); TUGGER HOIST. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$57.94$35.68$93.62ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$57.77$35.68$93.45ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATORS:, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$57.66$35.68$93.34ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 12 OR EQUIVALENT OR OVER); STRADDLE LIFTS (OVER 50 TONS); TOWER CRANE, MOBILE; TRAVELING TRUSS CRANES; UNIVERSAL, LIEBHER, LINDEN, AND SIMILAR TYPES OF TOWER CRANES (IN THE ERECTION, DISMANTLING, AND MOVING OF EQUIPMENT THERE SHALL BE AN ADDITIONAL OPERATING ENGINEER OR HEAVY DUTY REPAIRMAN); YO-YO CAT OR DOZER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$61.32$35.68$97.00ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12: CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS "STRUCK"M.R.C.); OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HOUR)$60.96$35.68$96.64ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.," STRUCK" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC BACKHOE (OVER 2 CU. YDS. UP TO AND INCLUDING 4 CU. YDS.); LEVERMAN; LIFT SLAB MACHINE; LOADER (OVER 12 CU. YDS); MASTER BOAT OPERATOR; MOBILE TRUCK CRANE OPERATOR (OVER 25 TONS BUT LESS THAN 50 TONS); (MOBILE TRUCK CRANE DRIVER REQUIRED); PRE-STRESS WIRE WRAPPING MACHINE; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE (CENTER MOUNT) (OVER 25 TONS M.R.C); SELF-PROPELLED COMPACTOR (WITH MULTIPLE-PROPULSION POWER UNITS); SINGLE ENGINE RUBBER TIRED EARTHMOVING MACHINE (WITH TANDEM SCRAPER); TANDEM CATS; TRENCHER (PULLING ATTACHED SHIELD). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.60$35.68$96.28ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) (MOBILE TRUCK CRANE DRIVER REQUIRED); SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER MOUNT) (UP TO AND INCLUDING 25 TONS) (GROVE, DROTT, P&H, PETTIBONE AND SIMILAR; TRENCHER (OVER 6 FEET AND 750 H.P. OR MORE); WATCH ENGINEER (STEAM OR ELECTRIC). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.45$35.68$96.13ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); TRACTOR (TANDEM SCRAPER); WATCH ENGINEER. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.30$35.68$95.98ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR (D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN D-6, AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.24$35.68$95.92ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$60.01$35.68$95.69ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YDS.); STATIONARY PIPE WRAPPING, CLEANING AND BENDING MACHINE; SURFACE HEATER AND PLANER OPERATOR, TRACTOR (D-6 AND SIMILAR); TRI-BATCH PAVER; TUNNEL BADGER; TUNNEL MOLE AND/OR BORING MACHINE OPERATOR UNDERBRIDGE PERSONNEL AERIAL PLATFORM (OVER 50 FEET OF PLATFORM). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.90$35.68$95.58ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); ROLLER OPERATOR (ASPHALT); SELF-PROPELLED ELEVATING GRADE PLANE; SLUSHER OPERATOR; TRACTOR (WITH BOOM) (D-6, OR SIMILAR); TRENCHER (OVER 6 FEET AND LESS THAN 200 H.P.); WATER TANKER (PULLED BY EUCLIDS, T-PULLS, DW-10, 20 OR 21, OR SIMILAR); WINCHMAN (STERN WINCH ON DREDGE). