PrevailCrew

Illinois prevailing wage rates: IL20260006

Building, Residential construction in Kankakee County.

IL20260006, modification 2, published 11/05/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

  • changed OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER base $64.80 → $68.80 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
  • changed OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH "A" FRAME. *-REQUIRES OILER base $63.50 → $67.50 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
  • changed OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) base $60.95 → $64.95 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
  • changed OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS base $59.20 → $63.20 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

IL20260006 wage rates
ClassificationBaseFringeTotalRate ID
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)$41.27$32.76$74.03ASBE0017-004
eff. 06/01/2024
FIRE STOP TECHNICIAN$44.02$32.76$76.78ASBE0017-004
eff. 06/01/2024
ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$55.02$35.75$90.77ASBE0017-004
eff. 06/01/2024
BOILERMAKER$53.10$38.54$91.64BOIL0001-001
eff. 05/01/2024
BRICKLAYER, CAULKER, CEMENT MASON, CLEANER, POINTER & STONEMASON (RESIDENTIAL)$32.24$21.79$54.03BRIL0006-016
eff. 06/01/2017
BRICKLAYER, CAULKER, CEMENT MASON, CLEANER, POINTER & STONEMASON (BUILDING)$42.98$21.79$64.77BRIL0006-016
eff. 06/01/2017
MARBLE SETTER$44.63$26.83$71.46BRIL0021-003
eff. 06/01/2017
TILE FINISHER$38.84$21.79$60.63BRIL0021-007
eff. 06/01/2017
MARBLE FINISHER$33.95$26.03$59.98BRIL0021-011
eff. 06/01/2017
CARPENTER; DRYWALL HANGER; PILEDRIVER; SOFT FLOOR LAYER (BUILDING & RESIDENTIAL)$44.46$40.96$85.42CARP0555-016
eff. 06/01/2023
ELECTRICIAN (RESIDENTIAL)$46.48$33.36$79.84ELEC0176-006
eff. 06/01/2023
ELECTRICIAN (BUILDING)$51.60$45.00$96.60ELEC0176-007
eff. 06/01/2023
CATV INSTALLER$39.00$33.78$72.78ELEC0176-014
eff. 06/01/2021
ELEVATOR MECHANIC
Scope and notes

FOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEE WITH LESS THAN 5 YEARS SERVICE

