Idaho prevailing wage rates: ID20260092
Highway construction in Boise County.
ID20260092, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
1 classifications added, 1 removed or reworded
- removed POWER EQUIPMENT OPERATOR: Bulldozer: GROUP 8 was $37.58 + $16.10 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER $37.58 + $16.10 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 | $53.68 | ENGI0302-034 eff. 01/01/2025 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 | LABO0238-035 eff. 06/01/2019 |
| TRUCK DRIVER: WATER TRUCK | $18.72 | $9.30 | $28.02 | SUID2013-020 eff. 06/17/2013 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | $35.20 | SUID2013-020 eff. 06/17/2013 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 | $39.82 | SUID2013-020 eff. 06/17/2013 |
| TRUCK DRIVER: DUMP TRUCK | $21.30 | $0.00 | $21.30 | SUID2013-020 eff. 06/17/2013 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $16.17 | $4.66 | $20.83 | SUID2013-020 eff. 06/17/2013 |
| TRAFFIC CONTROL: FLAGGER | $14.02 | $4.66 | $18.68 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: SCREED | $19.26 | $4.55 | $23.81 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: ROTOMILL | $28.05 | $10.00 | $38.05 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 | $27.98 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: ROLLER | $18.82 | $3.86 | $22.68 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.18 | $3.86 | $24.04 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: OILER | $21.47 | $5.40 | $26.87 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: MECHANIC | $23.55 | $8.54 | $32.09 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: LOADER | $22.79 | $5.86 | $28.65 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: GRADER/BLADE | $22.33 | $5.71 | $28.04 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 | $32.30 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: CRANE | $23.34 | $9.45 | $32.79 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: BROOM/SWEEPER | $21.89 | $5.65 | $27.54 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 | $29.35 | SUID2013-020 eff. 06/17/2013 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.57 | $5.50 | $26.07 | SUID2013-020 eff. 06/17/2013 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.50 | $5.41 | $20.91 | SUID2013-020 eff. 06/17/2013 |
| LABORER: GRADE CHECKER | $15.95 | $3.86 | $19.81 | SUID2013-020 eff. 06/17/2013 |
| LABORER: COMMON OR GENERAL | $15.83 | $4.66 | $20.49 | SUID2013-020 eff. 06/17/2013 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $21.57 | $8.61 | $30.18 | SUID2013-020 eff. 06/17/2013 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 | $34.99 | SUID2013-020 eff. 06/17/2013 |
| ELECTRICIAN | $26.97 | $12.10 | $39.07 | SUID2013-020 eff. 06/17/2013 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $5.41 | $21.41 | SUID2013-020 eff. 06/17/2013 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 | $33.67 | SUID2013-020 eff. 06/17/2013 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 | $35.72 | SUID2013-020 eff. 06/17/2013 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.