Kansas prevailing wage rates: KS20260006
Residential construction in Johnson, Wyandotte Counties.
KS20260006, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.) base $43.60 → $45.60 (+$2.00), fringe $33.52 → $35.47 (+$1.95) New rates effective 10/06/2025 (previously 10/07/2024).
- changed HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) base $43.60 → $45.60 (+$2.00), fringe $33.52 → $35.47 (+$1.95) New rates effective 10/06/2025 (previously 10/07/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.) | $45.60 | $35.47 | $81.07 | ASBE0027-001 eff. 10/06/2025 |
| HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.60 | $35.47 | $81.07 | ASBE0027-003 eff. 10/06/2025 |
| BOILERMAKER | $48.00 | $31.08 | $79.08 | BOIL0083-001 eff. 01/01/2025 |
| BRICKLAYER | $29.93 | $10.75 | $40.68 | BRKS0015-001 eff. 04/01/2016 |
| CARPENTER | $35.72 | $22.40 | $58.12 | CARP4088-004 eff. 05/01/2024 |
| ELECTRICIAN | $48.23 | $25.35 | $73.58 | ELEC0124-006 eff. 11/25/2024 |
ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | ELEV0012-002 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILERS DRIVER | $40.73 | $22.42 | $63.15 | ENGI0101-020 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATORS: GROUP 4: OILERS | $39.93 | $22.42 | $62.35 | ENGI0101-020 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATORS: GROUP 3 BOILERS - 1; CHIP SPREADER (FRONT MAN); CHURN DRILL OPERATOR; COMPRESSOR MAINTENANCE OPERATOR - 1; CONCRETE SAWS, SELF-PROPELLED; CONVEYOR OPERATOR; DISTRIBUTOR OPERATOR; FINISHING MACHINE OPERATOR; FIREMAN, RIG; FLOAT OPERATOR; FORM GRADER OPERATOR; PUMP; PUMP MAINTENANCE OPERATOR, OTHER THAN DREDGE; ROLLER OPERATOR, OTHER THAN HIGH TYPE ASPHALT; SCREENING AND WASHING PLANT OPERATOR; SELF-PROPELLED STREET BROOM OR SWEEPER; SIPHONS AND JETS; SUB-GRADING MACHINE OPERATOR; TANK CAR HEATER OPERATOR - COMBINATION BOILER AND BOOSTER; TRACTOR, 50 H.P. OR LESS, WITHOUT ATTACHMENTS; VIBRATING MACHINE OPERATOR, NOT HAND; WELDING MACHINE MAINTENANCE OPERATOR - 1 | $44.14 | $22.42 | $66.56 | ENGI0101-020 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATORS: GROUP 2 A-FRAME TRUCK, ASPHALT HOT MIX SILO; ASPHALT PLANT FIREMAN, DRUM OR BOILER; ASPHALT PLANT MIXER OPERATOR; ASPHALT PLANT MAN; ASPHALT ROLLER OPERATOR; BACK FILLER OPERATOR; CHIP SPREADER; CONCRETE BATCH PLANT, DRY-POWER OPERATED; CONCRETE MIXER OPERATOR, SKIP LOADER; CONCRETE PUMP OPERATOR; CRUSHER OPERATOR; ELEVATING GRADER; GREASER; HOISTING ENGINE - 1 DRUM; LATOURNEAU ROOTER; MULTIPLE COMPACTOR; PAVEMENT BREAKER, SELF- PROPELLED, OF THE HYDRAHAMMER OR SIMILAR TYPE; POWER SHIELD; PUG MILL OPERATOR; STUMP CUTTING MACHINE; TOWBOAT OPERATOR, TRACTOR OPERATOR OVER 50 H.P | $45.48 | $22.42 | $67.90 | ENGI0101-020 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT PAVER AND SPREADER; ASPHALT PLANT CONSOLE OPERATOR; AUTO GRADER; BACKHOE; BLADE OPERATOR, ALL TYPES; BOILERS-2; BOOSTER PUMP ON DREDGE; BORING MACHINE (TRUCK OR CRANE MOUNTED); BULLDOZER OPERATOR; CLAMSHELL OPERATOR; COMPRESSOR MAINTENANCE OPERATOR - 2; CONCRETE MIXER PAVER; CRANE OPERATOR; DERRICK OR DERRICK TRUCKS; DITCHING MACHINE; DRAGLINE OPERATOR; DREDGE ENGINEMAN; DREDGE OPERATOR; DRILLCAT WITH COMPRESSOR MOUNTED ON CAT; DRILLING OR BORING MACHINE, ROTARY, SELF-PROPELLED; HIGH LOADER - FORKLIFT; HOISTLINE ENGINE - 2 ACTIVE DRUMS; LOCOMOTIVE OPERATOR, STANDARD GUAGE; MECHANICS AND WELDERS; MAINTENANCE OPERATOR;MUCKING MACHINE; PILE DRIVER OPERATOR; PITMAN CRANE OPERATOR; PUMP - 2; PUSH CAT OP.; QUAD- TRACK; SCOOP OPERATOR - ALL TYPES; SCOOPS IN TANDEM; SELF- PROPELLED ROTARY DRILL (LEROY OR EQUAL NOT AIR TRAC); SHOVEL OPERATOR; SIDE DISCHARGE SPREADER; SIDEBOOM CATS; SKIMMER SCOOP OPERATOR; SLIP-FORM PAVER (CMI, REX, OR EQUAL); THROTTLE MAN; TRUCK CRANE; WELDING MACHINE MAINTENANCE OPERATOR - 2 | $46.29 | $22.42 | $68.71 | ENGI0101-020 eff. 04/01/2025 |
