Illinois prevailing wage rates: IL20260009
Building, Heavy, Highway, Residential construction in Cook County.
IL20260009, modification 3, published 10/22/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
- changed OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER base $64.80 → $68.80 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
- changed OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH "A" FRAME. *-REQUIRES OILER base $63.50 → $67.50 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
- changed OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) base $60.95 → $64.95 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
- changed OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS base $59.20 → $63.20 (+$4.00), fringe $51.00 → $53.05 (+$2.05) New rates effective 06/01/2026 (previously 06/01/2025).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $41.27 | $32.76 | $74.03 | ASBE0017-001 eff. 06/01/2024 |
| FIRE STOP TECHNICIAN | $44.02 | $32.76 | $76.78 | ASBE0017-001 eff. 06/01/2024 |
| ASBESTOS WORKER/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 | $90.77 | ASBE0017-001 eff. 06/01/2024 |
| BOILERMAKER | $53.10 | $38.54 | $91.64 | BOIL0001-001 eff. 05/01/2024 |
| BRICKLAYER | $44.88 | $26.62 | $71.50 | BRIL0021-001 eff. 06/01/2016 |
| MARBLE MASON | $44.63 | $26.83 | $71.46 | BRIL0021-004 eff. 06/01/2017 |
| TILE SETTER | $45.49 | $25.72 | $71.21 | BRIL0021-006 eff. 06/01/2017 |
| TILE FINISHER | $38.56 | $22.10 | $60.66 | BRIL0021-006 eff. 06/01/2017 |
| TERRAZZO WORKER/SETTER | $44.38 | $25.84 | $70.22 | BRIL0021-006 eff. 06/01/2017 |
| MARBLE FINISHER | $33.95 | $26.03 | $59.98 | BRIL0021-009 eff. 06/01/2017 |
| POINTER, CLEANER AND CAULKER | $45.42 | $24.06 | $69.48 | BRIL0021-012 eff. 06/01/2017 |
| CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway) | $52.01 | $38.85 | $90.86 | CARP0555-001 eff. 06/01/2022 |
| CARPENTER: CARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Building) | $52.01 | $38.85 | $90.86 | CARP0555-001 eff. 06/01/2022 |
| CARPENTER (RESIDENTIAL CONSTRUCTION) | $45.61 | $35.31 | $80.92 | CARP0555-002 eff. 10/01/2023 |
| LINE CONSTRUCTION: GROUNDMAN | $48.44 | $29.09 | $77.53 | ELEC0009-003 eff. 05/26/2024 |
| LINE CONSTRUCTION (LINEMAN AND EQUIPMENT OPERATOR) | $62.10 | $37.29 | $99.39 | ELEC0009-003 eff. 05/26/2024 |
| ELECTRICIAN | $57.75 | $42.89 | $100.64 | ELEC0134-001 eff. 06/02/2025 |
| ELECTRICIAN:ELECTRICAL TECHNICIAN: THE WORK SHALL CONSIST OF THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOUND VISION PRODUCTION AND REPRODUCTION, TELEPHONE AND TELEPHONE INTERCONNECT, FACSIMILE, DATA APPATATUS, COAXIAL, FIBRE OPTIC AND WIRELESS EQUIPMENT, APPLIANCES AND SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF ANY NATURE, BUSINESS, DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND RESIDENTIAL PURPOSES, INCLUDING BUT NOT LIMITED TO COMMUNICATION AND TELEPHONE, ELECTRONIC AND SOUND EQUIPMENT, FIBRE OPTIC AND DATA COMMUNICATION SYSTEMS, AND THE PERFORMANCE OF ANY TASK DIRECTLY RELATED TO SUCH INSTALLATION OR SERVICE WHETHER AT NEW OR EXISTING SITES, SUCH TASKS TO INCLUDE THE PLACING OF WIRE AND CABLE AND