Maryland prevailing wage rates: MD20260074
Heavy, Highway construction in Queen Anne's County.
MD20260074, modification 3, published 09/28/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
No existing rate changed amount.
5 classifications added, 0 removed or reworded
- added CARPENTER $36.86 + $25.24 fringe
- added CEMENT MASON $30.69 + $13.84 fringe
- added POWER EQUIPMENT OPERATOR - FORKLIFT $34.01 + $14.64 fringe
- added SHEETMETAL WORKER (including metal roofing) $44.87 + $23.12 fringe
- added TILE & TERRAZZO MECHANIC $36.34 + $4.92 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER | $36.86 | $25.24 | $62.10 | SAMD2025-001 eff. 12/11/2025 |
| CEMENT MASON | $30.69 | $13.84 | $44.53 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - AIR TOOL OPERATOR | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - ASPHALT PAVER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - ASPHALT RAKER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - BLASTER - DYNAMITE | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - BURNER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - COMMON | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - CONCRETE PUDDLER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - CONCRETE SURFACER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - CONCRETE TENDER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - CONCRETE VIBRATOR | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - DENSITY GAUGE | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - FIREPROOFER - MIXER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - FLAGGER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - GRADE CHECKER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - HAND ROLLER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - HAZARDOUS MATERIAL HANDLER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - JACKHAMMER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - LANDSCAPING | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - LAYOUT | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - LUTEMAN | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - MASON TENDER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - MORTAR MIXER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - PIPELAYER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - PLASTERER - HANDLER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - SCAFFOLD BUILDER | $24.00 | $2.33 | $26.33 | SAMD2025-001 eff. 12/11/2025 |
| LABORER - TAMPER | $21.59 | $2.64 | $24.23 | SAMD2025-001 eff. 12/11/2025 |
| MILLWRIGHT | $39.50 | $17.52 | $57.02 | SAMD2025-001 eff. 12/11/2025 |
| PAINTER - BRIDGE | $45.00 | $17.01 | $62.01 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR | $28.00 | $5.42 | $33.42 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - BACKHOE | $31.95 | $2.58 | $34.53 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - BULLDOZER | $25.00 | $3.88 | $28.88 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - CRANE | $42.00 | $19.10 | $61.10 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - EXCAVATOR | $30.74 | $5.44 | $36.18 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - FORKLIFT | $34.01 | $14.64 | $48.65 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - GRADALL | $27.00 | $4.54 | $31.54 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - GRADER | $28.98 | $1.90 | $30.88 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - LOADER | $28.20 | $8.51 | $36.71 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - MECHANIC | $35.03 | $6.12 | $41.15 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - MILLING MACHINE | $33.00 | $8.74 | $41.74 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - PAVER | $21.67 | $2.81 | $24.48 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT | $24.25 | $2.36 | $26.61 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - ROLLER - EARTH | $21.70 | $3.85 | $25.55 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - SCRAPER | $22.00 | $0.74 | $22.74 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - SCREED | $28.67 | $7.59 | $36.26 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat) | $24.11 | $5.34 | $29.45 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR- TRANSFER MACHINE OPERATOR | $21.00 | $0.51 | $21.51 | SAMD2025-001 eff. 12/11/2025 |
| POWER EQUIPMENT OPERATOR-VACUUM TRUCK | $38.60 | $15.75 | $54.35 | SAMD2025-001 eff. 12/11/2025 |
| SHEETMETAL WORKER (including metal roofing) | $44.87 | $23.12 | $67.99 | SAMD2025-001 eff. 12/11/2025 |
| TILE & TERRAZZO MECHANIC | $36.34 | $4.92 | $41.26 | SAMD2025-001 eff. 12/11/2025 |
| TRUCK DRIVER - DUMP | $23.67 | $4.85 | $28.52 | SAMD2025-001 eff. 12/11/2025 |
| TRUCK DRIVER - DUMP - ARTICULATING | $23.75 | $2.88 | $26.63 | SAMD2025-001 eff. 12/11/2025 |
| TRUCK DRIVER - WATER | $24.94 | $7.58 | $32.52 | SAMD2025-001 eff. 12/11/2025 |
| UNDERGROUND GAS MECHANIC | $27.05 | $7.70 | $34.75 | SAMD2025-001 eff. 12/11/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 09/28/2026. We format and check the official text; the determination in your contract is what applies.