| IRONWORKER | $39.00 | $34.25 | $73.25 | IRON0010-008 eff. 04/01/2025 |
| LABORER | $18.70 | $11.01 | $29.71 | LABO1290-005 eff. 04/01/2025 |
| PAINTERS: SPRAY | $21.10 | $12.50 | $33.60 | PAIN0003-005 eff. 04/01/2019 |
| PAINTERS: DRYWALL FINISHER/TAPER | $21.10 | $12.50 | $33.60 | PAIN0003-005 eff. 04/01/2019 |
| PAINTERS: BRUSH, AND ROLLER | $21.10 | $12.50 | $33.60 | PAIN0003-005 eff. 04/01/2019 |
| GLAZIER | $36.95 | $15.01 | $51.96 | PAIN0558-001 eff. 04/01/2025 |
SIGN PAINTER A.Scope and notesPAID VACATION: EMPLOYED FOR 1 YEAR BUT LESS THAN 2 YEARS SHALL RECEIVE 1 WEEK VACATION WITH PAY; 2 YEARS OR MORE SHALL RECEIVE 2 WEEKS VACATION WITH PAY; 10 YEARS OF MORE SHALL RECEIVE 3 WEEKS OF VACATION WITH PAY | $17.70 | $4.30 | $22.00 | PAIN0820-002 eff. 06/01/1999 |
| FLOOR LAYER: CARPET | $31.05 | $13.25 | $44.30 | PAIN1179-002 eff. 10/01/2012 |
| CEMENT MASON/CONCRETE FINISHER | $40.13 | $20.50 | $60.63 | PLAS0518-005 eff. 04/01/2025 |
| PLASTERER | $37.92 | $18.83 | $56.75 | PLAS0518-027 eff. 04/01/2025 |
| PLUMBER | $54.28 | $23.79 | $78.07 | PLUM0008-006 eff. 06/01/2023 |
| PIPEFITTER | $55.56 | $25.80 | $81.36 | PLUM0533-002 eff. 06/01/2024 |
| ROOFER | $38.45 | $22.29 | $60.74 | ROOF0020-006 eff. 06/01/2024 |
| SHEET METAL WORKER | $52.18 | $27.15 | $79.33 | SHEE0002-006 eff. 07/01/2024 |
TRUCK DRIVERS: GROUP 4 MECHANICS. A.Scope and notesPAID VACATION: AN EMPLOYEE WHO HAS WORKED 1300 HRS. OR MORE FOR AN EMPLOYER DURING THE LAST FULL YEAR SHALL RECEIVE 1 WEEK VACATION WITH PAY FOR THAT YEAR | $41.09 | $15.85 | $56.94 | TEAM0541-006 eff. 04/01/2025 |
TRUCK DRIVERS: GROUP 3 SEMI-TRUCK DRIVER; STEEL TRUCK DRIVER; DISTRIBUTOR TRUCK DRIVERS AND OPERATOR; OILERS AND GREASERS. A.Scope and notesPAID VACATION: AN EMPLOYEE WHO HAS WORKED 1300 HRS. OR MORE FOR AN EMPLOYER DURING THE LAST FULL YEAR SHALL RECEIVE 1 WEEK VACATION WITH PAY FOR THAT YEAR | $39.89 | $15.85 | $55.74 | TEAM0541-006 eff. 04/01/2025 |
TRUCK DRIVERS: GROUP 2 DOUBLE BOTTOM UNITS (20 TONS CAPACITY AND OVER); FORK TRUCKS; HEAVY EXCAVATING (DUMPSTERS, ETC.); HEAVY HAULING, A-FRAME AND WINCH FORK TRUCKS; HYDRAULICALLY OPERATED AERIAL LIFT; HYDRO LIFT TRUCKS; STRADDLE TRUCKS; WHEEL TRACTORS. A.Scope and notesPAID VACATION: AN EMPLOYEE WHO HAS WORKED 1300 HRS. OR MORE FOR AN EMPLOYER DURING THE LAST FULL YEAR SHALL RECEIVE 1 WEEK VACATION WITH PAY FOR THAT YEAR | $39.89 | $15.85 | $55.74 | TEAM0541-006 eff. 04/01/2025 |
TRUCK DRIVERS: GROUP 1 FLAT BEDS; PICK-UP; DUMP TRUCKS UNDER 10 YDS.; DUMP TRUCKS 10 YDS. AND OVER. A.Scope and notesPAID VACATION: AN EMPLOYEE WHO HAS WORKED 1300 HRS. OR MORE FOR AN EMPLOYER DURING THE LAST FULL YEAR SHALL RECEIVE 1 WEEK VACATION WITH PAY FOR THAT YEAR | $39.89 | $15.85 | $55.74 | TEAM0541-006 eff. 04/01/2025 |
TRAFFIC CONTROL SERVICE DRIVER A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY AND 2 PERSONAL DAYS | $14.15 | $2.44 | $16.59 | TEAM0541-008 eff. 03/25/2000 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.