ELECTRICAL POWER CONDUIT OR OTHER RACEWAY WORK WITHIN THE EQUIPMENT ROOM AND PULLING WIRE AND/OR CABLE THROUGH CONDUIT AND THE INSTALLATION OF ANY INCIDENTIAL CONDUIT | $51.14 | $30.55 | $81.69 | ELEC0134-003 eff. 06/02/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEE WITH LESS THAN 5 YEARS SERVICE | $70.68 | $38.44 | $109.12 | ELEV0002-001 eff. 01/01/2025 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $63.20 | $53.05 | $116.25 | ENGI0150-006 eff. 06/01/2026 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; BOBCAT (UP TO AND INCLUDING 3/4 CU YD) | $64.95 | $53.05 | $118.00 | ENGI0150-006 eff. 06/01/2026 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); WINCH TRUCKS WITH "A" FRAME. *-REQUIRES OILER | $67.50 | $53.05 | $120.55 | ENGI0150-006 eff. 06/01/2026 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PLACER*; CONCRETE PLACING BOOM; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; CRUSHER, STONE, ETC; DERRICKS; DERRICKS, TRAVELING*; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; GROUTING MACHINES; HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HOISTS, ELEVATORS, OUTSIDE TYPE RACK AND PINION AND SIMILAR MACHINES; HOISTS, ONE, TWO, AND THREE DRUM; HOISTS, TWO TUGGER ONE FLOOR; HYDRAULIC BACKHOES*; HYDRAULIC BOOM TRUCKS; HYDRAULIC VAC (AND SIMILAR EQUIPMENT);LOCOMOTIVES; MOTOR PATROL*; PILE DRIVERS AMD SKID RIG*; POST HOLE DIGGER; PRE- STRESS MACHINE; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; RAISED AND BLIND HOLE DRILL*; ROTO MILL GRINDER (36" AND OVER)*; ROTO MILL GRINDER (LESS THAN 36")*; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; STRADDLE BUGGIES; TOURNAPULL; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. *-REQUIRES OILER | $68.80 | $53.05 | $121.85 | ENGI0150-006 eff. 06/01/2026 |
| OPERATOR: POWER EQUIPMENT, GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING | $57.80 | $51.00 | $108.80 | ENGI0150-025 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE; WELDING MACHINES (2 THROUGH 5); WINCHES, 4 SMALL ELECTRIC DRILL WINCHES; | $59.00 | $51.00 | $110.00 | ENGI0150-025 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, OTHER THAN ASPHALT; SEED AND STRAW BLOWER; STEAM GENERATORS; STUMP MACHINE; WINCH TRUCKS WITH A-FRAME; WORK BOATS; TAMPER-FORM MOTOR DRIVEN | $60.40 | $51.00 | $111.40 | ENGI0150-025 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE; BURLAP MACHINE; BELTING MACHINE AND SEALING MACHINE; CONCRETE WHEEL SAW; CONVEYOR MUCK CARS (HAGLUND OR SIMILAR TYPE); DRILLS (ALL); FINISHING MACHINE-CONCRETE; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADER; HOIST- SEWER DRAGGING MACHINE; HYDRAULIC BOOM TRUCKS, ALL ATTACHMENTS; HYDRO-BLASTER (REQUIRES TWO OPERATORS); LASER SCREED*; LOCOMOTIVES, DINKY; OFF-ROAD HAULING UNITS (INCLUDING ARTICULATING); PUMP CRETES; SQUEEZE CRETES-SCREW TYPE PUMPS, GYPSUM BULKER AND PUMP; ROLLER ASPHALT; ROTARY SNOW PLOWS; ROTOTILLER, SEAMAN, SELF-PROPELLED; SCOOPS-TRACTOR DRAWN; SELF- PROPELLED COMPACTOR; SPREADER-CHIP-STONE; SCRAPER; SCRAPER-PRIME MOVER IN TANDEM REGARDLESS OF SIZE (ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR AND FOR EACH MACHINE ATTACHED