PrevailCrew

Idaho prevailing wage rates: ID20260072

Heavy construction in Power County.

ID20260072, modification 2, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

No existing rate changed amount.

6 classifications added, 6 removed or reworded
  • added POWER EQUIPMENT OPERATOR: BLADE OPERATOR, BACKHOE 3/4 YD-3 1/2 YD), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE $36.98 + $16.10 fringe
  • removed POWER EQUIPMENT OPERATOR: Blade Operator, Backhoe 3/4 yd-3 1/2 yd), Front End Loader (over 4 yds to and including 7yds), Oiler, Scraper (up to and including 40 yds): GROUP 6 was $36.98 + $16.10 fringe
  • removed POWER EQUIPMENT OPERATOR: Bulldozer, Scraper (over 80 yds to 100 yds): GROUP 8 was $37.58 + $16.10 fringe
  • removed POWER EQUIPMENT OPERATOR: Elevating Grader Operator, Backhoe (under 3/4 yd): GROUP 5 was $36.81 + $16.10 fringe
  • removed POWER EQUIPMENT OPERATOR: Front End Loader (up to 4yd): GROUP 4 was $36.64 + $16.10 fringe
  • removed POWER EQUIPMENT OPERATOR: Grader (Fine), Front End Loader (over 7 yds), Heavy Duty Mechanic, Scrapers (over 40 yds to 60 yds): GROUP 7 was $37.35 + $16.10 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS) $38.06 + $16.10 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD) $36.64 + $16.10 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YD) $36.81 + $16.10 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS) $37.35 + $16.10 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS) $37.58 + $16.10 fringe
  • removed POWER EQUIPMENT OPERATOR: Scraper (over 100 yds): GROUP 10 was $38.06 + $16.10 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

ID20260072 wage rates
ClassificationBaseFringeTotalRate ID
ELECTRICIAN$40.00$18.74$58.74ELEC0449-004
eff. 12/01/2025
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER (OVER 80 YDS TO 100 YDS)
Scope and notes

ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$37.58$16.10$53.68ENGI0370-040
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS)
Scope and notes

ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$37.35$16.10$53.45ENGI0370-040
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 5 ELEVATING GRADER OPERATOR, BACKHOE (UNDER 3/4 YD)
Scope and notes

ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$36.81$16.10$52.91ENGI0370-040
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UP TO 4YD)
Scope and notes

ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$36.64$16.10$52.74ENGI0370-040
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER (OVER 100 YDS)
Scope and notes

ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE

$38.06$16.10$54.16ENGI0370-040
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: BLADE OPERATOR, BACKHOE 3/4 YD-3 1/2 YD), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE$36.98$16.10$53.08ENGI0370-040
eff. 01/01/2025
LABORER: GENERAL OR COMMON ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE$32.15$16.30$48.45LABO0238-033
eff. 06/01/2024
TRUCK DRIVER: WATER TRUCK$21.00$13.42$34.42SUID2010-065
eff. 08/08/2012
LABORER: MASON TENDER - CEMENT/CONCRETE$22.15$10.15$32.30SUID2010-065
eff. 08/08/2012
LABORER: GRADE CHECKER$22.68$10.90$33.58SUID2010-065
eff. 08/08/2012
CEMENT MASON/CONCRETE FINISHER$22.43$15.06$37.49SUID2010-065
eff. 08/08/2012
CARPENTER, EXCLUDES FORM WORK$26.06$11.26$37.32SUID2010-065
eff. 08/08/2012
CARPENTER (FORM WORK ONLY)$23.92$9.03$32.95SUID2010-065
eff. 08/08/2012
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS)$37.19$17.00$54.19TEAM0983-002
eff. 01/01/2025
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS)$36.75$17.00$53.75TEAM0983-002
eff. 01/01/2025
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS)$36.12$17.00$53.12TEAM0983-002
eff. 01/01/2025
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS)$36.01$17.00$53.01TEAM0983-002
eff. 01/01/2025
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS)$35.78$17.00$52.78TEAM0983-002
eff. 01/01/2025
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS)$35.60$17.00$52.60TEAM0983-002
eff. 01/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.