Idaho prevailing wage rates: ID20260034
Building construction in Power County.
ID20260034, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
1 classifications added, 1 removed or reworded
- added LABORER: GROUP 4 MASON TENDER (CEMENT/CONCRETE & BRICK ) $33.93 + $16.50 fringe
- removed LABORER: Mason Tender (Cement/Concrete & Brick): Group 4 was $33.93 + $16.50 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $26.79 | $17.34 | $44.13 | BRID0003-003 eff. 06/01/2019 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $40.00 | $18.74 | $58.74 | ELEC0449-007 eff. 12/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANEScope and notesZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | $53.45 | ENGI0302-038 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON)Scope and notesZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | $53.08 | ENGI0302-038 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFTScope and notesZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | $52.43 | ENGI0302-038 eff. 01/01/2025 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 | IRON0732-002 eff. 06/01/2024 |
| LABORER: GROUP 4 MASON TENDER (CEMENT/CONCRETE & BRICK ) | $33.93 | $16.50 | $50.43 | LABO0155-006 eff. 01/01/2025 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $12.09 EO 13658 minimum $13.65 may apply | $5.33 | $17.42 | PAIN0764-001 eff. 01/01/2012 |
| PLUMBER | $36.75 | $18.93 | $55.68 | PLUM0648-004 eff. 06/01/2023 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $35.50 | $22.25 | $57.75 | SHEE0103-003 eff. 06/01/2023 |
| TRUCK DRIVER: DUMP TRUCK | $16.06 | $0.00 | $16.06 | SUID2010-027 eff. 08/08/2012 |
| ROOFER | $19.00 | $0.00 | $19.00 | SUID2010-027 eff. 08/08/2012 |
| OPERATOR: LOADER (FRONT END) | $21.27 | $5.54 | $26.81 | SUID2010-027 eff. 08/08/2012 |
| OPERATOR: BULLDOZER | $24.52 | $7.87 | $32.39 | SUID2010-027 eff. 08/08/2012 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.28 | $0.00 | $16.28 | SUID2010-027 eff. 08/08/2012 |
| OPERATOR: BACKHOE/EXCAVATOR | $22.23 | $0.00 | $22.23 | SUID2010-027 eff. 08/08/2012 |
| LABORER: COMMON OR GENERAL | $17.87 | $0.00 | $17.87 | SUID2010-027 eff. 08/08/2012 |
| IRONWORKER, REINFORCING | $24.74 | $14.82 | $39.56 | SUID2010-027 eff. 08/08/2012 |
| CEMENT MASON/CONCRETE FINISHER | $13.52 EO 13658 minimum $13.65 may apply | $2.80 | $16.32 | SUID2010-027 eff. 08/08/2012 |
| CARPENTER | $18.00 | $0.00 | $18.00 | SUID2010-027 eff. 08/08/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.