PrevailCrew

Massachusetts prevailing wage rates: MA20260008

Heavy construction in Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk Counties.

MA20260008, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

17 changes are not listed because we could not check them against both modifications. See the official determination.

No existing rate changed amount.

9 classifications added, 31 removed or reworded
  • removed IRONWORKER was $57.87 + $37.67 fringe
  • removed IRONWORKER was $53.46 + $37.67 fringe
  • added IRONWORKER: (AREA 1) $57.87 + $37.67 fringe
  • added IRONWORKER: (AREA 2) $53.46 + $37.67 fringe
  • removed Laborers: (FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR): GROUP 1 was $50.50 + $29.70 fringe
  • removed Laborers: (FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR): GROUP 2 was $50.50 + $29.70 fringe
  • removed Laborers: (OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): OPEN AIR CASSON, UNDERPINNING WORK & BORING CREW: Bottom man was $47.35 + $29.70 fringe
  • removed Laborers: (OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): OPEN AIR CASSON, UNDERPINNING WORK & BORING CREW: Laborers; Top man was $46.20 + $29.70 fringe
  • removed Laborers: (OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): TEST BORING & WELL DRILLING: Driller was $50.20 + $29.70 fringe
  • removed Laborers: (OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): TEST BORING & WELL DRILLING: Laborer was $46.20 + $29.70 fringe
  • removed Laborers: (TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR): GROUP 1 was $47.95 + $29.70 fringe
  • removed Laborers: (TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR): GROUP 2 was $58.43 + $29.70 fringe
  • removed Laborers: (TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR): GROUP 3 was $58.43 + $29.70 fringe
  • removed Laborers: (TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR): GROUP 4 was $58.43 + $29.70 fringe
  • removed Laborers: (TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR): GROUP 5 was $58.43 + $29.70 fringe
  • removed Laborers: CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing): GROUP 1 was $50.50 + $29.70 fringe
  • removed Laborers: CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing): GROUP 2 was $50.50 + $29.70 fringe
  • added LABORERS: GROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) $50.50 + $29.70 fringe
  • added LABORERS: GROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) $50.50 + $29.70 fringe
  • removed Laborers: ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR: GROUP 1 was $47.95 + $29.70 fringe
  • removed Laborers: ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR: GROUP 2 was $50.50 + $29.70 fringe
  • removed Laborers: ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR: GROUP 3 was $50.50 + $29.70 fringe
  • removed Laborers: ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR: GROUP 4 was $50.50 + $29.70 fringe
  • removed Laborers: ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR: GROUP 5 was $52.50 + $29.70 fringe
  • added PAINTER BRIDGE (BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH (Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES)) $56.76 + $36.00 fringe
  • added PAINTER BRIDGE (MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline)) $56.76 + $36.00 fringe
  • added PAINTER BRUSH, TAPER (NEw Construction) $46.26 + $36.00 fringe
  • added PAINTER BRUSH, TAPER (Repaint) $44.32 + $36.00 fringe
  • added PAINTER SPAY NEW CONSTRUCTION: SANDBLAST $47.66 + $36.00 fringe
