PrevailCrew

Illinois prevailing wage rates: IL20260003

Building, Residential construction in Peoria, Tazewell Counties.

IL20260003, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

1 classifications added, 2 removed or reworded
  • added LABORER GROUP 3ASBESTOS ABATEMENT WORKER (REMOVAL/ENCAPSULATION); LEAD BASE PAINT ABATEMENT WORKER (REMOVAL/ENCAPSULATION); HAZARDOUS WASTE WORKER (LEVEL A & B) (PEORIA AND TAZEWELL (NORTHWEST) COUNTIES) $36.00 + $33.28 fringe
  • removed LABORER: Group 3 was $36.00 + $33.28 fringe
  • removed LABORER: Residential was $23.20 + $26.05 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

IL20260003 wage rates
ClassificationBaseFringeTotalRate ID
BOILERMAKER$45.23$32.76$77.99BOIL0060-002
eff. 01/01/2025
BRICKLAYER$36.83$24.47$61.30BRIL0006-006
eff. 06/01/2021
MARBLE & TILE SETTER AND TERRAZZO WORKER (PEORIA AND TAZEWELL COUNTIES)$37.60$24.48$62.08BRIL0006-013
eff. 06/01/2021
BASE MACHINE MEN: BASE MACHINE OPERATOR (PEORIA AND TAZEWELL COUNTIES)$34.16$24.46$58.62BRIL0006-014
eff. 06/01/2021
CARPENTER: RESIDENTIAL (PEORIA AND TAZEWELL COUNTIES)$30.22$29.10$59.32CARP0237-011
eff. 05/15/2020
CARPENTER, BUILDING: PILEDRIVERMAN (PEORIA AND TAZEWELL COUNTIES)$34.58$29.10$63.68CARP0237-011
eff. 05/15/2020
CARPENTER, BUILDING: JOURNEYMAN (PEORIA AND TAZEWELL COUNTIES)$33.58$29.10$62.68CARP0237-011
eff. 05/15/2020
MILLWRIGHT$33.06$29.97$63.03CARP1051-002
eff. 05/15/2020
ELECTRICIAN (BUILDING)$39.50$24.24$63.74ELEC0034-004
eff. 03/01/2025
ELECTRICIAN (RESIDENTIAL)$26.58$18.50$45.08ELEC0034-004
eff. 03/01/2025
ELEVATOR MECHANIC
Scope and notes

FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE B) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY

$57.99$38.44$96.43ELEV0055-002
eff. 01/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; POWER SUBGRADER; STRAIGHT TRACTOR; TRAC AIR WITHOUT ATTAHMENTS; ROLLER: FIVE (5) TON AND UNDER ON EARTH OR GRAVEL; FORM GRADER; CRAWLER CRANE, SKID RIG OILERS & OILERS WITH CDL; CONVEYOR (1) OR (2); MIXER (3) BAG AND UNDER(STANDARD CAPACITY WITH SKIP); BULK CEMENT PLANT; OILER ON CENTRAL CONCRETE MIXING PLANT; STUD WELDER$38.03$43.42$81.45ENGI0649-003
eff. 04/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/DITCHING MACHINE OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT AND GRAVEL BATCHING PLANTS; MOBILE DRILLS (SOIL TESTING) AND SIMILAR TYPES; GURRIES AND SIMILAR TYPES; 1 AND 2 DRUM HOISTS (BUCK HOISTS AND SIMILAR TYPES); CHICAGO BOOM; HORIZONTAL BORING MACHINE & PIPE JACKING MACHINE; HYDRO BOOM; DEWATERING SYSTEM; STRAW BLOWER; HYDRO SEEDER; ASSISTANT HEAVY EQUIPMENT GREASER ON SPREAD; TRACTORS (TRACK- TYPE) WITHOUT POWER UNIT PULLING ROLLERS; ROLLERS ON ASPHALT - BRICK OR MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; MULE PULLING ROLLERS; CEMENT STRIPPER; CEMENT FINISHING MACHINES & CMI TEXTURE & REEL CURING MACHINES; CEMENT FINISHING MACHINE; BARBER GREEN OR SIMILAR LOADERS; VIBRO TAMPER (ALL SIMILAR TYPES) SELF- PROPELLED; WINCH OR BOOM TRUCK; MECHANICAL BULL FLOATS; MIXERS OVER 3 BAGS; TRACTOR PULLING POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; CLARY SCREED; TRUCK-TYPE OILERS WITH CDL; FIREMAN; SPRAY MACHINE ON PAVING; CURB MACHINES; TRUCK CRANE OILERS WITH CDL; OIL DISTRIBUTOR; TRUCK-MOUNTED SAWS; ALL ELEVATOR, PERMANENTLY INSTALLED USED FOR HOISTING OR LOWERING BUILDING MATERIAL; CONSTRUCTION ELEVATOR TEMPORARILY INSTALLED$44.09$43.42$87.51ENGI0649-003
eff. 04/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATOR; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI-BATCHERS); BLACKTOP PLANT OPERATORS AND PLANT ENGINEERS; 3-DRUM HOIST; DERRICKS; HYDRO CRANES (NON-LATTICE BOOM TRUCK CRANES HAVING THREE (3) AXLES OR LESS SHALL NOT REQUIRE AN OILER, A DOLLY SHALL COUNT AS AN AXLE); SHOVELS; SKIMMER SCOOPS; KOEHRING SCOOPER; DRAGLINES; BACKHOE; DERRICK BOATS; 360" SWING EXCAVATORS; LOCOMOTIVE CRANES; DREDGE (ALL TYPES); GUARD RAIL MACHINES ( MACHINES THAT CANNOT BE MOVED FORWARD FROM THE POST POUNDER SEAT REQUIRES AN OILER); MOTOR PATROL; POWER BLADES-DUMORE-ELEVATING AND SIMILAR TYPES; TOWER CRANES (CRAWLER-MOBILE) AND STATIONARY; CRANE-TYPE BACK-FILLER; DROTT YUMBO AND SIMILAR TYPES CONSIDERED AS CRANES; CAISSON RIGS; DOZER; TOURNADOZER; WORK BOATS; ROSS CARRIER; TUNNEL BORING MACHINE (SHALL REQUIRE AN OILER); CARTS/HAUL UNITS FOR A BORING MACHINE; HELICOPTER; TOURNAPULLS - ALL AND SIMILAR TYPES; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; ROCK CRUSHER; HEAVY EQUIPMENT GREASER; CMI, CMI BELT PLACER, AUTO GRADE & 3 TRACK AND SIMILAR TYPES; SIDE BOOMS; MULTIPLE UNIT EARTH MOVERS: .75 CENTS PER HR., FOR EACH SCOOP OVER ONE (1); CRETER CRANE; TRENCH MACHINE; PUMPCRETE-BELT CRETE- SQUEEZE CRETES-SCREW-TYPE PUMPS AND GYPSUM, BULKER & PUMP- OPERATOR WILL CLEAN; FORMLESS FINISHING MACHINE; FLAHERTY SPREADER OR SIMILAR TYPES; SCREEE MAN ON LAYDOWN MACHINE; WHEEL TRACTORS (INDUSTRIAL OR FARM-TYPE W/DOZER-HOE-ENDLOADER OR OTHER ATTACHMENTS); FWD & SIMILAR TYPES; VERMEER CONCRETE SAW; SELF PROPELLED CONCRETE SAW; MATERIAL CRUSHER; SCREENING PLANTS; LASER SCREED; SPAN SAW; LULL & SIMILAR TYPES; OFF ROAD TRUCKS, ARTICULATING END DUMP VEHICLES & SIMILAR TYPES; CONCRETE & ALL RECYCLING MACHINES$47.79$43.42$91.21ENGI0649-003