THERETO ADD $1.00 TO GROUP 2 HOURLY RATE FOR EACH HOUR); TANK CAR HEATER; TRACTORS, PUSH, PULLING SHEEPS FOOT, DISC, OR COMPACTOR, ETC; TUG BOATS *REQUIRES OILER | $62.45 | $51.00 | $113.45 | ENGI0150-025 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX PLANT*, COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT*; CONCRETE PLACER*; CONCRETE TUBE FLOAT; CRANES, ALL ATTACHMENTS*; CRANES, HAMMERHEAD, LINDEN, PECO AND MACHINES OF A LIKE NATURE*; CRETER CRANE; CRUSHER, STONE; ALL DERRICKS; DERRICK BOATS; DERRICKS, TRAVELING*; DOWELL MACHINE WITH AIR COMPRESSOR ($1.00 ABOVE CLASS 1); DREDGES*; FIELD MECHANIC WELDER; FORMLESS CURB AND GUTTER MACHINE*; GRADALL AND MACHINES OF A LIKE NATURE*; GRADER, ELEVATING; GRADER, MOTOR GRADER, MOTOR PATROL, AUTO PATROL, FORM GRADER, PULL GRADER, SUBGRADER; GUARD RAIL POST DRIVER MOUNTED*; HOISTS, ONE, TWO, AND THREE DRUM; HYDRAULIC BACKHOES*; BACKHOES WITH SHEAR ATTACHMENTS*; MUCKING MACHINE; PILE DRIVERS AND SKID RIG*; PRE-STRESS MACHINE; PUMP CRETES DUAL RAM (REQUIRES FREQUENT LUBRICATION AND WATER)*; ROCK DRILL- CRAWLER OR SKID RIG*; ROCK DRILL TRUCK MOUNTED*; ROCK/ TRACK TAMPER; ROTO MILL GRINDER, (36" AND OVER)*; SLIP-FORM PAVER*; SOIL TEST DRILL RIG, TRUCK MOUNTED*; STRADDLE BUGGIES; HYDRAULIC TELESCOPING FORM (TUNNEL); TRACTOR DRAWN BELT LOADER*; TRACTOR DRAWN BELT LOADER WITH ATTACHED PUSHER (TWO ENGINEERS); TRACTOR WITH BOOM; TRACTAIRE WITH ATTACHMENT; TRAFFIC BARRIER TRANSFER MACHINE*; TRENCHING MACHINE; TRUCK MOUNTED CONCRETE PUMP WITH BOOM*; UNDERGROUND BORING AND/OR MINING MACHINES 5 FT IN DIAMETER AND OVER TUNNEL, ETC.*; WHEEL EXCAVATOR* & WIDENER (APSCO); RAISED OR BLIND HOE DRILL, TUNNEL & SHAFT* *REQUIRES OILER | $63.00 | $51.00 | $114.00 | ENGI0150-025 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL AND REINFORCING | $62.46 | $46.58 | $109.04 | IRON0001-026 eff. 06/01/2025 |
| IRONWORKER: SHEETER | $62.71 | $46.58 | $109.29 | IRON0001-026 eff. 06/01/2025 |
| IRONWORKER: ORNAMENTAL | $59.26 | $44.81 | $104.07 | IRON0063-001 eff. 06/01/2025 |
| IRONWORKER (FENCE ERECTOR) | $52.25 | $34.31 | $86.56 | IRON0063-002 eff. 06/01/2025 |
| IRONWORKER: MASTER RIGGERS | $56.75 | $47.38 | $104.13 | IRON0136-001 eff. 07/01/2025 |
| IRONWORKER (MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS) | $54.25 | $47.38 | $101.63 | IRON0136-001 eff. 07/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 12 DOSIMETER USE (ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS | $52.40 | $36.94 | $89.34 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY | $51.68 | $36.94 | $88.62 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 10 BOILER SETTER PLASTIC LABORERS | $51.85 | $36.94 | $88.79 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; & WELL POINT SYSTEM MEN | $51.75 | $36.94 | $88.69 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 8 FIREBRICK & BOILER LABORERS | $51.73 | $36.94 | $88.67 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 7 JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS; AND OTHER POWER TOOLS | $51.63 | $36.94 | $88.57 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 6 STONE DERRICKMEN & HANDLERS | $51.60 | $36.94 | $88.54 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 5 CEMENT GUN NOZZLE LABORERS (GUNITE); WINDLASS AND CAPSTAN PERSON | $51.55 | $36.94 | $88.49 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 4 CHIMNEY OVER 40 FT.; SCAFFOLD LABORERS | $51.50 | $36.94 | $88.44 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 3 CEMENT GUN | $51.48 | $36.94 | $88.42 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS | $51.40 | $36.94 | $88.34 | LABO0002-006 eff. 06/01/2025 |
| LABORER, BUILDING & RESIDENTIAL: GROUP 1 BUILDING LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING; AND OTHER UNCLASSIFIED LABORERS | $51.40 | $36.94 | $88.34 | LABO0002-006 eff. 06/01/2025 |
| LABORER, HEAVY & HIGHWAY: GROUP 5 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE | $51.40 | $36.94 | $88.34 | LABO0002-007 eff. 06/01/2025 |
| LABORER, HEAVY & HIGHWAY: GROUP 4 RAKERS, LUTEMEN; MACHINE-SCREWMEN; KETTLEMEN; MIXERMEN; DRUN-MEN; JACKHAMMERMEN (ASPHALT); PAINTMEN; MITRE BOX SPREADERS; LABORERS ON BIRCH, OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSOR; PAVING FORM SETTER; JACKHAMMERMEN (CONCRETE); POWER DRIVE CONCRETE SAWS; OTHER POWER TOOLS | $51.68 | $36.94 | $88.62 | LABO0002-007 eff. 06/01/2025 |
| LABORER, HEAVY & HIGHWAY: GROUP 3 CEMENT GUN NOZZLE (LABORERS), GUNITE | $51.55 | $36.94 | $88.49 | LABO0002-007 eff. 06/01/2025 |
| LABORER, HEAVY & HIGHWAY: GROUP 2 ASPHALT TAMPERS & SMOOTHERS; CEMENT GUN LABORERS | $51.48 | $36.94 | $88.42 | LABO0002-007 eff. 06/01/2025 |
| LABORER, HEAVY & HIGHWAY: GROUP 1 COMMON LABORER; TENDERS; MATERIAL EXPEDITOR (ASPHALT PLANT); STREET PAVING, GRADE SEPARATION, SIDEWALK, CURB & GUTTER, STRIPPERS & ALL LABORERS NOT OTHERWISE MENTIONED | $51.40 | $36.94 | $88.34 | LABO0002-007 eff. 06/01/2025 |
| LABORER, TUNNEL AND SEWER: GROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE LABORER CLASSIFICATIONS (SEWER) | $51.40 | $36.94 | $88.34 | LABO0002-008 eff. 06/01/2025 |
| LABORER, TUNNEL AND SEWER: GROUP 4 AIR TRAC DRILL OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE OPERATORS; MUCKING MACHINE OPERATOR; LASER BEAM OPERATOR; LINER PLATE AND RING SETTERS; SHIELD DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS; PIPE JACKING MACHINE OPERATOR; SKINNERS; MAINTENANCE TECHNICIAN | $51.75 | $36.94 | $88.69 | LABO0002-008 eff. 06/01/2025 |
| LABORER, TUNNEL AND SEWER: GROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS | $51.63 | $36.94 | $88.57 | LABO0002-008 eff. 06/01/2025 |
| LABORER, TUNNEL AND SEWER: GROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER | $51.53 | $36.94 | $88.47 | LABO0002-008 eff. 06/01/2025 |
| LABORER, TUNNEL AND SEWER: GROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS | $51.40 | $36.94 | $88.34 | LABO0002-008 eff. 06/01/2025 |
| LABORER, COMPRESSED AIR: 34 - AND OVER | $55.40 | $36.94 | $92.34 | LABO0002-008 eff. 06/01/2025 |
| LABORER, COMPRESSED AIR: 27 - 33 POUNDS | $54.40 | $36.94 | $91.34 | LABO0002-008 eff. 06/01/2025 |
| LABORER, COMPRESSED AIR: 21 - 26 POUNDS | $53.40 | $36.94 | $90.34 | LABO0002-008 eff. 06/01/2025 |
| LABORER, COMPRESSED AIR: 16 - 20 POUNDS | $52.90 | $36.94 | $89.84 | LABO0002-008 eff. 06/01/2025 |
