Michigan prevailing wage rates: MI20260039
Heavy construction in Isabella County.
MI20260039, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $33.11 | $23.64 | $56.75 | CARP0706-007 eff. 06/01/2024 |
| ELECTRICIAN (TOWNSHIPS OF BLOOMFIELD, COLDWATER, DEERFIELD, FREMONT, GILMORE, NOTTAWA, ROLLAND & SHERMAN) | $36.52 | $25.15 | $61.67 | ELEC0275-004 eff. 06/01/2024 |
| ELECTRICIAN (TOWNSHIPS OF LINCOLN & COE) | $40.00 | $29.95 | $69.95 | ELEC0557-010 eff. 06/01/2025 |
| ELECTRICIAN (TOWNSHIPS OF CHIPPEWA, DENVER, ISABELLA, UNION, VERNON & WISE) | $40.00 | $26.52 | $66.52 | ELEC0692-016 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | ENGI0325-021 eff. 09/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILERScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 | $58.23 | ENGI0326-021 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING)Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | ENGI0326-021 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER; LOADERScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | ENGI0326-021 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICKScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | ENGI0326-021 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER | $48.98 | $25.25 | $74.23 | ENGI0326-021 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | IRON0025-006 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | IRON0025-006 eff. 06/01/2025 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | LABO0334-003 eff. 09/01/2022 |
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 | $37.85 | PLAS0016-030 eff. 04/01/2014 |
| PLUMBER/PIPEFITTER | $43.50 | $22.10 | $65.60 | PLUM0085-011 eff. 05/01/2023 |
| TRUCK DRIVER: DUMP TRUCK | $14.06 | $1.25 | $15.31 | SUMI2010-037 eff. 11/09/2010 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | SUMI2010-037 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | SUMI2010-037 eff. 11/09/2010 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 EO 13658 minimum $13.65 may apply | $6.12 | $19.10 | SUMI2010-037 eff. 11/09/2010 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | SUMI2010-037 eff. 11/09/2010 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | SUMI2010-037 eff. 11/09/2010 |
| LABORER: LANDSCAPE | $10.89 EO 13658 minimum $13.65 may apply | $1.74 | $12.63 | SUMI2010-037 eff. 11/09/2010 |
| LABORER: COMMON OR GENERAL | $19.79 | $5.95 | $25.74 | SUMI2010-037 eff. 11/09/2010 |
| CARPENTER, EXCLUDES FORM WORK | $23.97 | $6.29 | $30.26 | SUMI2010-037 eff. 11/09/2010 |
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | TEAM0007-010 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.