Michigan prevailing wage rates: MI20260024
Residential construction in Washtenaw County.
MI20260024, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ANN ARBOR, AUGUSTA, LODI, NORTHFIELD, PITTSFIELD, SALEM, SALINE, SCIO, SUPERIOR, WEBSTER, YPSILANTI & YORK) | $40.74 | $32.59 | $73.33 | ASBE0025-005 eff. 06/01/2025 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BRIDGEWATER, DEXTER, FREEDOM, LIMS, LYNDON, MANCHESTER, SHARON & SYLVAN) | $40.00 | $23.65 | $63.65 | ASBE0047-004 eff. 07/01/2025 |
| CARPENTER (SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS) | $29.19 | $15.76 | $44.95 | CARP1234-003 eff. 08/01/2024 |
| CARPENTER (MULTI-FAMILY CONDOMINIUMS) | $31.58 | $16.27 | $47.85 | CARP1234-003 eff. 08/01/2024 |
| ELECTRICIAN | $39.26 | $20.35 | $59.61 | ELEC0252-005 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $45.34 | $25.35 | $70.69 | ENGI0325-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATORScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $46.31 | $25.35 | $71.66 | ENGI0325-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $47.17 | $25.35 | $72.52 | ENGI0325-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $47.99 | $25.35 | $73.34 | ENGI0325-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $48.29 | $25.35 | $73.64 | ENGI0325-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $49.79 | $25.35 | $75.14 | ENGI0325-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | $51.29 | $25.35 | $76.64 | ENGI0325-004 eff. 06/01/2025 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 | IRON0025-004 eff. 06/01/2025 |
| LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | LABO0334-020 eff. 06/01/2025 |
| LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | LABO0334-020 eff. 06/01/2025 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | LABO0499-016 eff. 08/01/2025 |
| PAINTER: BRUSH AND ROLLER | $20.14 | $14.72 | $34.86 | PAIN0022-004 eff. 07/01/2008 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $42.26 | $23.70 | $65.96 | PLUM0190-007 eff. 06/01/2021 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $44.31 | $23.70 | $68.01 | PLUM0190-007 eff. 06/01/2021 |
| ROOFER | $42.67 | $21.62 | $64.29 | ROOF0070-008 eff. 05/08/2025 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $28.67 | $9.50 | $38.17 | SHEE0080-002 eff. 07/01/2022 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 | SUMI2010-022 eff. 09/16/2010 |
| LABORER: PIPELAYER | $17.99 | $5.46 | $23.45 | SUMI2010-022 eff. 09/16/2010 |
| LABORER: COMMON OR GENERAL | $15.58 | $5.46 | $21.04 | SUMI2010-022 eff. 09/16/2010 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 | $25.12 | SUMI2010-022 eff. 09/16/2010 |
TRUCK DRIVER: PICKUPScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | $31.03 | $0.70 | $31.73 | TEAM0247-003 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.