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.79$35.68$95.47ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 6: BOOM TRUCK OR DUAL PURPOSE "A"FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP (TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT (UNDER 40 FEET); LUBRICATION AND SERVICE ENGINEER (MOBILE); MAGINNIS INTERNAL FULL SLAB VIBRATOR (ON AIRPORTS, HIGHWAYS, CANALS AND WAREHOUSES); MAN OR MATERIAL HOIST; MECHANICAL CONCRETE FINISHER (LARGE CLARY, JOHNSON BIDWELL, BRIDGE DECK AND SIMILAR); MOBILE TRUCK CRANE DRIVER; PORTABLE SHOTBLAST CONCRETE CLEANING MACHINE; PORTABLE BORING MACHINE (UNDER STREETS, HIGHWAYS, ETC.); PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP FORMS, ETC., IN TUNNELS); ROLLERS (OVER 5 TONS); SELF-PROPELLED COMPACTOR (SINGLE ENGINE); SELF-PROPELLED PAVEMENT BREAKER; SKIDSTEER LOADER WITH ATTACHMENTS; SLIP FORM PUMPS (POWER DRIVEN BY HYDRAULIC, ELECTRIC, AIR, GAS, ETC., LIFTING DEVICE FOR CONCRETE FORMS); SMALL RUBBER TIRED TRACTORS; TRENCHER (UP TO AND INCLUDING 6 FEET); UNDERBRIDGE PERSONNEL AERIAL PLATFORM (50 FEET OF PLATFORM OR LESS). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$59.47$35.68$95.15ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES ("BANK" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER (GREASE RACK); SCREEDMAN. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$58.82$35.68$94.50ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 4: BOOM TRUCK OR DUAL PURPOSE "A" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, HYSTER AND SIMILAR BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$58.51$35.68$94.19ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); TUGGER HOIST. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$58.24$35.68$93.92ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$58.07$35.68$93.75ENGI0003-002
eff. 09/01/2025
POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT INCLUDING 130 FEET 0.50 BOOMS AND/OR LEADS OF 130 FEET UP TO BUT NOT INCLUDING 180 FEET 0.75 BOOMS AND/OR LEADS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.15 BOOMS AND/OR LEADS OVER 250 FEET 1.50 THE OPERATOR OF A CRANE (50 TONS AND OVER) WITH A BOOM OF 180 FEET OR MORE (INCLUDING JIB) SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (50 TONS AND OVER) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 180 FEET UP TO AND INCLUDING 250 FEET 1.25 BOOMS OVER 250 FEET 1.75$57.96$35.68$93.64ENGI0003-002
eff. 09/01/2025
HELICOPTER WORK: PILOT OF HELICOPTER$62.83$35.68$98.51ENGI0003-002
eff. 09/01/2025
HELICOPTER WORK: CO-PILOT OF HELICOPTER$61.66$35.68$97.34ENGI0003-002
eff. 09/01/2025
HELICOPTER WORK, AIRBORNE HOIST OPERATOR FOR HELICOPTER$61.52$35.68$97.20ENGI0003-002
eff. 09/01/2025
DIVER: OTHER THAN AQUA LUNG$81.72$35.68$117.40ENGI0003-002
eff. 09/01/2025
DIVER: (AQUA LUNG) (SCUBA) (up to 30 feet)$72.35$35.68$108.03ENGI0003-002
eff. 09/01/2025
DIVER: (AQUA LUNG) (SCUBA) (over 30 feet)$81.72$35.68$117.40ENGI0003-002
eff. 09/01/2025
DIVER TENDER: OTHER THAN AQUA LUNG$59.94$35.68$95.62ENGI0003-002