$70.68$38.44$109.12ELEV0002-001
eff. 01/01/2025
OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS$63.20$53.05$116.25ENGI0150-026
eff. 06/01/2026
OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD)$64.95$53.05$118.00ENGI0150-026
eff. 06/01/2026
OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH "A" FRAME. *-REQUIRES OILER$67.50$53.05$120.55ENGI0150-026
eff. 06/01/2026
OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER$68.80$53.05$121.85ENGI0150-026
eff. 06/01/2026
IRONWORKER (KANKABEE COUNTY)$46.00$39.30$85.30IRON0444-005
eff. 06/01/2022
LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; DYNAMITE MAN; LEAD BASE PAINT ABATEMENT WORKER$43.25$33.59$76.84LABO0751-003
eff. 06/01/2023
LABORER GROUP 1 GENERAL LABORER AND SKILLED LABORER - HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LABORERS; CEMENT HANDLERS; CHLORIDE HANDLERS; UNLOADING AND LABORERS WITH STEEL WORKERS AND RE-BARS; CONCRETE WORKERS (WET); BATCH DUMPERS; MASON TENDERS; KETTLE AND TAR MEN; TANK CLEANERS; PLASTIC INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS; LABORERS WITH DE-WATERING SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA, CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE PAVING, PLACING, CUTTING AND TYING OF REINFORCING; DECK HAND, DREDGE HAND AND SHORE LABORERS; BANKMEN ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND LAYERS; GRADE CHECKER; POWER TOOLS; DRIVING ALL STAKES, STRINGLINES FOR ALL MACHINERY; SETTING AND BUILDING OF MANHOLES AND CATCH BASINS; STRIPPING OF ALL CONCRETE FORMS EXCEPT PAVING FORMS; ALL CONCRETE PAVING AND SLOPE WALLS, PLACING, CUTTING AND TYING OF REINFORCING (RE-BARS AND WIRE MESH); CAISSON WORKERS PLUS DEPTH; GUNNITE NOZZLE MEN; LEAD MAN ON SEWER WORK; WELDERS, CUTTERS, BURNERS, & TORCHMEN; CHAIN SAW OPERATORS; PAVING BREAKER, JACKHAMMER & DRILL OPERATORS; LAYOUT MAN AND/OR TILE LAYER; STEEL FORM SETTERS (STREET & HWY); AIR TAMPING HAMMERMAN; SIGNALMAN ON CRANE; CONCRETE SAW OPERATOR; SCREENMAN ON ASPHALT PAVERS; FRONT END MAN ON CHIP SPREADER; LABORERS TENDING MASONS WITH HOT MATERIALS OR WHERE FOREIGN MATERIALS ARE USED; MULTIPLE CONCRETE DUCT-LEADMAN; LUTEMAN; ASPHALT RAKER; CURB ASPHALT MACHINE OPERATOR; READY MIX SCALEMEN, PERMANENT, PORTABLE OR TEMPORARY PLANT; LABORERS HANDLING MASTERPLATE OR SIMILAR MATERIALS; LASER BEAM OPERATOR; CORING MACHINE OPERATOR; PLASTERER TENDERS; UNDERPINNING AND SHORING OF BUILDING; MATERIAL SELECTOR WHEN WORKING WITH FIREBRICK OR CASTABLE MATERIALS; FIRE WATCH; SIGNALING OF ALL POWER EQUIPMENT; TREE TOPPER OR TRIMMER; TUNNEL HELPERS IN FREE AIR; ROD AND CHAINMEN WITH LEAD SURVEYORS, SURVEYORS, AND TECHNICAL ENGINEERS; CONCRETE BURNING MACHINE OPERATOR$42.25$33.59$75.84LABO0751-003
eff. 06/01/2023
GLAZIER$51.55$44.09$95.64PAIN0027-002
eff. 06/01/2024
PAINTER: BRUSH, ROLLER, TAPER (HAND), PAPERHANGER, SWING STAGE, SCAFFOLD OVER 30FT., EPOXY, TOXIC MATERIAL, SANDBLAST, SPRAY, MACHINE TAPING, AND RESIDENTIAL WORK NOT TO EXCEED TWO FAMILIES PER STRUCTURE (IROQUOIS AND KANKAKEE COUNTIES)$41.00$27.80$68.80PAIN0467-002
eff. 06/01/2024
PLUMBER$55.40$38.27$93.67PLUM0130-004
eff. 06/01/2025
PIPEFITTER$55.00$38.62$93.62PLUM0597-006
eff. 06/01/2023
ROOFER$50.25$30.43$80.68ROOF0011-002
eff. 12/01/2024
SHEET METAL WORKER$56.35$38.65$95.00SHEE0265-003
eff. 06/01/2024
TRUCK DRIVER: 6 AXLES (KANKAKEE COUNTY)
Scope and notes

FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES

$45.37$0.25$45.62TEAM0179-008
eff. 06/01/2024
TRUCK DRIVER: 5 AXLES (KANKAKEE COUNTY)
Scope and notes

FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES

$45.17$0.25$45.42TEAM0179-008
eff. 06/01/2024
TRUCK DRIVER: 4 AXLES (KANKAKEE COUNTY)
Scope and notes

FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES

$44.97$0.25$45.22TEAM0179-008
eff. 06/01/2024
TRUCK DRIVER: 2 OR 3 AXLES (KANKAKEE COUNTY)
Scope and notes

FOOTNOTES: A. $1055.60 PER WEEK. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES

$44.82$0.25$45.07TEAM0179-008
eff. 06/01/2024

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 11/05/2026. We format and check the official text; the determination in your contract is what applies.