Idaho prevailing wage rates: ID20260054
Heavy construction in Lewis County.
ID20260054, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
9 classifications added, 9 removed or reworded
- removed LABORER: Asphalt Includes Raker, Shoveler, Spreader, and Distributor: Group 4 was $28.48 + $13.00 fringe
- removed LABORER: Flagger: Group 1A was $25.84 + $13.00 fringe
- added LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE $28.48 + $13.00 fringe
- added LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE $25.84 + $13.00 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe (45,000 gw & under), Cranes (25 tons & under), Drill (8 in bit and over: GROUP 5 was $28.76 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe (45,000-110,000 gw), Crane (25-45 tons), Bulldozer (D-6 and over), Grader/Blade, Front-End Loader(4-8 yds), Paver, Scrapers (all): GROUP 6 was $29.04 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Backhoe (over 110,000 gw), Cranes (45-85 tons), Heavy Duty Mechanic, Front End Loader (8-10 yds): GROUP 7 was $29.31 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Bulldozer (up to D-6): GROUP 3 was $28.44 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Cranes (85 tons & over), Front End Loader (10 yds & over): GROUP 8 was $30.41 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Front End Loader (under 4 yds): GROUP 4 was $28.60 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) $27.51 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) $28.44 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) $28.60 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE $28.76 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) $29.04 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) $29.31 + $15.95 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) $30.41 + $15.95 fringe
- removed POWER EQUIPMENT OPERATOR: Rollers (all): GROUP 1 was $27.51 + $15.95 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $38.87 | $17.84 | $56.71 | CARP0001-045 eff. 06/01/2021 |
| ELECTRICIAN | $49.55 | $19.09 | $68.64 | ELEC0073-011 eff. 08/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | ENGI0370-035 eff. 06/01/2018 |
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | ENGI0370-035 eff. 06/01/2018 |
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | ENGI0370-035 eff. 06/01/2018 |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | ENGI0370-035 eff. 06/01/2018 |
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | ENGI0370-035 eff. 06/01/2018 |
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | ENGI0370-035 eff. 06/01/2018 |
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL)Scope and notesZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | ENGI0370-035 eff. 06/01/2018 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 | $73.67 | IRON0014-006 eff. 07/03/2025 |
| LABORER (PIPELINE ONLY): COMMON | $26.28 | $12.15 | $38.43 | LABO0238-028 eff. 06/01/2017 |
| LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $25.84 | $13.00 | $38.84 | LABO0238-031 eff. 07/01/2019 |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 | LABO0238-031 eff. 07/01/2019 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | PLAS0072-003 eff. 06/01/2025 |
| PLUMBER (ZONE 1) | $37.71 | $23.44 | $61.15 | PLUM0044-015 eff. 06/01/2019 |
| TRUCK DRIVER: WATER TRUCK | $24.48 | $11.67 | $36.15 | SUID2010-047 eff. 08/08/2012 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 | SUID2010-047 eff. 08/08/2012 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 | SUID2010-047 eff. 08/08/2012 |
| OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 | SUID2010-047 eff. 08/08/2012 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 | SUID2010-047 eff. 08/08/2012 |
| LABORER: PIPELAYER | $17.67 | $7.26 | $24.93 | SUID2010-047 eff. 08/08/2012 |
| LABORER: LANDSCAPE | $22.13 | $11.13 | $33.26 | SUID2010-047 eff. 08/08/2012 |
| LABORER: COMMON OR GENERAL | $23.75 | $8.98 | $32.73 | SUID2010-047 eff. 08/08/2012 |
| CARPENTER, EXCLUDES FORM WORK | $29.92 | $5.20 | $35.12 | SUID2010-047 eff. 08/08/2012 |
| TRUCK DRIVER: DUMP (OVER 6 YDS) | $37.02 | $20.93 | $57.95 | TEAM0690-002 eff. 06/01/2024 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | $36.58 | $20.93 | $57.51 | TEAM0690-002 eff. 06/01/2024 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.