Illinois prevailing wage rates: IL20260041
Residential construction in McLean County.
IL20260041, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN (MC LEAN COUNTY (EXCEPT ANCHOR, BELLEFLOWER, CROPSEY, CHENEY GROVE TWPS)) | $30.56 | $16.37 | $46.93 | ELEC0197-006 eff. 01/01/2026 |
| ELECTRICIAN (MCLEAN COUNTY (CROPSEY, ANCHOR, CHENEY GROVE, AND BELLEFLOWER TWPS)) | $25.02 | $15.23 | $40.25 | ELEC0601-008 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; POWER SUBGRADER; STRAIGHT TRACTOR; TRAC AIR WITHOUT ATTAHMENTS; ROLLER: FIVE (5) TON AND UNDER ON EARTH OR GRAVEL; FORM GRADER; CRAWLER CRANE, SKID RIG OILERS & OILERS WITH CDL; CONVEYOR (1) OR (2); MIXER (3) BAG AND UNDER(STANDARD CAPACITY WITH SKIP); BULK CEMENT PLANT; OILER ON CENTRAL CONCRETE MIXING PLANT; STUD WELDER | $38.03 | $43.42 | $81.45 | ENGI0649-009 eff. 04/01/2025 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/DITCHING MACHINE OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT AND GRAVEL BATCHING PLANTS; MOBILE DRILLS (SOIL TESTING) AND SIMILAR TYPES; GURRIES AND SIMILAR TYPES; 1 AND 2 DRUM HOISTS (BUCK HOISTS AND SIMILAR TYPES); CHICAGO BOOM; HORIZONTAL BORING MACHINE & PIPE JACKING MACHINE; HYDRO BOOM; DEWATERING SYSTEM; STRAW BLOWER; HYDRO SEEDER; ASSISTANT HEAVY EQUIPMENT GREASER ON SPREAD; TRACTORS (TRACK- TYPE) WITHOUT POWER UNIT PULLING ROLLERS; ROLLERS ON ASPHALT - BRICK OR MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS; MULE PULLING ROLLERS; CEMENT STRIPPER; CEMENT FINISHING MACHINES & CMI TEXTURE & REEL CURING MACHINES; CEMENT FINISHING MACHINE; BARBER GREEN OR SIMILAR LOADERS; VIBRO TAMPER (ALL SIMILAR TYPES) SELF- PROPELLED; WINCH OR BOOM TRUCK; MECHANICAL BULL FLOATS; MIXERS OVER 3 BAGS; TRACTOR PULLING POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL; CLARY SCREED; TRUCK-TYPE OILERS WITH CDL; FIREMAN; SPRAY MACHINE ON PAVING; CURB MACHINES; TRUCK CRANE OILERS WITH CDL; OIL DISTRIBUTOR; TRUCK-MOUNTED SAWS; ALL ELEVATOR, PERMANENTLY INSTALLED USED FOR HOISTING OR LOWERING BUILDING MATERIAL; CONSTRUCTION ELEVATOR TEMPORARILY INSTALLED | $44.09 | $43.42 | $87.51 | ENGI0649-009 eff. 04/01/2025 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATOR; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI-BATCHERS); BLACKTOP PLANT OPERATORS AND PLANT ENGINEERS; 3-DRUM HOIST; DERRICKS; HYDRO CRANES (NON-LATTICE BOOM TRUCK CRANES HAVING THREE (3) AXLES OR LESS SHALL NOT REQUIRE AN OILER, A DOLLY SHALL COUNT AS AN AXLE); SHOVELS; SKIMMER SCOOPS; KOEHRING SCOOPER; DRAGLINES; BACKHOE; DERRICK BOATS; 360" SWING EXCAVATORS; LOCOMOTIVE CRANES; DREDGE (ALL TYPES); GUARD RAIL MACHINES ( MACHINES THAT CANNOT BE MOVED FORWARD FROM THE POST POUNDER SEAT REQUIRES AN OILER); MOTOR PATROL; POWER BLADES-DUMORE-ELEVATING AND SIMILAR TYPES; TOWER CRANES (CRAWLER-MOBILE) AND STATIONARY; CRANE-TYPE BACK-FILLER; DROTT YUMBO AND SIMILAR TYPES CONSIDERED AS CRANES; CAISSON RIGS; DOZER; TOURNADOZER; WORK BOATS; ROSS CARRIER; TUNNEL BORING MACHINE (SHALL REQUIRE AN OILER); CARTS/HAUL UNITS FOR A BORING MACHINE; HELICOPTER; TOURNAPULLS - ALL AND SIMILAR TYPES; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER; ROCK CRUSHER; HEAVY EQUIPMENT GREASER; CMI, CMI BELT PLACER, AUTO GRADE & 3 TRACK AND SIMILAR TYPES; SIDE BOOMS; MULTIPLE UNIT EARTH MOVERS: .75 CENTS PER HR., FOR EACH SCOOP OVER ONE (1); CRETER CRANE; TRENCH MACHINE; PUMPCRETE-BELT CRETE- SQUEEZE CRETES-SCREW-TYPE PUMPS AND GYPSUM, BULKER & PUMP- OPERATOR WILL CLEAN; FORMLESS FINISHING MACHINE; FLAHERTY SPREADER OR SIMILAR TYPES; SCREEE MAN ON LAYDOWN MACHINE; WHEEL TRACTORS (INDUSTRIAL OR FARM-TYPE W/DOZER-HOE-ENDLOADER OR OTHER ATTACHMENTS); FWD & SIMILAR TYPES; VERMEER CONCRETE SAW; SELF PROPELLED CONCRETE SAW; MATERIAL CRUSHER; SCREENING PLANTS; LASER SCREED; SPAN SAW; LULL & SIMILAR TYPES; OFF ROAD TRUCKS, ARTICULATING END DUMP VEHICLES & SIMILAR TYPES; CONCRETE & ALL RECYCLING MACHINES | $47.79 | $43.42 | $91.21 | ENGI0649-009 eff. 04/01/2025 |
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | PAIN0030-010 eff. 06/01/2023 |
| PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC (MCLEAN COUNTY) | $50.85 | $27.75 | $78.60 | PLUM0099-003 eff. 05/01/2025 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) (MCLEAN COUNTY) | $28.18 | $33.06 | $61.24 | SHEE0001-006 eff. 05/01/2024 |
| LABORER, UNSKILLED | $8.41 EO 13658 minimum $13.65 may apply | $0.00 | $8.41 | SUIL1998-001 eff. 03/17/1994 |
| CEMENT MASON/CONCRETE FINISHER | $10.90 EO 13658 minimum $13.65 may apply | $0.00 | $10.90 | SUIL1998-001 eff. 03/17/1994 |
| CARPENTER | $13.72 | $0.00 | $13.72 | SUIL1998-001 eff. 03/17/1994 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.