Maryland prevailing wage rates: MD20260037

Heavy, Highway construction in Dorchester County.

MD20260037, modification 2, published 06/04/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

  • changed LABORER - ASPHALT RAKER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - COMMON base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - CONCRETE PUDDLER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - CONCRETE TENDER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - CONCRETE VIBRATOR base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - DENSITY GAUGE base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - FIREPROOFER - MIXER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - FLAGGER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - GRADE CHECKER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - HAND ROLLER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - JACKHAMMER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - LANDSCAPING base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - LAYOUT base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - LUTEMAN base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - MORTAR MIXER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - PLASTERER - HANDLER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed LABORER - TAMPER base $22.51 → $22.69 (+$0.18), fringe $2.85 → $3.04 (+$0.19) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR base $26.00 → $22.00 (−$4.00), fringe $7.54 → $1.62 (−$5.92) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - CRANE base $41.00 → $42.00 (+$1.00), fringe $18.10 → $19.10 (+$1.00) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - EXCAVATOR base $25.00 → $26.70 (+$1.70), fringe $1.74 → $1.80 (+$0.06) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - GRADALL base $29.90 → $33.00 (+$3.10), fringe $2.34 → $2.68 (+$0.34) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - LOADER base $23.00 → $34.00 (+$11.00), fringe $1.35 → $14.05 (+$12.70) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - MILLING MACHINE base $30.00 → $33.00 (+$3.00), fringe $7.59 → $8.80 (+$1.21) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - PAVER base $22.67 → $26.00 (+$3.33), fringe $4.14 → $7.28 (+$3.14) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT base $24.83 → $29.75 (+$4.92), fringe $4.74 → $5.77 (+$1.03) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - ROLLER - EARTH base $21.00 → $26.00 (+$5.00), fringe $0.98 → $2.25 (+$1.27) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - SCREED base $30.75 → $31.00 (+$0.25), fringe $8.12 → $7.78 (−$0.34) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat) base $22.75 → $21.00 (−$1.75), fringe $5.12 → $1.46 (−$3.66) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed POWER EQUIPMENT OPERATOR-VACUUM TRUCK base $37.50 → $38.60 (+$1.10), fringe $14.85 → $15.75 (+$0.90) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
  • changed TRUCK DRIVER - DUMP base $23.77 → $24.51 (+$0.74), fringe $4.99 → $4.56 (−$0.43) Now listed under rate group SAMD2025-001, effective 12/11/2025 (was SAMD2024-010, effective 05/08/2025).
12 classifications added, 7 removed or reworded
  • removed CARPENTER was $27.00 + $6.97 fringe
  • added LABORER - AIR TOOL OPERATOR $31.57 + $8.81 fringe
  • added LABORER - ASPHALT PAVER $31.57 + $8.81 fringe
  • added LABORER - BLASTER - DYNAMITE $31.57 + $8.81 fringe
  • added LABORER - BURNER $31.57 + $8.81 fringe
  • added LABORER - CONCRETE SURFACER $31.57 + $8.81 fringe
  • added LABORER - HAZARDOUS MATERIAL HANDLER $31.57 + $8.81 fringe
  • added LABORER - MASON TENDER $31.57 + $8.81 fringe
  • added LABORER - PIPELAYER $31.57 + $8.81 fringe
  • added LABORER - SCAFFOLD BUILDER $31.57 + $8.81 fringe
  • added POWER EQUIPMENT OPERATOR - DRILL - RIG $34.00 + $14.05 fringe
  • added POWER EQUIPMENT OPERATOR - FORKLIFT $31.04 + $14.05 fringe
  • added POWER EQUIPMENT OPERATOR - MECHANIC $35.00 + $14.05 fringe
  • removed POWER EQUIPMENT OPERATOR (BULLDOZER) was $20.00 + $0.76 fringe
  • removed POWER EQUIPMENT OPERATOR: BACKHOE was $24.00 + $1.85 fringe
  • removed TRUCK DRIVER (DUMP - ARTICULATING) was $20.00 + $0.76 fringe
  • removed TRUCK DRIVER (LOWBOY) was $29.68 + $10.51 fringe
  • removed TRUCK DRIVER (TACK/TAR) was $28.69 + $10.51 fringe
  • removed TRUCK DRIVER (WATER) was $29.39 + $10.51 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MD20260037 wage rates
ClassificationBaseFringeTotalRate ID
LABORER - AIR TOOL OPERATOR$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - ASPHALT PAVER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - ASPHALT RAKER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - BLASTER - DYNAMITE$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - BURNER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - COMMON$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - CONCRETE PUDDLER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - CONCRETE SURFACER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - CONCRETE TENDER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - CONCRETE VIBRATOR$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - DENSITY GAUGE$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - FIREPROOFER - MIXER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - FLAGGER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - GRADE CHECKER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - HAND ROLLER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - HAZARDOUS MATERIAL HANDLER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - JACKHAMMER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - LANDSCAPING$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - LAYOUT$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - LUTEMAN$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - MASON TENDER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - MORTAR MIXER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - PIPELAYER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - PLASTERER - HANDLER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
LABORER - SCAFFOLD BUILDER$31.57$8.81$40.38SAMD2025-001
eff. 12/11/2025
LABORER - TAMPER$22.69$3.04$25.73SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR$22.00$1.62$23.62SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - CRANE$42.00$19.10$61.10SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - DRILL - RIG$34.00$14.05$48.05SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - EXCAVATOR$26.70$1.80$28.50SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - FORKLIFT$31.04$14.05$45.09SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - GRADALL$33.00$2.68$35.68SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - LOADER$34.00$14.05$48.05SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - MECHANIC$35.00$14.05$49.05SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - MILLING MACHINE$33.00$8.80$41.80SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - PAVER$26.00$7.28$33.28SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT$29.75$5.77$35.52SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - ROLLER - EARTH$26.00$2.25$28.25SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - SCREED$31.00$7.78$38.78SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)$21.00$1.46$22.46SAMD2025-001
eff. 12/11/2025
POWER EQUIPMENT OPERATOR-VACUUM TRUCK$38.60$15.75$54.35SAMD2025-001
eff. 12/11/2025
TRUCK DRIVER - DUMP$24.51$4.56$29.07SAMD2025-001
eff. 12/11/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 06/04/2026. We format and check the official text; the determination in your contract is what applies.