Idaho prevailing wage rates: ID20260036
Heavy construction in Adams County.
ID20260036, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
9 classifications added, 9 removed or reworded
- removed LABORER: Asphalt Including Raker, Shoveler, Spreader, and Distributor: Group 3 was $33.83 + $16.50 fringe
- removed LABORER: Flagger: Group 1 was $33.63 + $16.50 fringe
- added LABORER: GROUP 1 FLAGGER $33.63 + $16.50 fringe
- added LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $33.83 + $16.50 fringe
- removed POWER EQUIPMENT OPERATOR: Blade Operator, Cranes (up to and including 50 tons), Drilling (bit under 8in), Front End Loader (over 4 yds to and including 7yds), Oiler, Scraper (up to and including 40 yds): GROUP 6 was $36.98 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer, Scraper (over 80 yds to 100 yds): GROUP 8 was $37.58 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Cranes (over 50 tons), Drill (bit 8 in and over), Grader (Fine), Front End Loader (over 7 yds), Heavy Duty Mechanic, Scrapers (over 40 yds to 60 yds), Tower Crane: GROUP 7 was $37.35 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Elevating Grader Operator: GROUP 5 was $36.81 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Front End Loader (up to 4yd): GROUP 4 was $36.64 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) $38.06 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER $36.33 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) $36.64 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR $36.81 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) $36.98 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE $37.35 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) $37.58 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Roller: GROUP 3 was $36.33 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Scraper (over 100 yds): GROUP 10 was $38.06 + $16.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN | $42.25 | $18.84 | $61.09 | ELEC0291-011 eff. 12/01/2024 |
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ENGI0302-040 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 70 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANEScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ENGI0302-040 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ENGI0302-040 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATORScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.81 | $16.10 | $52.91 | ENGI0302-040 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ENGI0302-040 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLERScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ENGI0302-040 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ENGI0302-040 eff. 01/01/2025 |
| IRONWORKER, STRUCTURAL | $43.40 | $30.27 | $73.67 | IRON0014-002 eff. 07/03/2025 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 | LABO0155-008 eff. 01/01/2025 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 | LABO0155-008 eff. 01/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $24.70 | $12.10 | $36.80 | SUID2010-029 eff. 08/08/2012 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 | SUID2010-029 eff. 08/08/2012 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | SUID2010-029 eff. 08/08/2012 |
| OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | SUID2010-029 eff. 08/08/2012 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | SUID2010-029 eff. 08/08/2012 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.02 | $9.93 | $35.95 | SUID2010-029 eff. 08/08/2012 |
| LABORER: PIPELAYER | $17.67 | $7.26 | $24.93 | SUID2010-029 eff. 08/08/2012 |
| LABORER: COMMON OR GENERAL | $22.46 | $10.00 | $32.46 | SUID2010-029 eff. 08/08/2012 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 | SUID2010-029 eff. 08/08/2012 |
| CEMENT MASON/CONCRETE FINISHER | $23.25 | $12.31 | $35.56 | SUID2010-029 eff. 08/08/2012 |
| CARPENTER, INCLUDES FORM WORK | $25.41 | $9.98 | $35.39 | SUID2010-029 eff. 08/08/2012 |
| TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) | $37.19 | $17.00 | $54.19 | TEAM0483-003 eff. 01/01/2025 |
| TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) | $36.75 | $17.00 | $53.75 | TEAM0483-003 eff. 01/01/2025 |
| TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) | $36.12 | $17.00 | $53.12 | TEAM0483-003 eff. 01/01/2025 |
| TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) | $36.01 | $17.00 | $53.01 | TEAM0483-003 eff. 01/01/2025 |
| TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) | $35.78 | $17.00 | $52.78 | TEAM0483-003 eff. 01/01/2025 |
| TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) | $35.60 | $17.00 | $52.60 | TEAM0483-003 eff. 01/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.