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 7: DECKHAND (CAN OPERATE ANCHOR SCOW UNDER DIRECTION OF DECKMATE); FIREMAN; LEVEEMAN; OILER$57.94$35.68$93.62ENGI0003-004
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 6: WINCHMAN (STERN WINCH ON DREDGE)$59.49$35.68$95.17ENGI0003-004
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 5: DECKMATE$59.60$35.68$95.28ENGI0003-004
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 4: DOZER OPERATOR$59.94$35.68$95.62ENGI0003-004
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 3: MECHANIC OR WELDER$60.00$35.68$95.68ENGI0003-004
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 2: WATCH ENGINEER (STEAM OR ELECTRIC)$60.15$35.68$95.83ENGI0003-004
eff. 09/01/2025
DREDGING:, HYDRAULIC SUCTION DREDGES: GROUP 1: LEVERMAN$60.30$35.68$95.98ENGI0003-004
eff. 09/01/2025
DREDGING:, DERRICKS: GROUP 4: DECKHAND, FIREMAN, OILER$57.94$35.68$93.62ENGI0003-004
eff. 09/01/2025
DREDGING:, DERRICKS: GROUP 3: DECKMATE; SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YARDS)$59.60$35.68$95.28ENGI0003-004
eff. 09/01/2025
DREDGING:, DERRICKS: GROUP 2: SAURMAN TYPE DRAGLINE (OVER 5 CUBIC YARDS)$60.00$35.68$95.68ENGI0003-004
eff. 09/01/2025
DREDGING:, DERRICKS: GROUP 1: OPERATORS (DERRICKS, PILEDRIVERS AND CRANES)$60.66$35.68$96.34ENGI0003-004
eff. 09/01/2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 4: BARGEMAN; DECKHAND; FIREMAN; OILER. HYDRAULIC SUCTION DREDGING CLASSIFICATIONS$57.94$35.68$93.62ENGI0003-004
eff. 09/01/2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 3: BARGE MATE; DECKMATE$59.60$35.68$95.28ENGI0003-004
eff. 09/01/2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 2: MECHANIC OR WELDER; WATCH ENGINEER$60.00$35.68$95.68ENGI0003-004
eff. 09/01/2025
DREDGING:, CLAMSHELL OR DIPPER DREDGING: GROUP 1: CLAMSHELL OR DIPPER OPERATOR$60.66$35.68$96.34ENGI0003-004
eff. 09/01/2025
DREDGING (BOAT OPERATORS): MASTER BOAT OPERATOR$60.30$35.68$95.98ENGI0003-004
eff. 09/01/2025
DREDGING (BOAT OPERATORS): BOAT OPERATOR$60.15$35.68$95.83ENGI0003-004
eff. 09/01/2025
DREDGING (BOAT OPERATORS): BOAT DECKHAND$57.94$35.68$93.62ENGI0003-004
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): SOIL STABILIZER$59.47$34.86$94.33ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): SCREED PERSON$58.64$34.86$93.50ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR (OVER FIVE TONS)$58.84$34.86$93.70ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): ROLLER OPERATOR (FIVE TONS AND UNDER)$57.41$34.86$92.27ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): LOADER (OVER 2 1/2 CU. YDS. TO AND INCLUDING 5 CU. YDS.)$58.96$34.86$93.82ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): LOADER (2 1/2 CU. YDS. AND UNDER)$58.64$34.86$93.50ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): LABORER, HAND ROLLER$57.18$34.86$92.04ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): GRADER$59.47$34.86$94.33ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): CONCRETE SAWS AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS)$58.64$34.86$93.50ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION LOADER/BACKHOE (UP TO 3/4 CU.YD.)$56.70$34.86$91.56ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): COMBINATION LOADER/BACKHOE (OVER 3/4 CU.YD.)$57.68$34.86$92.54ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): COLD PLANER$59.47$34.86$94.33ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT SPREADER OPERATOR$59.16$34.86$94.02ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT RAKER$57.68$34.86$92.54ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT PLANT OPERATOR$59.07$34.86$93.93ENGI0003-044
