Michigan prevailing wage rates: MI20260033
Heavy construction in Chippewa County.
MI20260033, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $34.19 | $24.65 | $58.84 | BRMI0006-002 eff. 05/01/2024 |
| CARPENTER, INCLUDES FORM WORK | $34.01 | $23.14 | $57.15 | CARP1510-002 eff. 06/01/2025 |
| ELECTRICIAN (CONTRACTS OVER $135,000) | $33.44 | $18.67 | $52.11 | ELEC1070-003 eff. 06/01/2016 |
| ELECTRICIAN (CONTRACTS $135,000 AND UNDER) | $31.44 | $18.59 | $50.03 | ELEC1070-003 eff. 06/01/2016 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | ENGI0325-021 eff. 09/01/2025 |
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)Scope and notesFOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | ENGI0326-006 eff. 05/01/2025 |
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)Scope and notesFOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | ENGI0326-006 eff. 05/01/2025 |
OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)Scope and notesFOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | ENGI0326-006 eff. 05/01/2025 |
OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTIONScope and notesFOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | ENGI0326-006 eff. 05/01/2025 |
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTIONScope and notesFOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | ENGI0326-006 eff. 05/01/2025 |
OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTIONScope and notesFOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | ENGI0326-006 eff. 05/01/2025 |
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 | IRON0008-009 eff. 06/01/2025 |
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 | IRON0008-009 eff. 06/01/2025 |
| LABORER ((5) PIPELAYER) | $21.56 | $12.85 | $34.41 | LABO0334-002 eff. 09/01/2018 |
| LABORER ((4) GRADE CHECKER) | $21.51 | $12.85 | $34.36 | LABO0334-002 eff. 09/01/2018 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $21.33 | $12.85 | $34.18 | LABO0334-002 eff. 09/01/2018 |
| LABORER ((1) COMMON OR GENERAL) | $21.19 | $12.85 | $34.04 | LABO0334-002 eff. 09/01/2018 |
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION) | $32.74 | $13.45 | $46.19 | LABO1329-002 eff. 05/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 | PLAS0016-035 eff. 04/01/2014 |
| PLUMBER/PIPEFITTER | $34.48 | $25.18 | $59.66 | PLUM0111-009 eff. 05/27/2019 |
| TRUCK DRIVER: DUMP TRUCK | $12.63 EO 13658 minimum $13.65 may apply | $1.25 | $13.88 | SUMI2010-031 eff. 11/09/2010 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | SUMI2010-031 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 | SUMI2010-031 eff. 11/09/2010 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 EO 13658 minimum $13.65 may apply | $6.12 | $19.10 | SUMI2010-031 eff. 11/09/2010 |
| LABORER: LANDSCAPE | $10.89 EO 13658 minimum $13.65 may apply | $1.74 | $12.63 | SUMI2010-031 eff. 11/09/2010 |
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | TEAM0007-010 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.