PrevailCrew

Idaho prevailing wage rates: ID20260013

Building construction in Caribou County.

ID20260013, modification 2, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

No existing rate changed amount.

2 classifications added, 2 removed or reworded
  • removed LABORER (Common or General): Group 1 was $32.62 + $16.50 fringe
  • added LABORER: GROUP 1 COMMON OR GENERAL $32.62 + $16.50 fringe
  • added LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE $33.93 + $16.50 fringe
  • removed LABORER: Mason Tender - Cement/Concrete: Group 4 was $33.93 + $16.50 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

ID20260013 wage rates
ClassificationBaseFringeTotalRate ID
BRICKLAYER$30.00$17.78$47.78BRID0003-002
eff. 06/01/2019
CARPENTER
Scope and notes

ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$35.68$18.24$53.92CARP0808-001
eff. 06/01/2025
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING)$40.00$18.74$58.74ELEC0449-007
eff. 12/01/2025
POWER EQUIPMENT OPERATOR: GROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION)
Scope and notes

ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. CRANE LONG BOOM PAY: A. Crane Booms, 100ft to 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale C. Crane Booms, over 200 ft., forty-five cents over scale

$37.35$16.10$53.45ENGI0302-033
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON)
Scope and notes

ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE

$36.98$16.10$53.08ENGI0302-033
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION)
Scope and notes

ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY

$36.81$16.10$52.91ENGI0302-033
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION)
Scope and notes

ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY

$36.33$16.10$52.43ENGI0302-033
eff. 01/01/2025
IRONWORKER, STRUCTURAL$33.37$22.98$56.35IRON0732-002
eff. 06/01/2024
LABORER: GROUP 1 COMMON OR GENERAL$32.62$16.50$49.12LABO0155-005
eff. 01/01/2025
LABORER: GROUP 4 MASON TENDER - CEMENT/CONCRETE$33.93$16.50$50.43LABO0155-005
eff. 01/01/2025
PLUMBER$36.75$18.93$55.68PLUM0648-004
eff. 06/01/2023
ROOFER$29.02$19.90$48.92ROOF0200-002
eff. 06/01/2025
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION$35.50$22.25$57.75SHEE0103-003
eff. 06/01/2023
SPRINKLER FITTER (FIRE SPRINKLERS)$26.80$12.00$38.80SUID2010-006
eff. 08/08/2012
PAINTER: BRUSH, ROLLER AND SPRAY$16.12$0.00$16.12SUID2010-006
eff. 08/08/2012
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$20.13$1.80$21.93SUID2010-006
eff. 08/08/2012
CEMENT MASON/CONCRETE FINISHER$14.76$2.80$17.56SUID2010-006
eff. 08/08/2012
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS)$37.19$17.00$54.19TEAM0983-001
eff. 01/01/2025
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS)$36.75$17.00$53.75TEAM0983-001
eff. 01/01/2025
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS)$36.12$17.00$53.12TEAM0983-001
eff. 01/01/2025
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS)$36.01$17.00$53.01TEAM0983-001
eff. 01/01/2025
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS)$35.78$17.00$52.78TEAM0983-001
eff. 01/01/2025
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS)$35.60$17.00$52.60TEAM0983-001
eff. 01/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.