| LABORER, COMPRESSED AIR: 0 - 15 POUNDS | $52.40 | $36.94 | $89.34 | LABO0002-008 eff. 06/01/2025 |
| LABORER, DEMOLITION/WRECKING: GROUP 3 ASBESTOS WORK WITH COMPLETE DEMOLITION/WRECKING OR STRIP OUT WORK | $51.40 | $36.94 | $88.34 | LABO0225-001 eff. 06/01/2025 |
| LABORER, DEMOLITION/WRECKING: GROUP 2 INTERIOR WRECKING AND STRIP OUT WORK | $51.40 | $36.94 | $88.34 | LABO0225-001 eff. 06/01/2025 |
| LABORER, DEMOLITION/WRECKING: GROUP 1 COMPLETE DEMOLITION | $46.40 | $36.94 | $83.34 | LABO0225-001 eff. 06/01/2025 |
| PAINTER (INCLUDING TAPER) | $53.05 | $33.91 | $86.96 | PAIN0014-001 eff. 06/01/2024 |
| GLAZIER | $51.55 | $44.09 | $95.64 | PAIN0027-001 eff. 06/01/2024 |
| PLASTERER | $42.25 | $26.65 | $68.90 | PLAS0005-002 eff. 07/01/2015 |
| CEMENT MASON/CONCRETE FINISHER | $53.10 | $43.80 | $96.90 | PLAS0502-001 eff. 06/01/2025 |
| PLUMBER | $60.50 | $39.02 | $99.52 | PLUM0130-001 eff. 06/01/2025 |
| PIPEFITTER | $55.00 | $38.62 | $93.62 | PLUM0597-002 eff. 06/01/2023 |
| ROOFER | $50.25 | $30.43 | $80.68 | ROOF0011-001 eff. 12/01/2024 |
| SPRINKLER FITTER | $63.25 | $36.50 | $99.75 | SFIL0281-001 eff. 07/01/2025 |
| SHEET METAL WORKER | $49.10 | $42.91 | $92.01 | SHEE0073-001 eff. 06/01/2022 |
| SHEET METAL WORKER (ALUMINUM GUTTER WORK) | $31.32 | $37.02 | $68.34 | SHEE0073-002 eff. 06/08/2018 |
TRUCK DRIVER: 6 AXLES (COOK COUNTY - HEAVY AND HIGHWAY)Scope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.20 | $30.27 | $76.47 | TEAM0731-001 eff. 06/01/2025 |
TRUCK DRIVER: 5 AXLES (COOK COUNTY - HEAVY AND HIGHWAY)Scope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $46.00 | $30.27 | $76.27 | TEAM0731-001 eff. 06/01/2025 |
TRUCK DRIVER: 4 AXLES (COOK COUNTY - HEAVY AND HIGHWAY)Scope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.80 | $30.27 | $76.07 | TEAM0731-001 eff. 06/01/2025 |
TRUCK DRIVER: 2 OR 3 AXLES (COOK COUNTY - HEAVY AND HIGHWAY)Scope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $448.80 PER WEEK PENSION: $562.80 PER WEEK | $45.55 | $30.27 | $75.82 | TEAM0731-001 eff. 06/01/2025 |
| TRAFFIC CONTROL DEVICE MONITOR (TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT) | $43.40 | $22.71 | $66.11 | TEAM0731-002 eff. 04/01/2025 |
TRUCK DRIVER: 6 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL)Scope and notesFOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.64 | $0.30 | $54.94 | TEAM0786-001 eff. 06/01/2025 |
TRUCK DRIVER: 5 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL)Scope and notesFOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.43 | $0.30 | $54.73 | TEAM0786-001 eff. 06/01/2025 |
TRUCK DRIVER: 4 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL)Scope and notesFOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $54.21 | $0.30 | $54.51 | TEAM0786-001 eff. 06/01/2025 |
TRUCK DRIVER: 2 & 3 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL)Scope and notesFOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $53.95 | $0.30 | $54.25 | TEAM0786-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 10/22/2026. We format and check the official text; the determination in your contract is what applies.