eff. 04/01/2025
IRONWORKER (PEORIA AND TAZEWELL COUNTIES)$39.24$33.88$73.12IRON0112-003
eff. 05/01/2025
LABORER GROUP 3ASBESTOS ABATEMENT WORKER (REMOVAL/ENCAPSULATION); LEAD BASE PAINT ABATEMENT WORKER (REMOVAL/ENCAPSULATION); HAZARDOUS WASTE WORKER (LEVEL A & B) (PEORIA AND TAZEWELL (NORTHWEST) COUNTIES)$36.00$33.28$69.28LABO0165-001
eff. 05/01/2025
LABORER GROUP 2 SKILLED LABORER - CONCRETE SPECIALIST; CUTTING AND ACETYLENE TORCH; GUNNITE NOZZLEMEN; GUNNITE PUMP MEN AND POTS; KETTLEMEN AND CARRIERS OF MEN HANDLING HOT STUFF; SANDBLAST NOZZLE MEN; SANDBLAST NOZZLE MEN AND POTS; SETTING UP AND USING CONCRETE BURNING BARS; WOOD BLOCK SETTERS; UNDERPINNING AND SHORING OF EXISTING BUILDINGS; UNLOADING AND HANDLING OF ALL MATERIAL COATED WITH CREOSOTE (PEORIA AND TAZEWELL (NORTHWEST) COUNTIES)$34.40$33.28$67.68LABO0165-001
eff. 05/01/2025
LABORER GROUP 1 GENERAL LABORER - AIR TAMPER; BRICKLAYER TENDER; HAZARDOUS WASTE WORKER (LEVELS C & D); CARPENTER TENDER; CEMENT MASON AND SACK SHAKERS; CEMENT MASON TENDER; CHAIN SAW; COMPACT RAMMER TYPE; CONCRETE FORM DISMANTLER; CONCRETE FORM DISMANTLER IN COMPOSITE CREW/CARPENTER; CONCRETE SAW; CURING CONCRETE; DRILL OPERATOR, JACKHAMMER (OPEN); HIGH PRESSURE HOSE; PAVING BREAKER; PLASTER TENDER; POWER WHEELBARROWS OR BUGGIES; SETTING UP AND USING LASER BEAM EQUIPMENT; SIGNALING AND SPOTTING OF BUCKETS ON RIG OR RIG MEN; STONE, TILE AND DERRICK MEN; TOOL CRIB MEN; WATCHMEN; WINDOW WASHERS; WRECKING, DISMANTLING OLD BUILDINGS; WALL MEN AND HOUSEMOVER (PEORIA AND TAZEWELL (NORTHWEST) COUNTIES)$34.00$33.28$67.28LABO0165-001
eff. 05/01/2025
LABORER: BUILDING (TAZEWELL COUNTY (SOUTHEAST))$34.00$30.04$64.04LABO0231-001
eff. 05/01/2024
PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES)$40.00$26.90$66.90PAIN0157-001
eff. 06/01/2023
GLAZIER (PEORIA AND TAZWELL COUNTIES)$39.74$27.78$67.52PAIN0157-010
eff. 05/01/2024
PLASTERER$31.00$30.07$61.07PLAS0018-014
eff. 05/01/2021
CEMENT MASON/CONCRETE FINISHER$31.48$30.33$61.81PLAS0018-014
eff. 05/01/2021
PLUMBER$42.70$30.98$73.68PLUM0063-001
eff. 05/01/2025
PIPEFITTER$41.10$27.59$68.69PLUM0353-001
eff. 05/01/2024
ROOFER$38.05$24.60$62.65ROOF0069-001
eff. 07/21/2025
SHEET METAL WORKER (RESIDENTIAL)$28.18$33.06$61.24SHEE0001-002
eff. 05/01/2024
SHEET METAL WORKER (BUILDING)$39.50$33.06$72.56SHEE0001-002
eff. 05/01/2024
TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK$45.59$24.27$69.86TEAM0627-001
eff. 05/01/2024
TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS$44.49$24.27$68.76TEAM0627-001
eff. 05/01/2024
TRUCK DRIVER: GROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS$44.10$24.27$68.37TEAM0627-001
eff. 05/01/2024
TRUCK DRIVER: GROUP 2- 2 OR 3 AXLES HUALING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS$43.83$24.27$68.10TEAM0627-001
eff. 05/01/2024
TRUCK DRIVER: GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY$43.24$24.27$67.51TEAM0627-001
eff. 05/01/2024

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.