eff. 09/01/2025
POWER EQUIPMENT OPERATORS (PAVING): ASPHALT CONCRETE MATERIAL TRANSFER$58.67$34.86$93.53ENGI0003-044
eff. 09/01/2025
IRONWORKERS A. EMPLOYEES WILL BE PAID $.50 PER HOUR MORE WHILE WORKING IN TUNNELS AND COFFER DAMS; $1.00 PER HOUR MORE WHEN REQUIRED TO WORK UNDER OR ARE COVERED WITH WATER (SUBMERGED) AND WHEN THEY ARE REQUIRED TO WORK ON THE SUMMIT OF MAUNA KEA, MAUNA LOA OR HALEAKALA$50.50$43.46$93.96IRON0625-001
eff. 09/01/2025
SEE LABORERS: LABORER II IN FOOTER$39.15$25.96$65.11LABO0368-001
eff. 09/02/2024
SEE LABORERS: LABORER I IN FOOTER$41.75$25.96$67.71LABO0368-001
eff. 09/02/2024
LABORERS: WINDOW WASHER (BOSUN CHAIR)$41.25$25.96$67.21LABO0368-001
eff. 09/02/2024
LABORERS: POWDERMAN$42.75$25.96$68.71LABO0368-001
eff. 09/02/2024
LABORERS: MASON TENDER/HOD CARRIER$42.25$25.96$68.21LABO0368-001
eff. 09/02/2024
LABORERS: GUNITE/SHOTCRETE OPERATOR AND HIGH SCALER$42.25$25.96$68.21LABO0368-001
eff. 09/02/2024
LABORERS: FINAL CLEAN UP$31.40$21.37$52.77LABO0368-001
eff. 09/02/2024
LABORERS: DRILLER$44.75$25.96$70.71LABO0368-001
eff. 09/02/2024
LANDSCAPE & IRRIGATION LABORERS: GROUP 2 LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER SYSTEMS IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL CONTROLLERS, AND METALLIC (COPPERS, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE. THIS WORK ALSO INCLUDES THE READING AND INTERPRETATION OF PLANS AND SPECIFICATIONS IN CONNECTION WITH THE LAYOUT OF LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION WORK; OPERATION OF HYDRO-MULCHING MACHINES (SPRAYMAN AND DRIVER), DRILLERS, TRENCHERS (RIDING TYPE, DAVIS T-66, AND SIMILAR) AND FORK LIFTS USED IN CONNECTION WITH THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; TREE CLIMBERS AND CHAIN SAW TREE TRIMMERS, SPORADIC OPERATION (WHEN USED IN CONNECTION WITH LANDSCAPING, ROCKSCAPE, WATERSCAPE, AND IRRIGATION WORK) OF SKID-STEER LOADERS (BOBCAT AND SIMILAR), CRANES (BANTAM, GROVE, AND SIMILAR), HOPTOS, BACKHOES, LOADERS, ROLLERS, AND DOZERS (CASE, JOHN DEERE, AND SIMILAR), WATER TRUCKS, TRUCKS REQUIRING A STATE OF HAWAII PUBLIC UTILITIES COMMISSION TYPE 5 AND/OR TYPE 7 LICENSE, SIT-DOWN TYPE AND "GANG" MOWERS, AND OTHER SELF-PROPELLED, SIT-DOWN OPERATED MACHINES NOT LISTED UNDER LANDSCAPE & IRRIGATION MAINTENANCE LABORER; CHEMICAL SPRAYING USING SELF-PROPELLED POWER SPRAYING EQUIPMENT (200 GALLON CAPACITY OR MORE)$29.40$17.15$46.55LABO0368-002
eff. 09/03/2024