  • removed PAINTER: NEW CONSTRUCTION: Bridge was $50.36 + $30.25 fringe
  • removed PAINTER: NEW CONSTRUCTION: Brush, Taper was $39.86 + $30.25 fringe
  • removed PAINTER: NEW CONSTRUCTION: Brush, Taper was $46.26 + $36.00 fringe
  • removed PAINTER: NEW CONSTRUCTION: Spay, Sandblast was $47.66 + $36.00 fringe
  • removed PAINTER: NEW CONSTRUCTION: Spray, Sandblast was $41.26 + $30.25 fringe
  • removed PAINTER: NEW CONSTRUCTION: Spray, Sandblast was $47.05 + $30.25 fringe
  • removed PAINTER: REPAINT: Bridge was $56.76 + $36.00 fringe
  • removed PAINTER: REPAINT: Bridge was $56.76 + $36.00 fringe
  • removed PAINTER: REPAINT: Brush, Taper was $37.92 + $30.25 fringe
  • removed PAINTER: REPAINT: Brush, Taper was $44.32 + $36.00 fringe
  • removed PAINTER: REPAINT: Spray, Sandblast was $39.32 + $30.25 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MA20260008 wage rates
ClassificationBaseFringeTotalRate ID
BOILERMAKER$50.62$28.82$79.44BOIL0029-001
eff. 01/01/2025
BRICKLAYER/CEMENT MASON (FOXBORO CHAPTER BRISTOL (ATTLEBORO, BERKLEY, DIGHTON, MANSFIELD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, TAUNTON); NORFOLK, (BELLINGHAM, CANTON, DEDHAM, FOXBORO, FRANKLIN, NORFOLK, NORWOOD, PLAINVILLE, SHARON, WALPOLE, WESTRWOOD, WRENTHAM); AND PLYMOUTH (LAKEVILLE))$60.35$34.40$94.75BRMA0001-011
eff. 02/01/2023
BRICKLAYER (LOWELL CHAPTER MIDDLESEX (ACTON, ASHBY, AYER, BEDFORD, BILLERICA, BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTABALE, FT DEVENS, GROTON, LITTLETON, LOWELL, NORTH ACTON, PEPPERELL, SHIRLEY, SOUTH ACTON, TEWKSBURY, TOWNSEND, TYNGSBORO, WEST ACTON, WESTFORD, WILMINGTON))$58.21$33.71$91.92BRMA0001-012
eff. 02/01/2023
BRICKLAYER (LOWELL CHAPTER MIDDLESEX (ASHLAND, FRAMINGHAM, HOLLISTON, HOPKINTON, HUDSON, MAYNARD, NATICK, SHERBVORN, STOW); AND NORFOLK (MEDFIELD, MEDWAY, MILLIS))$62.40$34.40$96.80BRMA0001-013
eff. 08/01/2023
TERRAZZO FINISHER$63.44$37.33$100.77BRMA0003-001
eff. 08/01/2024
MARBLE, TILE & TERRAZZO WORKERS$64.52$37.51$102.03BRMA0003-001
eff. 08/01/2024
MARBLE & TILE FINISHER$49.32$35.26$84.58BRMA0003-001
eff. 08/01/2024
BRICKLAYER (BOSTON CHAPTER MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, SOMERVILLE); NORFOLK (BROOKLINE, MILTON); AND SUFFOLK)$64.50$37.54$102.04BRMA0003-003
eff. 08/01/2024
BRICKLAYER/CEMENT MASON (LYNN CHAPTER ESSEX (AMESBURY, ANDOVER, BEVERLY, BOXFORD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEN, MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALISBURY, SALEM, SAUGUS, SWAMPSCOTT, TOPSFIELD, WAKEFIELD, WENHAM, WEST NEWBURY); AND MIDDLESEX (NORTH READING, READING, WAKEFIELD))$64.50$37.54$102.04BRMA0003-011
eff. 08/01/2024
BRICKLAYER (WALTHAM CHAPTER - MIDDLESEX (BELMONT, BURLINGTON, CONCORD, LEXINGTON, LINCOLN, STONEHAM, SUDBURY, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN))$64.50$37.54$102.04BRMA0003-012
eff. 08/01/2024
BRICKLAYER/CEMENT MASON (QUINCY CHAPTER PLYMOUTH COUNTY (ABINGTON, BRIDGEWATER, BROCKTON, CARVER, DUXBURY, EAST BRIDGEWATER, HALIFAX, HANOVER, HANSON, HINGHAM, HULL, KINGSTON, MARSHFIELD, MIDDLEBORO, NORWELL, PEMBROKE, PLYMOUTH, ROCKLAND, SCITUATE, WEST BRIDGEWATER, WHITMAN))$64.50$37.54$102.04BRMA0003-014
eff. 08/01/2024
BRICKLAYER/CEMENT MASON (NEW BEDFORD CHAPTER BARNSTABLE; BRISTOL (ACUSHNET, DARMOUTH, FAIRHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD, SOMERSET, SWANSEA, WESTPORT); DUKES; NANTUCKET; PLYMOUTH (MARION, MATTAPOISETT, ROCHESTER, WAREHAM))$64.50$37.54$102.04BRMA0003-025
eff. 08/01/2024
BRICKLAYER, PLASTERER (NEWTON CHAPTER MIDDLESEX (NEWTON); NORFOLK (DOVER, NEEDHAM, WELLESLEY))$64.50$37.54$102.04BRMA0003-033
