Idaho prevailing wage rates: ID20260051
Heavy construction in Idaho County.
ID20260051, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
16 classifications added, 18 removed or reworded
- removed LABORER (Common-PIPELINE ONLY) was $33.63 + $16.50 fringe
- added LABORER: (PIPELINE ONLY): COMMON (PART OF IDAHO COUNTY SOUTH OF 46TH PARALLEL) $33.63 + $16.50 fringe
- removed LABORER: Asphalt Laborer Includes Asphalt Raker, Shoveler, Spreader, and Distributor: Group 4 was $28.48 + $13.00 fringe
- removed LABORER: Common or General: Group 2 was $32.15 + $16.30 fringe
- removed LABORER: Flagger: Group 1A was $25.84 + $13.00 fringe
- added LABORER: GROUP 2 COMMON OR GENERAL IDAHO COUNTY NORTH OF 46TH PARALLEL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE $32.15 + $16.30 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe (45,000 gw & under), Cranes (25 tons & under), Drill (8 in bit and over: GROUP 5 was $36.81 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe (45,000-110,000 gw), Crane (25-45 tons), Bulldozer (D-6 and over), Grader/Blade, Front-End Loader(4-8 yds), Paver, Scrapers (all): GROUP 6 was $36.98 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe (over 110,000 gw), Cranes (45-85 tons), Heavy Duty Mechanic, Front End Loader (8-10 yds): GROUP 7 was $37.35 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Blade Operator, Backhoe (3/4 yds- 31/2 yds), Cranes (up to and including 50 tons), Drilling (bit under 8in), Front End Loader (over 4 yds to and including 7yds), Paver, Scraper (up to and including 40 yds): GROUP 6 was $36.98 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer (up to D-6): GROUP 3 was $36.33 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer, Scraper (over 80 yds to 100 yds): GROUP 8 was $37.58 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Cranes (85 tons & over), Front End Loader (10 yds & over): GROUP 8 was $37.58 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Cranes (over 50 tons), Drill (bit 8 in and over), Grader (Fine), Front End Loader (over 7 yds), Heavy Duty Mechanic, Scrapers (over 40 yds to 60 yds), Tower Crane: GROUP 7 was $37.35 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Elevating Grader Operator, Backhoe (under 3/4 yds): GROUP 5 was $36.81 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Front End Loader (under 4 yds): GROUP 4 was $36.64 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Front End Loader (up to 4yd): GROUP 4 was $36.64 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY $35.80 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $38.06 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY $36.33 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $36.33 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY $36.64 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $36.64 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE $36.81 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $36.81 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY $36.98 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, BACKHOE (3/4 YDS- 31/2 YDS), CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), PAVER, SCRAPER (UP TO AND INCLUDING 40 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $36.98 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) $37.35 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 7 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $37.35 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTY $37.58 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY $37.58 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Roller: GROUP 3 was $36.33 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Rollers (all): GROUP 1 was $35.80 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Scraper (over 100 yds): GROUP 10 was $38.06 + $16.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $38.87 | $17.84 | $56.71 | CARP0001-045 eff. 06/01/2021 |
| ELECTRICIAN | $49.55 | $19.09 | $68.64 | ELEC0073-011 eff. 08/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $37.58 | $15.95 | $53.53 | ENGI0370-041 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $37.35 | $15.95 | $53.30 | ENGI0370-041 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $36.98 | $15.95 | $52.93 | ENGI0370-041 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTY ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $36.81 | $15.95 | $52.76 | ENGI0370-041 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $36.64 | $15.95 | $52.59 | ENGI0370-041 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $36.33 | $15.95 | $52.28 | ENGI0370-041 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) AREA NORTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $35.80 | $15.95 | $51.75 | ENGI0370-041 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT: $.45 OVER SCALE | $37.58 | $16.10 | $53.68 | ENGI0370-042 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 7 CRANES (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $37.35 | $16.10 | $53.45 | ENGI0370-042 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, BACKHOE (3/4 YDS- 31/2 YDS), CRANES (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), PAVER, SCRAPER (UP TO AND INCLUDING 40 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.98 | $16.10 | $53.08 | ENGI0370-042 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | $36.81 | $16.10 | $52.91 | ENGI0370-042 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.64 | $16.10 | $52.74 | ENGI0370-042 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $36.33 | $16.10 | $52.43 | ENGI0370-042 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) AREA SOUTH OF 46TH PARALLEL IN IDAHO COUNTYScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $38.06 | $16.10 | $54.16 | ENGI0370-042 eff. 01/01/2025 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 | $73.67 | IRON0014-006 eff. 07/03/2025 |
| LABORER: (PIPELINE ONLY): COMMON (PART OF IDAHO COUNTY SOUTH OF 46TH PARALLEL) | $33.63 | $16.50 | $50.13 | LABO0155-007 eff. 01/01/2025 |
| LABORER: FLAGGER, COMMON OR GENERAL LABORER (IDAHO COUNTY SOUTH OF 46TH PARALLEL) | $33.63 | $15.50 | $49.13 | LABO0155-009 eff. 01/01/2025 |
| LABORER: ASPHALT LABORER INCLUDES ASPHALT RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR (IDAHO COUNTY SOUTH OF 46TH PARALLEL) | $33.63 | $15.50 | $49.13 | LABO0155-009 eff. 01/01/2025 |
| LABORER (PIPELINE ONLY): COMMON (IDAHO COUNTY NORTH OF 46TH PARALLEL) | $26.28 | $12.15 | $38.43 | LABO0238-029 eff. 06/01/2017 |
| LABORER: GROUP 2 COMMON OR GENERAL IDAHO COUNTY NORTH OF 46TH PARALLEL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 | $48.45 | LABO0238-032 eff. 06/01/2024 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | PLAS0072-003 eff. 06/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $24.48 | $11.67 | $36.15 | SUID2010-044 eff. 08/08/2012 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 | SUID2010-044 eff. 08/08/2012 |
| TRUCK DRIVER: DUMP TRUCK | $24.70 | $12.10 | $36.80 | SUID2010-044 eff. 08/08/2012 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | SUID2010-044 eff. 08/08/2012 |
| OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | SUID2010-044 eff. 08/08/2012 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | SUID2010-044 eff. 08/08/2012 |
| LABORER: PIPELAYER | $17.67 | $7.26 | $24.93 | SUID2010-044 eff. 08/08/2012 |
| LABORER: LANDSCAPE | $22.13 | $11.13 | $33.26 | SUID2010-044 eff. 08/08/2012 |
| CARPENTER, EXCLUDES FORM WORK | $29.92 | $5.20 | $35.12 | SUID2010-044 eff. 08/08/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.