Kansas prevailing wage rates: KS20260143
Highway construction in Miami County.
KS20260143, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed LABORER: Pipelayer was $32.12 + $14.73 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (EXCLUDES FORM WORK) | $43.28 | $21.25 | $64.53 | CARP0315-005 eff. 05/01/2023 |
| POWER EQUIPMENT OPERATOR: ROTO MILL | $40.17 | $22.29 | $62.46 | ENGI0101-023 eff. 04/01/2025 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $40.17 | $22.29 | $62.46 | ENGI0101-023 eff. 04/01/2025 |
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 | IRON0010-009 eff. 04/01/2025 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $37.45 | $15.87 | $53.32 | LABO0663-017 eff. 04/01/2025 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $37.45 | $15.87 | $53.32 | LABO1290-002 eff. 04/01/2025 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 | SUKS2019-082 eff. 05/09/2019 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $27.96 | $14.05 | $42.01 | SUKS2019-082 eff. 05/09/2019 |
| TRUCK DRIVER: DUMP AND TANDEM | $29.04 | $12.45 | $41.49 | SUKS2019-082 eff. 05/09/2019 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $17.10 | $0.00 | $17.10 | SUKS2019-082 eff. 05/09/2019 |
| TRAFFIC CONTROL: SERVICE DRIVER | $18.12 | $7.46 | $25.58 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: TRACTOR | $24.28 | $0.00 | $24.28 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: SCREED | $17.38 | $3.52 | $20.90 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: ROLLER | $29.00 | $11.40 | $40.40 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.88 | $15.53 | $48.41 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: MECHANIC | $32.25 | $15.31 | $47.56 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: LOADER | $32.46 | $14.14 | $46.60 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: GRADER/BLADE | $29.66 | $12.55 | $42.21 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: CRANE | $30.38 | $11.08 | $41.46 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: CONCRETE SAW | $33.87 | $15.16 | $49.03 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: BULLDOZER | $28.15 | $11.65 | $39.80 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $33.35 | $14.10 | $47.45 | SUKS2019-082 eff. 05/09/2019 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $35.23 | $15.53 | $50.76 | SUKS2019-082 eff. 05/09/2019 |
| LINE CONSTRUCTION: LINEMAN | $41.52 | $17.56 | $59.08 | SUKS2019-082 eff. 05/09/2019 |
| LINE CONSTRUCTION: GROUNDMAN | $26.76 | $12.71 | $39.47 | SUKS2019-082 eff. 05/09/2019 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $32.15 | $15.06 | $47.21 | SUKS2019-082 eff. 05/09/2019 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 | SUKS2019-082 eff. 05/09/2019 |
| LABORER: FLAGGER | $13.20 EO 13658 minimum $13.65 may apply | $0.00 | $13.20 | SUKS2019-082 eff. 05/09/2019 |
| LABORER: COMMON OR GENERAL | $25.56 | $12.46 | $38.02 | SUKS2019-082 eff. 05/09/2019 |
| IRONWORKER, REINFORCING | $26.94 | $27.60 | $54.54 | SUKS2019-082 eff. 05/09/2019 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 | SUKS2019-082 eff. 05/09/2019 |
| CEMENT MASON/CONCRETE FINISHER | $28.92 | $15.80 | $44.72 | SUKS2019-082 eff. 05/09/2019 |
| CARPENTER (FORM WORK ONLY) | $29.45 | $14.08 | $43.53 | SUKS2019-082 eff. 05/09/2019 |
| TRUCK DRIVER: WATER TRUCK | $38.04 | $15.85 | $53.89 | TEAM0541-013 eff. 04/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.