eff. 08/01/2024
PILEDRIVERMAN (ALL OF SUFFOLK COUNTY; AND THOSE AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, AND PLYMOUTH COUNTIES SITUATED INSIDE BOSTON BELTWAY (I-495) AND NORTH OF CAPE COD CANAL. ALL OF DUKES AND NANTUCKET COUNTIES)$55.79$35.47$91.26CARP0056-001
eff. 08/01/2024
PILEDRIVERMAN (THE AREAS OF BARNSTABLE, BRISTOL, PLYMOUTH, AND NORFOLK COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495) AND SOUTH OF CAPE COD CANAL)$51.97$35.47$87.44CARP0056-002
eff. 08/01/2024
PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495))$49.19$35.47$84.66CARP0056-003
eff. 08/01/2024
DIVER TENDER$61.70$35.47$97.17CARP0056-004
eff. 08/01/2024
DIVER$78.11$35.47$113.58CARP0056-004
eff. 08/01/2024
CARPENTER (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE, DEDHAM, MILTON); AND SUFFOLK COUNTIES)$61.19$31.55$92.74CARP0327-002
eff. 09/01/2025
CARPENTER (BRISTOL (ATTLEBOROUGH, NORTH ATTLEBOROUGH); ESSEX; MIDDLESEX (EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); AND NORFOLK (BELLINGHAM, BRAINTREE, CANTON, COHASSETT, FOXBORO, FRANKLIN, MEDFIELD, MEDWAY, MILLIS, NEEDHAM, NORFOLK, NORWOOD, PLAINVILLE, QUINCY, SHARON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH, WRENTHAM) COUNTIES)$50.10$31.45$81.55CARP0339-002
eff. 09/01/2025
CARPENTER (NORFOLK (BRAINTREE, QUINCY, COHASSET, WEYMOUTH, ETC.) PLYMOUTH (DUXBURY, HANOVER, HULL, HINGHAM, MARSHFIELD, NORWELL, PEMBROKE ROCKLAND, SCITUATE))$50.10$31.45$81.55CARP0346-001
eff. 09/01/2025
CARPENTER (DUKES; NANTUCKET)$46.43$28.35$74.78CARP0624-002
eff. 09/01/2017
CARPENTER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO & NORTH ATTLEBORO); NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON); PLYMOUTH (BRIDGEWATER, KINGSTON, LAKEVILLE, MIDDLEBORO, PLYMOUTH, S. HANOVER, WHITMAN))$39.28$27.90$67.18CARP0624-006
eff. 09/01/2017
MILLWRIGHT (SUFFOLK COUNTY)$50.47$33.50$83.97CARP1121-001
eff. 04/21/2025
MILLWRIGHT (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET, NORFOLK AND PLYMOUTH COUNTIES)$45.03$33.25$78.28CARP1121-005
eff. 04/21/2025
TELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND))$36.12$34.51$70.63ELEC0096-001
eff. 09/07/2025
ELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND))$48.16$36.20$84.36ELEC0096-001
eff. 09/07/2025
TELEDATA SYSTEM INSTALLER (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK))$42.09$19.71$61.80ELEC0099-001
eff. 06/01/2025
ELECTRICIAN (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK))$56.11$24.74$80.85ELEC0099-001
eff. 06/01/2025
ELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD, GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE, MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY); MIDDLESEX (BEDFORD, BILLERICA, BOXBORO, BURLINGTON, CARLISLE, CHELMSFORD, DRACUT, DUNSTABLE LITTLETON, LOWELL, NORTH READING, TEWKSBURY, TYNGSBORO, WESTFORD, WILMINGTON))$66.17$37.08$103.25ELEC0103-002
eff. 09/01/2025
ELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX, GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER, MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM, TOPSFIELD, WENHAM))$66.17$37.08$103.25ELEC0103-004
eff. 09/01/2025
ELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, READING, SHERBORN, SOMERVILLE, STONEHAM, SUDBURY, WAKEFIELD, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, FRANKLOIN, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWO$66.17$37.08$103.25ELEC0103-005
eff. 09/01/2025
LINE CONSTRUCTION: LINEMAN A.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS

