PrevailCrew

Michigan prevailing wage rates: MI20260042

Heavy construction in Alpena, Crawford, Iosco, Montmorency, Ogemaw, Oscoda, Otsego, Presque Isle, Roscommon Counties.

MI20260042, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MI20260042 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER, INCLUDES FORM WORK (ALL OTHER COUNTIES)$30.83$21.09$51.92CARP0202-004
eff. 06/01/2025
CARPENTER, INCLUDES FORM WORK (IOSCO & OGEMAW COUNTIES)$35.86$23.69$59.55CARP0706-015
eff. 06/01/2025
ELECTRICIAN (CRAWFORD (DOES NOT INCLUDE THE TOWNSHIP OF LOVELLS), OTSEGO (DOES NOT INCLUDE THE TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & ROSCOMMON (DOES NOT INCLUDE THE TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES)$36.62$23.05$59.67ELEC0498-010
eff. 06/01/2024
ELECTRICIAN (ALPENA, CRAWFORD (TOWNSHIP OF LOVELLS); IOSCO (TOWNSHIPS OF AUSABLE, OSCODA, PLAINFIELD & WILBUR), MONTMORENCY, OGEMAW (TOWNSHIPS OF FOSTER, ROSE & GOODAR), OSCODA, OTSEGO (TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & PRESQUE ISLE COUNTIES)$37.75$25.60$63.35ELEC0692-009
eff. 06/01/2025
ELECTRICIAN (IOSCO (TOWNSHIPS OF ALABASTER, BALDWIN, BURLEIGH, GRANT, RENO, SHERMAN & TAWAS), OGEMAW (ALL TOWNSHIPS EXCEPT FOSTER, GOODAR & ROSE) & ROSCOMMON (TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES)$40.00$26.52$66.52ELEC0692-019
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR$39.95$25.25$65.20ENGI0325-021
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25$65.77ENGI0325-021
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25$66.50ENGI0325-021
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25$71.23ENGI0325-021
eff. 09/01/2025
OPERATOR: POWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$44.00$25.25$69.25ENGI0326-013
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$32.98$25.25$58.23ENGI0326-013
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING)
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.32$25.25$66.57ENGI0326-013
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$45.68$25.25$70.93ENGI0326-013
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$48.98$25.25$74.23ENGI0326-013
eff. 06/01/2025
IRONWORKER: STRUCTURAL$36.55$35.93$72.48IRON0025-006
eff. 06/01/2025
IRONWORKER: REINFORCING$36.55$33.37$69.92IRON0025-006
eff. 06/01/2025
LABORER ((4) GRADE CHECKER)$22.73$12.95$35.68LABO0334-025
eff. 09/01/2022
LABORER ((1) COMMON OR GENERAL)$22.42$12.95$35.37LABO0334-025
eff. 09/01/2022
LABORER: COMMON OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)$25.02$13.45$38.47LABO1098-008
eff. 07/01/2025
LABORER: COMMON 3.323OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)$23.32$13.45$36.77LABO1098-008
eff. 07/01/2025
LABORER: COMMON OR GENERAL (OGEMAW & ROSCOMMON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)$27.68$13.45$41.13LABO1098-020
eff. 07/01/2025
CEMENT MASON/CONCRETE FINISHER (IOSCO & OGEMAW COUNTIES)$25.47$12.38$37.85PLAS0016-032
eff. 04/01/2014
CEMENT MASON/CONCRETE FINISHER (ALPENA, CRAWFORD, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE & ROSCOMMON COUNTIES)$23.10$12.38$35.48PLAS0016-034
eff. 04/01/2014
PLUMBER$43.50$21.10$64.60PLUM0085-002
eff. 05/04/2023
TRUCK DRIVER: DUMP TRUCK$11.10
EO 13658 minimum $13.65 may apply
$1.25$12.35SUMI2010-040
eff. 11/09/2010
OPERATOR: LOADER$16.07$8.37$24.44SUMI2010-040
eff. 11/09/2010
OPERATOR: ROLLER$13.74$7.93$21.67SUMI2010-040
eff. 11/09/2010
OPERATOR: GRADER/BLADE$15.50$3.62$19.12SUMI2010-040
eff. 11/09/2010
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$12.98
EO 13658 minimum $13.65 may apply
$6.12$19.10SUMI2010-040
eff. 11/09/2010
LABORER: PIPELAYER$15.28$3.99$19.27SUMI2010-040
eff. 11/09/2010
LABORER: MASON TENDER - CEMENT/CONCRETE$15.97$3.51$19.48SUMI2010-040
eff. 11/09/2010
LABORER: LANDSCAPE$10.89
EO 13658 minimum $13.65 may apply
$1.74$12.63SUMI2010-040
eff. 11/09/2010
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK
Scope and notes

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30TEAM0007-010
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.