Idaho prevailing wage rates: ID20260046
Heavy construction in Clark County.
ID20260046, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
7 classifications added, 7 removed or reworded
- removed LABORER: Asphalt Including Raker, Shoveler, Spreader, and Distributor: Group 3 was $33.83 + $16.50 fringe
- removed LABORER: Flagger: Group 1 was $33.63 + $16.50 fringe
- added LABORER: GROUP 1 FLAGGER $33.63 + $16.50 fringe
- added LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $33.83 + $16.50 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer, Scraper (over 80 yds to 100 yds): GROUP 8 was $37.58 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Drilling (bit under 8in), Oiler, Scraper (up to and including 40 yds): GROUP 6 was $36.98 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) $38.06 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER $36.33 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) $36.98 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) $37.35 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) $37.58 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Roller: GROUP 3 was $36.33 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Scraper (over 100 yds): GROUP 10 was $38.06 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Scrapers (over 40 yds to 60 yds): Heavy Duty Mechanic, GROUP 7 was $37.35 + $16.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
CARPENTER: EXCLUDES FORM WORK (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES)Scope and notesZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $35.68 | $18.24 | $53.92 | CARP0808-009 eff. 06/01/2025 |
| ELECTRICIAN | $40.00 | $18.74 | $58.74 | ELEC0449-004 eff. 12/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.58 | $16.10 | $53.68 | ENGI0370-032 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 7: DRILL (BIT 8 IN AND OVER), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ENGI0370-032 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6 DRILLING (BIT UNDER 8IN), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.98 | $16.10 | $53.08 | ENGI0370-032 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLERScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ENGI0370-032 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS)Scope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ENGI0370-032 eff. 01/01/2025 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | $56.35 | IRON0732-003 eff. 06/01/2024 |
| LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | $50.33 | LABO0155-008 eff. 01/01/2025 |
| LABORER: GROUP 1 FLAGGER | $33.63 | $16.50 | $50.13 | LABO0155-008 eff. 01/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $24.57 | $11.22 | $35.79 | SUID2010-039 eff. 08/08/2012 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 | SUID2010-039 eff. 08/08/2012 |
| TRUCK DRIVER: DUMP TRUCK | $17.53 | $0.00 | $17.53 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: LOADER (FRONT END) | $21.33 | $6.11 | $27.44 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: GRADER/BLADE | $24.91 | $8.79 | $33.70 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: FORKLIFT | $17.00 | $0.00 | $17.00 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: CRANE | $24.30 | $8.38 | $32.68 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | $21.05 | SUID2010-039 eff. 08/08/2012 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.40 | $6.59 | $27.99 | SUID2010-039 eff. 08/08/2012 |
| LABORER: PIPELAYER | $16.68 | $3.77 | $20.45 | SUID2010-039 eff. 08/08/2012 |
| LABORER: COMMON OR GENERAL | $21.16 | $10.15 | $31.31 | SUID2010-039 eff. 08/08/2012 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | $43.92 | SUID2010-039 eff. 08/08/2012 |
| CEMENT MASON/CONCRETE FINISHER | $18.02 | $0.00 | $18.02 | SUID2010-039 eff. 08/08/2012 |
| CARPENTER (FORM WORK ONLY) | $25.27 | $9.10 | $34.37 | SUID2010-039 eff. 08/08/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.