$58.41$30.19$88.60ELEC0104-001
eff. 09/01/2024
LINE CONSTRUCTION: GROUNDMAN A.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS

$32.13$12.70$44.83ELEC0104-001
eff. 09/01/2024
LINE CONSTRUCTION: EQUIPMENT OPERATOR A.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS

$49.65$26.72$76.37ELEC0104-001
eff. 09/01/2024
LINE CONSTRUCTION: CABLEMAN A.
Scope and notes

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS

$58.41$30.19$88.60ELEC0104-001
eff. 09/01/2024
ELECTRICIAN (BARNSTABLE, BRISTOL (EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET; PLYMOUTH (EXCEPT HINGHAM AND HULL TWPS); NORFOLK (AVON, HALBROOK, RANDOLPH, SLOUGHTON))$50.02$31.05$81.07ELEC0223-002
eff. 09/01/2024
POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14
Scope and notes

FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY

$30.85$33.70$64.55ENGI0004-009
eff. 06/01/2025
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14
Scope and notes

FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY

$25.02$33.70$58.72ENGI0004-009
eff. 06/01/2025
POWER EQUIPMENT OPERATORS: GROUP 4 ASSITANT ENGINEER (FIREMAN) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14
Scope and notes

FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY

$46.52$33.70$80.22ENGI0004-009
eff. 06/01/2025
POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINES (1-3 GROUPED); GENERATOR; SIGHTING PLANT; HEATERS (POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR STEAM, CONVEYOR, WELLPOINT SYSTEM (OPERATING) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14
Scope and notes

FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY

$37.02$33.70$70.72ENGI0004-009
eff. 06/01/2025
POWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; BULLDOZER; TRACTOR; MECHANIC - MAINTENANCE; YORK RAKE; MULCHING MACHINE; PAVING SCREED MACHINE;STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING MACHINE; GROUT PUMP; PORTABLE STEAM BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; ASPHALT PAVER; LOCOMOTIVES OR MACHINES USED IN PLACE THEREOF; TAMPER (SELF PROPELLED OR TRACTOR-DRAW); CAL TRACKS; BALLAST REGULATOR;RAIL ANCHOR MACHINE; SWITCH TAMPER; TIRE TRUCK HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14
Scope and notes

FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY

$57.18$33.70$90.88ENGI0004-009
eff. 06/01/2025
POWER EQUIPMENT OPERATORS: GROUP 1 POWER SHOVEL; CRANE; TRUCK CRANE; DERRICK; PILE DRIVER; TRENCHING MACHINE; MECHANICAL HOIST PAVEMENT BREAKER; CEMENT CONCRETE PAVER; DRAGLINE; HOISTING ENGINE; THREE DRUM MACHINE; PUMPCRETE MACHINE; LOADERS; SHOVEL DOZER; FRONT END LOADER; MUCKING MACHINE; SHAFT HOIST; STEAM ENGINE; BACKHOE; GRADALL; CABLE WAY; FORK LIFT; CHERRY PICKER; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; ASPHALT PLANT ON JOB SITE; CONCRETE BATCHING AND/OR MIXING PLANT ON JOB SITE; CRUSHER PLANT ON JOB SITE; PAVING CONCRETE MIXER; TIMBER JACK HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14
Scope and notes

FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY

$57.83$33.70$91.53ENGI0004-009
eff. 06/01/2025
IRONWORKER: (AREA 2)$53.46$37.67$91.13IRON0007-001
eff. 09/16/2025
IRONWORKER: (AREA 1)$57.87$37.67$95.54IRON0007-001
eff. 09/16/2025
IRONWORKER (MIDDLESEX (ASHBY, ASHLAND, AYER, BOXBORO, HOLLISTON, HOPKINTON, HUDSON, MARLBORO, SHIRLEY, STOW, TOWNSEND); NORFOLK (MEDWAY))$57.57$37.67$95.24IRON0007-010
eff. 09/16/2025
IRONWORKER (BARNSTABLE; BRISTOL (ACUSHNET, ATTLEBORO, BERKLEY, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER, FREETOWN, MANSFIELD, NEW BEDFORD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, SOMERSET, SWANSEA, TAUNTON, WESTPORT); DUKES; NANTUCKET; NORFOLK (BILLINGHAM, FRANKLIN, PLAINVILLE, WRENTHAM); PLYMOUTH (LAKEVILLE, MARION, MATTAPOISETT, MIDDLEBORO, ROCHESTER, WAREHAM))$43.03$33.53$76.56IRON0037-002
eff. 09/16/2025
LABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))$46.20$29.70$75.90LABO0022-006
eff. 12/01/2024
LABORERS: GROUP 5- FLAGGER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))$27.01$29.70$56.71LABO0022-006
eff. 12/01/2024
LABORERS: GROUP 4- BLASTER; POWDERMAN (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))$46.20$29.70$75.90LABO0022-006
eff. 12/01/2024
LABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))$46.20$29.70$75.90LABO0022-006
eff. 12/01/2024
LABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))$46.20$29.70$75.90LABO0022-006
eff. 12/01/2024
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY))$46.20$29.70$75.90LABO0022-006
eff. 12/01/2024
LABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))$46.10$29.70$75.80LABO0022-012
eff. 12/01/2024
LABORERS: GROUP 5- FLAGGER (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))$27.01$29.70$56.71LABO0022-012
eff. 12/01/2024
LABORERS: GROUP 4- BLASTER; POWDERMAN (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))$38.95$29.70$68.65LABO0022-012
eff. 12/01/2024
LABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER; HYDRAULIC & SIMILAR SELF POWERE DRILLS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))$38.95$29.70$68.65LABO0022-012
eff. 12/01/2024
LABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILLPERATOR (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))$38.95$29.70$68.65LABO0022-012
eff. 12/01/2024
LABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON))$38.95$29.70$68.65LABO0022-012
eff. 12/01/2024
LABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6 HAZARDOUS WASTE WORK WITHIN THE "HOT" ZONE. (A PREMIUM OF TWO DOLLARS $2.00 PER HOUR OVER THE BASIC WAGE RATE.
Scope and notes

