Iowa prevailing wage rates: IA20260001
Heavy, Highway construction in Scott County.
IA20260001, modification 3, published 10/29/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
- changed CEMENT MASON/CONCRETE FINISHER (SCOTT COUNTY) base $33.12 → $34.62 (+$1.50), fringe $28.39 → $28.94 (+$0.55) New rates effective 01/01/2026 (previously 01/01/2025).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER | $34.67 | $31.94 | $66.61 | CARP0004-006 eff. 01/01/2025 |
| PILEDRIVERMAN | $34.67 | $31.94 | $66.61 | CARP0004-006 eff. 01/01/2025 |
| MILLWRIGHT | $39.31 | $29.89 | $69.20 | CARP2158-003 eff. 06/01/2025 |
| CABLE SPLICER | $47.00 | $28.56 | $75.56 | ELEC0145-004 eff. 06/02/2025 |
| ELECTRICIAN | $46.00 | $28.56 | $74.56 | ELEC0145-004 eff. 06/02/2025 |
| POWER EQUIPMENT OPERATORS:, GROUP 1: CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT | $43.50 | $41.25 | $84.75 | ENGI0150-011 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS:, GROUP 2: ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES; CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING & PRIMING MACHINE; COMBINATION BACKHOE FRONT END LOADER; COMBINATION CONCRETE FINISHING MACHINE AND FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE SPREADER; CONCRETE WHEEL SAW (LARGE SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT, ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK (BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR OPERATING SCOOP OR SCRAPER OR WITH POWER ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER, MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER; GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER; HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER; HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE OR ARTICULATED); LOCOMOTIVE ENGINEER; MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE; PILE DRIVER; PIPE BENDING; PUG MILL; ROAD WIDENER-SHOULDER SPREADER; SCRAPER (SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.); TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40 H.P. & OVER); WORK BOAT | $41.50 | $41.25 | $82.75 | ENGI0150-011 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS:, GROUP 3: ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.) | $38.85 | $41.25 | $80.10 | ENGI0150-011 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATORS:, GROUP 4: AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP) | $37.80 | $41.25 | $79.05 | ENGI0150-011 eff. 06/01/2025 |
| IRONWORKER | $37.50 | $30.99 | $68.49 | IRON0111-001 eff. 07/01/2024 |
| LABORERS: GROUP 1 (SCOTT COUNTY) FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER (IN BONE YARD); LAYING OF SOD; MOVING AND/OR MAINTENANCE OF FLARES & BARRICADES; OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC OR MECHANICALLY POWERED TOOLS UNDER THE THE LABORERS' INCLUDING JACKHAMMER, TAMPER, AIR SPADE, AUGER, CONCRETE SAW, CHAIN SAW, UTILITY SAW, ROCK DRILL, VIBRATOR; MORTAR MIXER; POWER & HAND SAW (WHEN CLEARING TIMBER); GENERAL LABORER; MATERIAL HANDLER; FORM HANDLER; CONCRETE DUMPER; PUDDLER; EXPLOSIVES HANDLER; CENTER STRIP HANDLER & INSTALLER; PRIME MOVER OR ANY MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE BUGGY OR WHEELBARROW; SANDPOINT SETTER; ASPHALT KETTLEMAN; SHEETING HAMMER DRIVER; LAYING & JOINTING OF TELEPHONE CONDUIT; GAS DISTRIBUTION