LANDSCAPE & IRRIGATION LABORERS, GROUP 3: MAINTENANCE OF TREES, SHRUBS, GROUND COVERS, LAWNS AND OTHER PLANTED AREAS, INCLUDING THE REPLANTING OF TREES, SHRUBS, GROUND COVERS, AND OTHER PLANTINGS THAT DID NOT "TAKE" OR WHICH ARE DAMAGED; PROVIDED, HOWEVER, THAT RE-PLANTING THAT REQUIRES THE USE OF EQUIPMENT, MACHINERY, OR POWER TOOLS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE AND IRRIGATION LABORER, GROUP 1; RAKING, MOWING, TRIMMING, AND RUNING, INCLUDING THE USE OF "WEED EATERS", HEDGE TRIMMERS, VACUUMS, BLOWERS, AND OTHER HAND-HELD GAS, AIR, ELECTRIC, OR SELF-POWERED TOOLS, AND THE OPERATION OF LAWN MOWERS
Scope and notes

(NOTE: THE OPERATION OF SIT-DOWN TYPE AND "GANG" MOWERS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE & IRRIGATION LABORER, GROUP 2); GUYWIRING, STAKING, PROPPING, AND SUPPORTING TREES; FERTILIZING, CHEMICAL SPRAYING USING SPRAY EQUIPMENT WITH LESS THAN 200 GALLON CAPACITY, MAINTAINING IRRIGATION AND SPRINKLER SYSTEMS, INCLUDING THE STAKING, CLAMPING, AND ADJUSTMENT OF RISERS, AND THE ADJUSTMENT AND/OR REPLACEMENT OF SPRINKLER HEADS, (NOTE: THE CLEANING AND GLUING OF PIPE AND FITTINGS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE & IRRIGATION LABORER(GROUP 1); WATERING BY HAND OR SPRINKLER SYSTEM AND THE PEFORMANCE OF OTHER TYPES OF GARDENING, YARDMAN, AND HORTICULTURAL-RELATED WORK

$23.00$17.15$40.15LABO0368-002
eff. 09/03/2024
LANDSCAPE & IRRIGATION LABORERS, GROUP 1: INSTALLATION OF NON-POTABLE PERMANENT OR TEMPORARY IRRIGATION WATER SYSTEMS PERFORMED FOR THE PURPOSES OF LANDSCAPING AND IRRIGATION ARCHITECTURAL HORTICULTURAL WORK; THE INSTALLATION OF DRINKING FOUNTAINS AND PERMANENT OR TEMPORARY IRRIGATION SYSTEMS USING POTABLE WATER FOR LANDSCAPING AND IRRIGATION ARCHITECTURAL HORTICULTURAL PURPOSES ONLY. THIS WORK INCLUDES (A) THE INSTALLATION OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS (PRESSURE AND NON-PRESSURE), LOW VOLTAGE ELECTRICAL LINES AND, PROVIDED SUCH WORK INVOLVES ELECTRICAL WIRING THAT WILL CARRY 24 VOLTS OR LESS, THE INSTALLATION OF SENSORS, MASTER CONTROL PANELS, DISPLAY BOARDS, JUNCTION BOXES, CONDUCTORS, INCLUDING ALL OTHER COMPONENTS FOR CONTROLLERS, (B) AND METALLIC (COPPER, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE INCLUDING ALL WORK INCIDENTAL THERETO, I.E., UNLOADING, HANDLING AND DISTRIBUTION OF ALL PIPES FITTINGS, TOOLS, MATERIALS AND EQUIPMENT, (C) ALL SOLDERING WORK IN CONNECTION WITH THE ABOVE WHETHER DONE BY TORCH, SOLDERING IRON, OR OTHER MEANS; (D) TIE-IN TO MAIN LINES, THRUST BLOCKS (BOTH PRECAST AND POURED IN PLACE), PIPE HANGERS AND SUPPORTS INCIDENTAL TO INSTALLATION OF THE ENTIRE IRRIGATION SYSTEM, (E) MAKING OF PRESSURE TESTS, START-UP TESTING, FLUSHING, PURGING, WATER BALANCING, PLACING INTO OPERATION ALL IRRIGATION EQUIPMENT, FIXTURES AND APPURTENANCES INSTALLED UNDER THIS AGREEMENT, AND (F) THE FABRICATION, REPLACEMENT, REPAIR AND SERVICING OFLANDSCAPING AND IRRIGATION SYSTEMS. OPERATION OF HAND-HELD GAS, AIR, ELECTRIC, OR SELF-POWERED TOOLS AND EQUIPMENT USED IN THE PERFORMANCE OF LANDSCAPE AND IRRIGATION WORK IN CONNECTION WITH ARCHITECTURAL HORTICULTURE; CHOKE-SETTING, SIGNALING, AND RIGGING FOR EQUIPMENT OPERATORS ON JOB-SITE IN THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; CONCRETE WORK (WET OR DRY) PERFORMED IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS WORK SHALL ALSO INCLUDE THE SETTING OF ROCK, STONE, OR RIPRAP IN CONNECTION WITH SUCH LANDSCAPE, WATERSCAPE, ROCKSCAPE, AND IRRIGATION WORK; GRUBBING, PICK AND SHOVEL EXCAVATION, AND HAND ROLLING OR TAMPING IN CONNECTION WITH THE PERFORMANCE OF SUCH LANDSCAPING AND IRRIGATION WORK; SPRIGGING, HANDSEEDING, AND PLANTING OF TREES, SHRUBS, GROUND COVERS, AND OTHER PLANTINGS AND THE PERFORMANCE OF ALL TYPES OF GARDENING AND HORTICULTURAL WORK RELATING TO SAID PLANTING; OPERATION OF FLAT BED TRUCKS (UP TO AND INCLUDING 2 1/2 TONS).