FOOTNOTE FOR LABORERS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, PATRIOT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$58.43$29.70$88.13LABO0022-013
eff. 12/01/2024
LABORERS: GROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR))$50.50$29.70$80.20LABO0022-013
eff. 12/01/2024
LABORERS: GROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR))$50.50$29.70$80.20LABO0022-013
eff. 12/01/2024
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE$46.25$29.70$75.95LABO1421-001
eff. 12/02/2024
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS$45.35$29.70$75.05LABO1421-001
eff. 12/02/2024
LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY)$42.25$29.70$71.95LABO1421-001
eff. 12/02/2024
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC "BROCK" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS$47.25$29.70$76.95LABO1421-001
eff. 12/02/2024
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS$47.00$29.70$76.70LABO1421-001
eff. 12/02/2024
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER$46.25$29.70$75.95LABO1421-001
eff. 12/02/2024
PAINTER BRIDGE (BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH (Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES))$56.76$36.00$92.76PAIN0035-001
eff. 07/01/2024
PAINTER SPAY NEW CONSTRUCTION: SANDBLAST$47.66$36.00$83.66PAIN0035-015
eff. 07/01/2024
PAINTER REPAINT: SPRAY, SANDBLAST$45.72$36.00$81.72PAIN0035-015
eff. 07/01/2024
PAINTER BRUSH, TAPER (Repaint)$44.32$36.00$80.32PAIN0035-015
eff. 07/01/2024
PAINTER BRUSH, TAPER (NEw Construction)$46.26$36.00$82.26PAIN0035-015
eff. 07/01/2024
PAINTER BRIDGE (MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline))$56.76$36.00$92.76PAIN0035-015
eff. 07/01/2024
CEMENT MASON/CONCRETE FINISHER (ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY)$49.19$40.86$90.05PLAS0534-001
eff. 07/01/2024
PLUMBERS AND PIPEFITTERS (MIDDLESEX (ASHBY, AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND))$55.00$31.57$86.57PLUM0004-001
eff. 09/01/2025
PLUMBER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, TOPSFIEILD, WENHAM, WEST NEWBURY))$69.84$36.43$106.27PLUM0012-001
eff. 03/02/2025
PLUMBER, PIPEFITTER, STEAMFITTER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEN, MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, TOPSFIELD, WENHAM, WEST NEWBURY))$69.84$36.43$106.27PLUM0012-003
eff. 03/02/2025
PLUMBER (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, ASHLAND, AYER - EXCEPT W. OF GREENVILLE BRANCH OF BOSTON & MAINE RR, BEDFORD, BELMONT, BILLERICA, BOXBORO, BURLINGTON, CAMBRIDGE, CARLISLE, CHELMSFORD, CONCORD, DRACUT, DUNSTABLE, EVERETT, FRAMINGHAM, HUDSON, HOLLISTON, HOPKINTON, LEXINGTON, LINCOLN, LITTLETON, LOWELL, MALDEN, MARLBORO, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, NORTH READING, PEPPERELL, READING, SHERBORN, SOMERVILLE, STONEHAM, S$69.84$36.43$106.27PLUM0012-006
eff. 03/02/2025
PLUMBERS AND PIPEFITTERS (BARNSTABLE; BRISTOL; DUKES; NANTUCKET; NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON) PLYMOUTH(REMAINDER OF COUNTY))$52.49$33.60$86.09PLUM0051-005
eff. 08/26/2024
PIPEFITTER (MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, WAKEFIELD, WINCHESTER AND WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON CASHASSET, DEDHAM, FOXBORO, FRANKLIN, MILLIS, MILTON, SHARON, WALPOLE, WESTWOOD, AND WRENTHAN); PLYMOUTH (HINGHAM, HULL, SCITUATE); ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, MET$66.58$39.22$105.80PLUM0537-001
eff. 03/01/2025
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$41.82$37.35$79.17TEAM0379-001
eff. 06/01/2025
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$41.53$37.35$78.88TEAM0379-001
eff. 06/01/2025
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$41.24$37.35$78.59TEAM0379-001
eff. 06/01/2025
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$41.14$37.35$78.49TEAM0379-001
eff. 06/01/2025
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$41.02$37.35$78.37TEAM0379-001
eff. 06/01/2025
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$40.95$37.35$78.30TEAM0379-001
eff. 06/01/2025
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
Scope and notes

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE

$40.78$37.35$78.13TEAM0379-001
eff. 06/01/2025

35 trades couldn’t be read reliably, so their rates are not shown: LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):); LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):); LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR); LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)); and 13 more. Check the official determination.

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.