Massachusetts prevailing wage rates: MA20260009
Residential construction in Dukes, Nantucket Counties.
MA20260009, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
6 classifications added, 9 removed or reworded
- removed Group 1 was $57.83 + $33.70 fringe
- removed Group 2 was $55.41 + $32.75 fringe
- removed Group 3 was $37.02 + $33.70 fringe
- removed Group 4 was $46.52 + $33.70 fringe
- removed Group 5 was $25.02 + $33.70 fringe
- removed Group 6 was $30.85 + $33.70 fringe
- removed Plasterer tender: BARNSTABLE, BRISTOL, DUKES, ESSEX, NANTUCKET, MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES was $38.95 + $29.70 fringe
- removed Plasterer tender: SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only) was $46.20 + $29.70 fringe
- removed Power equipment operators was $57.18 + $33.70 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACK $57.83 + $33.70 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANT $37.02 + $33.70 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT ENGINEER (FIREMAN) $46.52 + $33.70 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) $25.02 + $33.70 fringe
- added POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) $30.85 + $33.70 fringe
- added POWER EQUIPMENT OPERATORS: OOTNOTE FOR POWER EQUIPMENT OPERATORS: A. $57.18 + $33.70 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $50.62 | $28.82 | $79.44 | BOIL0029-002 eff. 01/01/2025 |
| TERRAZZO FINISHER | $63.44 | $37.33 | $100.77 | BRMA0003-001 eff. 08/01/2024 |
| MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 | $102.03 | BRMA0003-001 eff. 08/01/2024 |
| MARBLE & TILE FINISHER | $49.32 | $35.26 | $84.58 | BRMA0003-001 eff. 08/01/2024 |
| BRICKLAYER, CEMENT MASON, PLASTERER (NEW BEDFORD CHAPTER) | $64.50 | $37.54 | $102.04 | BRMA0003-021 eff. 08/01/2024 |
| CARPENTERS: (ALL OTHER WORK) | $50.10 | $31.45 | $81.55 | CARP0346-004 eff. 09/01/2025 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (DUKES COUNTY) | $26.55 | $13.02 | $39.57 | CARP0723-004 eff. 10/01/2024 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (DUKES COUNTY) | $26.55 | $13.02 | $39.57 | CARP0723-004 eff. 10/01/2024 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: WOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (NANTUCKET COUNTY) | $26.55 | $13.02 | $39.57 | CARP0723-005 eff. 10/01/2024 |
| CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENT: ALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (NANTUCKET COUNTY) | $26.55 | $13.02 | $39.57 | CARP0723-005 eff. 10/01/2024 |
| FLOOR LAYER: CARPET | $49.18 | $31.75 | $80.93 | CARP2168-009 eff. 09/01/2025 |
| ELECTRICIAN | $50.02 | $31.05 | $81.07 | ELEC0223-009 eff. 09/01/2024 |
ELEVATOR MECHANICScope and notesFOOTNOTE FOR ELEVATOR MECHANICS: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $74.17 | $38.44 | $112.61 | ELEV0004-001 eff. 01/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS)Scope and notesFOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $30.85 | $33.70 | $64.55 | ENGI0004-010 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS)Scope and notesFOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $25.02 | $33.70 | $58.72 | ENGI0004-010 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT ENGINEER (FIREMAN)Scope and notesFOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $46.52 | $33.70 | $80.22 | ENGI0004-010 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANTScope and notesFOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $37.02 | $33.70 | $70.72 | ENGI0004-010 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACKScope and notesFOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $57.83 | $33.70 | $91.53 | ENGI0004-010 eff. 06/01/2025 |
