Idaho prevailing wage rates: ID20260086
Highway construction in Adams, Payette, Valley, Washington Counties.
ID20260086, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | PLAS0072-001 eff. 06/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $23.99 | $11.12 | $35.11 | SUID2013-014 eff. 06/17/2013 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $22.54 | $12.35 | $34.89 | SUID2013-014 eff. 06/17/2013 |
| TRUCK DRIVER: LOWBOY TRUCK | $22.12 | $13.20 | $35.32 | SUID2013-014 eff. 06/17/2013 |
| TRUCK DRIVER: DUMP TRUCK | $21.80 | $13.95 | $35.75 | SUID2013-014 eff. 06/17/2013 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 | $33.56 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: SCREED | $24.07 | $9.63 | $33.70 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: ROTOMILL | $27.06 | $12.65 | $39.71 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: ROLLER (SUBGRADE) | $22.24 | $8.57 | $30.81 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: ROLLER | $25.24 | $10.42 | $35.66 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.63 | $10.33 | $35.96 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: OILER | $25.66 | $9.23 | $34.89 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: MECHANIC | $25.40 | $8.63 | $34.03 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: LOADER | $25.15 | $9.83 | $34.98 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: HYDROSEEDER | $24.76 | $11.51 | $36.27 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: GRADER/BLADE | $26.00 | $10.30 | $36.30 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: CRUSHER | $25.06 | $9.23 | $34.29 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: CRANE | $26.04 | $10.28 | $36.32 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: BULLDOZER | $25.94 | $10.36 | $36.30 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: BROOM/SWEEPER | $23.93 | $9.09 | $33.02 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 | $36.90 | SUID2013-014 eff. 06/17/2013 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.20 | $9.97 | $36.17 | SUID2013-014 eff. 06/17/2013 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.88 | $11.05 | $34.93 | SUID2013-014 eff. 06/17/2013 |
| LABORER: GRADE CHECKER | $23.41 | $10.78 | $34.19 | SUID2013-014 eff. 06/17/2013 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 | $35.03 | SUID2013-014 eff. 06/17/2013 |
| LABORER: COMMON OR GENERAL | $23.88 | $11.05 | $34.93 | SUID2013-014 eff. 06/17/2013 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.09 | $10.44 | $33.53 | SUID2013-014 eff. 06/17/2013 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $23.80 | $6.67 | $30.47 | SUID2013-014 eff. 06/17/2013 |
| ELECTRICIAN | $26.83 | $11.94 | $38.77 | SUID2013-014 eff. 06/17/2013 |
| CARPENTER (FORM WORK ONLY) | $26.57 | $8.10 | $34.67 | SUID2013-014 eff. 06/17/2013 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.