$28.40$17.15$45.55LABO0368-002
eff. 09/03/2024
UNDERGROUND LABORER, GROUP 7: SHIFTER (SHAFT WORK & RAISER)$46.40$25.91$72.31LABO0368-003
eff. 09/02/2024
UNDERGROUND LABORER, GROUP 6: SHIFTER$45.95$25.91$71.86LABO0368-003
eff. 09/02/2024
UNDERGROUND LABORER, GROUP 5: SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL); DIAMOND DRILLER; GUNITE OR SHOTCRETE NOZZLEMAN; RODMAN; GROUNDMAN$45.70$25.91$71.61LABO0368-003
eff. 09/02/2024
UNDERGROUND LABORER, GROUP 4: MINERS - TUNNEL (INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK); TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREOF); BLASTERS, DRILLERS, POWDERMAN (IN HEADING); MICROTUNNEL LABORER; HEADMAN; CHERRY PICKERMAN (WHERE CAR IS LIFTED); NIPPER; GROUT GUNMEN; GROUT PUMPMAN & POTMAN; GUNITE, SHOTCRETE GUNMEN & POTMEN; CONCRETE FINISHER (IN TUNNEL); CONCRETE SCREED MAN; BIT GRINDER; STEEL FORM RAISERS & SETTERS; HIGH PRESSURE NOZZLEMAN; NOZZLEMAN (ON SLICK LINE); SANDBLASTER-POTMAN (COMBINATION WORK ASSIGNMENT INTERCHANGEABLE); TUGGER$45.35$25.91$71.26LABO0368-003
eff. 09/02/2024
UNDERGROUND LABORER, GROUP 3: CHUCKTENDERS AND CABLETENDERS; POWDERMAN (PRIME HOUSE); VIBRATORMAN, PAVEMENT BREAKERS$44.35$25.91$70.26LABO0368-003
eff. 09/02/2024
UNDERGROUND LABORER, GROUP 2: SWAMPER; BRAKEMAN; BULL GANG-MUCKERS, TRACKMEN; DUMPMEN (ANY METHOD); CONCRETE CREW (INCLUDES RODDING AND SPREADING); GROUT CREW; REBOUNDMEN$43.85$25.91$69.76LABO0368-003
eff. 09/02/2024
UNDERGROUND LABORER, GROUP 1: WATCHMEN; CHANGE HOUSE ATTENDANT$42.35$25.91$68.26LABO0368-003
eff. 09/02/2024
PAINTERS: SANDBLASTER; SPRAY$44.05$30.05$74.10PAIN1791-001
eff. 07/01/2025
PAINTERS: BRUSH$44.05$30.05$74.10PAIN1791-001
eff. 07/01/2025
GLAZIERS$48.50$40.20$88.70PAIN1889-001
eff. 07/01/2025
SOFT FLOOR LAYERS$43.27$35.18$78.45PAIN1926-001
eff. 03/02/2025
TAPER$47.36$32.00$79.36PAIN1944-001
eff. 01/01/2025
PLASTERER$46.12$34.53$80.65PLAS0630-001
eff. 09/04/2023
CEMENT MASONS: TROWEL MACHINE OPERATORS$44.27$33.63$77.90PLAS0630-002
eff. 09/04/2023
CEMENT MASONS$44.12$33.63$77.75PLAS0630-002
eff. 09/04/2023
PLUMBER, PIPEFITTER, STEAMFITTER & SPRINKLER FITTER$53.83$33.19$87.02PLUM0675-001
eff. 07/06/2025
ROOFERS (INCLUDING BUILT UP, COMPOSITION AND SINGLE PLY)$45.55$23.36$68.91ROOF0221-001
eff. 09/06/2026
SHEET METAL WORKER$50.16$33.32$83.48SHEE0293-001
eff. 03/02/2025
FENCE ERECTOR (CHAIN LINK FENCE)$9.33
EO 13658 minimum $13.65 may apply
$1.65$10.98SUHI1997-002
eff. 09/15/1997
DRAPERY INSTALLER$13.60
EO 13658 minimum $13.65 may apply
$1.20$14.80SUHI1997-002
eff. 09/15/1997

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 4 published 10/15/2026. We format and check the official text; the determination in your contract is what applies.