POWER EQUIPMENT OPERATORS: OOTNOTE FOR POWER EQUIPMENT OPERATORS: A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $57.18 | $33.70 | $90.88 | ENGI0004-010 eff. 06/01/2025 |
| IRONWORKER | $43.03 | $33.53 | $76.56 | IRON0037-006 eff. 09/16/2025 |
| LABORERS: GROUP 7 FLAGGERS | $27.01 | $29.70 | $56.71 | LABO0022-011 eff. 12/01/2024 |
| LABORERS: GROUP 6 ASBESTOS REMOVAL LABORERS | $46.10 | $29.70 | $75.80 | LABO0022-011 eff. 12/01/2024 |
| LABORERS: GROUP 5 PRE-CAST FLOOR AND ROOF PLANK ERECTOR | $38.95 | $29.70 | $68.65 | LABO0022-011 eff. 12/01/2024 |
| LABORERS: GROUP 4 BLASTER; POWDERMAN | $38.95 | $29.70 | $68.65 | LABO0022-011 eff. 12/01/2024 |
| LABORERS: GROUP 3 AIR TRACK, BLOCK PAVER; RUMMER; CURB SETTER; HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $38.95 | $29.70 | $68.65 | LABO0022-011 eff. 12/01/2024 |
| LABORERS: GROUP 2 JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHAL RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERTOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR | $38.95 | $29.70 | $68.65 | LABO0022-011 eff. 12/01/2024 |
| LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS | $38.95 | $29.70 | $68.65 | LABO0022-011 eff. 12/01/2024 |
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 | $75.95 | LABO1421-005 eff. 12/02/2024 |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 | $75.05 | LABO1421-005 eff. 12/02/2024 |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 | $71.95 | LABO1421-005 eff. 12/02/2024 |
| LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC "BROCK" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 | $76.95 | LABO1421-005 eff. 12/02/2024 |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 | $76.70 | LABO1421-005 eff. 12/02/2024 |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 | $75.95 | LABO1421-005 eff. 12/02/2024 |
GLAZIERScope and notesFOOTNOTE: A. PAID HOLIDAY: LABOR DAY, PROVIDED EMPLOYEE HAS WORKED ANY PART OF THE WEEK PRIOR TO LABOR DAY AND PART OF THE WEEK AFTER LABOR DAY | $43.13 | $21.00 | $64.13 | PAIN0011-009 eff. 06/01/2025 |
| PAINTERS: SPRAY, SANDBLAST (REPAINT) | $45.72 | $36.00 | $81.72 | PAIN0035-024 eff. 07/01/2024 |
| PAINTERS: SPRAY, SANDBLAST (NEW CONSTRUCTION) | $47.66 | $36.00 | $83.66 | PAIN0035-024 eff. 07/01/2024 |
| PAINTERS: BRUSH, TAPER (REPAINT) | $44.32 | $36.00 | $80.32 | PAIN0035-024 eff. 07/01/2024 |
| PAINTERS: BRUSH, TAPER (NEW CONSTRUCTION) | $46.26 | $36.00 | $82.26 | PAIN0035-024 eff. 07/01/2024 |
| PLUMBERS AND PIPEFITTERS | $52.49 | $33.60 | $86.09 | PLUM0051-007 eff. 08/26/2024 |
| ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | $53.53 | $35.69 | $89.22 | ROOF0033-001 eff. 08/01/2025 |
| SPRINKLER FITTER (BARNSTABLE; BRISTOL (BEYOND 35 MI RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX (ASHBY, TOWNSEND, THE AREA OF PEPPERELL AND SHIRLEY BEYOND 35 MI RADIUS OF BOSTON CITY HALL); NANTUCKET; PLYMOUTH (BEYOND 35 MI RADIUS OF BOSTON CITY HALL)) | $49.70 | $29.75 | $79.45 | SFMA0669-003 eff. 04/01/2025 |
| SPRINKLER FITTER | $49.70 | $29.75 | $79.45 | SFMA0669-004 eff. 04/01/2025 |
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.82 | $37.35 | $79.17 | TEAM0379-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.53 | $37.35 | $78.88 | TEAM0379-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.24 | $37.35 | $78.59 | TEAM0379-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.14 | $37.35 | $78.49 | TEAM0379-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.02 | $37.35 | $78.37 | TEAM0379-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.95 | $37.35 | $78.30 | TEAM0379-001 eff. 06/01/2025 |
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUMScope and notesFOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.78 | $37.35 | $78.13 | TEAM0379-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.