Idaho prevailing wage rates: ID20260083
Highway construction in Minidoka County.
ID20260083, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
1 classifications added, 1 removed or reworded
- added POWER EQUIPMENT OPERATOR: GROUP 7 MECHANIC $37.35 + $16.10 fringe
- removed POWER EQUIPMENT OPERATOR: Mechanic: GROUP 7 was $37.35 + $16.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN | $40.00 | $18.74 | $58.74 | ELEC0449-001 eff. 12/01/2025 |
POWER EQUIPMENT OPERATOR: GROUP 7 MECHANICScope and notesZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 | $53.45 | ENGI0302-015 eff. 01/01/2025 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | PLAS0072-001 eff. 06/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $21.35 | $13.05 | $34.40 | SUID2013-011 eff. 06/17/2013 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 | SUID2013-011 eff. 06/17/2013 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.53 | $12.98 | $34.51 | SUID2013-011 eff. 06/17/2013 |
| TRUCK DRIVER: DUMP TRUCK | $21.19 | $13.30 | $34.49 | SUID2013-011 eff. 06/17/2013 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $21.35 | $13.05 | $34.40 | SUID2013-011 eff. 06/17/2013 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 | SUID2013-011 eff. 06/17/2013 |
| TRAFFIC CONTROL: FLAGGER | $22.68 | $10.90 | $33.58 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: SCREED | $25.63 | $10.34 | $35.97 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: ROTOMILL | $26.54 | $10.00 | $36.54 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: ROLLER | $25.47 | $10.32 | $35.79 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.67 | $10.56 | $36.23 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: LOADER | $25.78 | $10.17 | $35.95 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: GRADER/BLADE | $26.14 | $10.69 | $36.83 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: CRANE | $26.04 | $10.00 | $36.04 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: BULLDOZER | $26.19 | $9.60 | $35.79 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: BROOM/SWEEPER | $25.01 | $10.16 | $35.17 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | SUID2013-011 eff. 06/17/2013 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 | $35.80 | SUID2013-011 eff. 06/17/2013 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.69 | $10.97 | $34.66 | SUID2013-011 eff. 06/17/2013 |
| LABORER: GRADE CHECKER | $23.45 | $10.97 | $34.42 | SUID2013-011 eff. 06/17/2013 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 | SUID2013-011 eff. 06/17/2013 |
| LABORER: COMMON OR GENERAL | $22.68 | $10.90 | $33.58 | SUID2013-011 eff. 06/17/2013 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $22.88 | $10.91 | $33.79 | SUID2013-011 eff. 06/17/2013 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $26.38 | $7.89 | $34.27 | SUID2013-011 eff. 06/17/2013 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 | SUID2013-011 eff. 06/17/2013 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.