Kansas prevailing wage rates: KS20260057
Building construction in Sedgwick County.
KS20260057, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) base $43.60 → $45.60 (+$2.00), fringe $33.52 → $35.47 (+$1.95) New rates effective 10/06/2025 (previously 10/07/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 | ASBE0027-005 eff. 10/06/2025 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 | BRKS0015-014 eff. 06/01/2025 |
| TILE SETTER | $30.18 | $13.52 | $43.70 | BRKS0015-016 eff. 06/01/2025 |
| ELECTRICIAN (INCLUDING ALARM INSTALLATION) | $40.64 | $18.29 | $58.93 | ELEC0271-002 eff. 05/31/2025 |
ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | ELEV0012-004 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 | ENGI0101-040 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 | ENGI0101-040 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 | ENGI0101-040 eff. 04/01/2025 |
| IRONWORKER: ORNAMENTAL/REINFORCING | $39.00 | $34.25 | $73.25 | IRON0010-018 eff. 04/01/2025 |
| IRONWORKER, STRUCTURAL | $27.49 | $13.63 | $41.12 | IRON0024-005 eff. 06/01/2023 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 | $56.15 | PAIN2012-008 eff. 04/01/2025 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 | PLUM0441-014 eff. 06/30/2025 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $55.56 | $25.80 | $81.36 | PLUM0533-012 eff. 06/01/2024 |
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 | SFKS0669-002 eff. 04/01/2025 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $19.63 | $5.26 | $24.89 | SUKS2015-026 eff. 07/08/2015 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $22.25 | $4.42 | $26.67 | SUKS2015-026 eff. 07/08/2015 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.84 | $6.82 | $31.66 | SUKS2015-026 eff. 07/08/2015 |
| ROOFER | $13.33 EO 13658 minimum $13.65 may apply | $1.66 | $14.99 | SUKS2015-026 eff. 07/08/2015 |
| PLUMBER | $23.12 | $6.86 | $29.98 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: ROLLER | $33.78 | $13.64 | $47.42 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: GRADER/BLADE | $29.58 | $11.51 | $41.09 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: FORKLIFT | $34.83 | $14.16 | $48.99 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: CRANE | $33.19 | $14.16 | $47.35 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 | SUKS2015-026 eff. 07/08/2015 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.50 | $3.49 | $23.99 | SUKS2015-026 eff. 07/08/2015 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.55 EO 13658 minimum $13.65 may apply | $1.67 | $13.22 | SUKS2015-026 eff. 07/08/2015 |
| LABORER: MASON TENDER - BRICK | $19.91 | $6.88 | $26.79 | SUKS2015-026 eff. 07/08/2015 |
| LABORER: COMMON OR GENERAL | $13.16 EO 13658 minimum $13.65 may apply | $1.44 | $14.60 | SUKS2015-026 eff. 07/08/2015 |
| CEMENT MASON/CONCRETE FINISHER | $17.17 | $2.23 | $19.40 | SUKS2015-026 eff. 07/08/2015 |
| CARPENTER | $17.62 | $1.93 | $19.55 | SUKS2015-026 eff. 07/08/2015 |
| BRICKLAYER, EXCLUDES TILE FINISHER AND TILE SETTER | $21.85 | $3.04 | $24.89 | SUKS2015-026 eff. 07/08/2015 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 | TEAM0541-010 eff. 04/01/2025 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 | TEAM0541-011 eff. 04/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.