MAN; PIPE SETTER ON LATERAL, DRAIN TILE, CULVERT PIPE & STORM SEWER; CATCH BASIN LEAD; CATCH BASIN; MANHOLES; BATCH DUMPER; TANK CLEANER; COFFERDAM WORKER; BANKMAN ON FLOATING PLANT; JOINTMAN WITH PIPELAYER; BACK-UP MAN (CORKER, JOINT MAKER) WITH PIPE SETTER ON SEWER & WATER MAIN; BATTERBOARD MAN OR LASER OPERATOR ON SEWER & WATER MAIN; LABORER IN DITCH OR TUNNEL, ON SEWER OR WATER MAIN & TELEPHONE CONDUIT, CUTTERS; BURNERS; TORCHMAN; GRAVEL BOX MAN; ASPHALT PLANT; CONCRETE PLANT; DECK HAND; UNLOADING OF STEEL & REBAR; & WRECKING LABORERS | $33.77 | $23.60 | $57.37 | LABO0309-005 eff. 01/01/2024 |
| LABORERS: GROUP 2 (SCOTT COUNTY) ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRETE BURNING MACHINE OPERATOR; & CORING MACHINE OPERATOR; HAZARDOUS WASTE WORKER; ASBESTOS ABATEMENT WORKER | $34.27 | $23.60 | $57.87 | LABO0309-005 eff. 01/01/2024 |
| LABORERS: GROUP 3 (SCOTT COUNTY) CONCRETE SPECIALIST (ALL WORK RELATING TO BUT NOT LIMITED TO POURING, STRIKING OF & FINISHING ALL CONCRETE SURFACES) | $34.90 | $23.60 | $58.50 | LABO0309-005 eff. 01/01/2024 |
| PAINTERS: BRUSH & ROLLER | $31.32 | $19.05 | $50.37 | PAIN0081-001 eff. 05/01/2024 |
| PAINTERS: DRYWALL TAPER | $31.82 | $19.05 | $50.87 | PAIN0081-001 eff. 05/01/2024 |
| PAINTERS: ELEVATED TANKS, BRIDGES, STACKS FLAG POLES, MFG, VESSELS (INTERIOR AND EXTERIOR SURFACES | $33.32 | $19.05 | $52.37 | PAIN0081-001 eff. 05/01/2024 |
| PAINTERS: SIGN PAINTERS | $28.05 | $19.05 | $47.10 | PAIN0081-001 eff. 05/01/2024 |
| PAINTERS: SPRAY, STRUCTURAL STEEL AND SANDBLASTING, INDUSTRIAL | $31.82 | $19.05 | $50.87 | PAIN0081-001 eff. 05/01/2024 |
| CEMENT MASON/CONCRETE FINISHER (SCOTT COUNTY) | $34.62 | $28.94 | $63.56 | PLAS0018-020 eff. 01/01/2026 |
TRUCK DRIVERS: GROUP 1 (SCOTT COUNTY) DRIVERS ON 2 AXLE TRUCKS HAULING LESS THAN 9 TONS , AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS, WAREHOUSEMEN, GREASERS AND TIREMEN, PICK- UP-TRUCKS WHEN HAULING MATERIAL, TOOLS OR MEN TO AND FROM AND ON THE JOB SITE, AND FORKLIFTS UP TO 6,000 LB CAPACITYScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE: A. PENSION: $52.80 PER DAY) | $45.35 | $16.11 | $61.46 | TEAM0371-001 eff. 07/01/2025 |
| TRUCK DRIVERS: GROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FORKLIFTS OVER 6,000 LB CAPACITY, WINCH TRUCKS, FOUR AXLE COMBINATION UNITS, HYDROLIFT TRUCKS, VACTOR TRUCKS OR SIMIOLAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. F(ADDITIONAL FRINGE BENEFITS INCLUDE: A. PENSION: $52.80 PER DAY) | $45.93 | $16.11 | $62.04 | TEAM0371-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCKSScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE: A. PENSION: $52.80 PER DAY) | $46.25 | $16.11 | $62.36 | TEAM0371-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 4 (SCOTT COUNTY) OIL DISTRIBUTORS, LOWBOYSScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE: A. PENSION: $52.80 PER DAY) | $46.60 | $16.11 | $62.71 | TEAM0371-001 eff. 07/01/2025 |
TRUCK DRIVERS: GROUP 5 (SCOTT COUNTY) DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORKScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE: A. PENSION: $52.80 PER DAY) | $47.71 | $16.11 | $63.82 | TEAM0371-001 eff. 07/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 10/29/2026. We format and check the official text; the determination in your contract is what applies.