PrevailCrew

Michigan prevailing wage rates: MI20260044

Heavy construction in Arenac, Branch, Gladwin, Hillsdale, Huron, Lenawee, Mecosta, Midland, Osceola, Shiawassee, Tuscola Counties.

MI20260044, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MI20260044 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER (FORM WORK ONLY) (MECOSTA & OSCEOLA COUNTIES)$31.50$21.15$52.65CARP0100-005
eff. 06/01/2025
CARPENTER: FORM WORK ONLY (BRANCH & HILLSDALE COUNTIES)$28.29$21.42$49.71CARP0525-008
eff. 06/01/2023
CARPENTER: FORM WORK ONLY (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES)$36.46$23.69$60.15CARP0706-014
eff. 06/01/2025
CARPENTER: FORM WORK ONLY (SHIAWASSEE COUNTY)$36.46$23.69$60.15CARP0706-018
eff. 06/01/2025
CARPENTER: FORM WORK ONLY (LENAWEE COUNTY)$35.41$21.06$56.47CARP1004-013
eff. 06/01/2025
ELECTRICIAN (HILLSDALE & LENAWEE COUNTIES)$48.40$17.79$66.19ELEC0008-012
eff. 05/25/2024
ELECTRICIAN (HURON COUNTY)$51.32$28.54$79.86ELEC0058-008
eff. 06/28/2024
ELECTRICIAN (MECOSTA COUNTY)$36.52$25.15$61.67ELEC0275-009
eff. 06/01/2024
ELECTRICIAN (OSCEOLA COUNTY (TOWNSHIPS OF RICHMOND, HERSEY, EVART & ORIENT))$36.52$25.15$61.67ELEC0275-014
eff. 06/01/2024
ELECTRICIAN (BRANCH COUNTY)$41.00$25.74$66.74ELEC0445-008
eff. 06/01/2025
ELECTRICIAN (OSCEOLA COUNTY (DOES NOT INCLUDE THE TOWNSHIPS OF EVART, HERSEY, ORIENT AND RICHMOND))$36.62$23.05$59.67ELEC0498-012
eff. 06/01/2024
ELECTRICIAN (MIDLAND (TOWNSHIPS OF INGERSOLL, JASPER, MOUNT HALEY AND PORTER) & TUSCOLA (TOWNSHIPS OF ALMER, ARBELA, COLUMBIA, DAYTON, DENMARK, ELKLAND, ELLINGTON, ELMWOOD, FAIRGROVE, FREMONT, GILFORD, INDIANFIELDS, JUNIATA, KINGSTON, KOYLON, NOVESTA, TUSCOLA, VASSAR, WATERTOWN AND WELLS) COUNTIES)$40.00$29.95$69.95ELEC0557-008
eff. 06/01/2025
ELECTRICIAN (SHIAWASSEE COUNTY (TOWNSHIPS OF PERRY & WOODHULL))$45.00$31.37$76.37ELEC0665-018
eff. 05/31/2025
ELECTRICIAN (ARENAC & GLADWIN COUNTIES)$40.00$26.52$66.52ELEC0692-017
eff. 06/01/2025
ELECTRICIAN (MIDLAND (ALL TOWNSHIPS EXCEPT MOUNT HALEY, JASPER, PORTER & INGERSOLL) & TUSCOLA (TOWNSHIPS OF WISNER & AKRON) COUNTIES)$35.31$22.68$57.99ELEC0692-018
eff. 06/01/2022
ELECTRICIAN (SHIAWASSEE (ALL TOWNSHIPS EXCEPT PERRY & WOODHULL) & TUSCOLA (TOWNSHIP OF MILLINGTON) COUNTIES)$44.83$26.96$71.79ELEC0948-008
eff. 05/25/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR$39.95$25.25$65.20ENGI0325-021
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25$65.77ENGI0325-021
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25$66.50ENGI0325-021
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25$71.23ENGI0325-021
eff. 09/01/2025
OPERATING ENGINEERS: GROUP 5 (AREA 2)$32.98$25.25$58.23ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEERS: GROUP 4 (AREA 2)$41.32$25.25$66.57ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEERS: GROUP 3 (AREA 2)$44.00$25.25$69.25ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEERS: GROUP 2 (AREA 2)$45.68$25.25$70.93ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEERS: GROUP 1 (AREA 2)$48.98$25.25$74.23ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEER: GROUP 5 (AREA 1)$32.98$25.25$58.23ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEER: GROUP 4 (AREA 1)$41.32$25.25$66.57ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEER: GROUP 3 (AREA 1)$44.00$25.25$69.25ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEER: GROUP 2 (AREA 1)$45.68$25.25$70.93ENGI0326-014
eff. 06/01/2025
OPERATING ENGINEER: GROUP 1 (AREA 1)$48.98$25.25$74.23ENGI0326-014
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 8 OILER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$35.29$25.35$60.64ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR, BULLDOZER, COMPACTOR, SCRAPER, LOADER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$45.34$25.35$70.69ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$46.31$25.35$71.66ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$47.17$25.35$72.52ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 4CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$47.99$25.35$73.34ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$48.29$25.35$73.64ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$48.79$25.35$74.14ENGI0326-024
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT: GROUP 1 (LENAWEE COUNTY) CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER (LENAWEE COUNTY)
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$51.29$25.35$76.64ENGI0326-024
eff. 06/01/2025
IRONWORKER: STRUCTURAL (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES)$36.55$35.93$72.48IRON0025-007
eff. 06/01/2025
IRONWORKER: REINFORCING (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES)$36.55$33.37$69.92IRON0025-007
eff. 06/01/2025
IRONWORKER: STRUCTURAL (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES)$36.55$34.04$70.59IRON0025-016
eff. 06/01/2025
IRONWORKER: REINFORCING (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES)$36.55$34.04$70.59IRON0025-016
eff. 06/01/2025
IRONWORKER, STRUCTURAL AND REINFORCING (LENAWEE COUNTY)$35.50$29.20$64.70IRON0055-011
eff. 07/01/2024
LABORER: (4) GRADE CHECKER (ARENAC, BRANCH, GLADWIN, HURON, MECOSTA, MIDLAND, OSCEOLA, TUSCOLA)$22.73$12.95$35.68LABO0334-008
eff. 09/01/2022
LABORER: (1) COMMON OR GENERAL (ARENAC, BRANCH, GLADWIN, HURON, MECOSTA, MIDLAND, OSCEOLA, TUSCOLA)$22.42$12.95$35.37LABO0334-008
eff. 09/01/2022
LABORER: (4) GRADE CHECKER (HILLSDALE, LENAWEE, SHIAWASSEE)$23.70$13.15$36.85LABO0334-019
eff. 09/01/2022
LABORER: (1) COMMON OR GENERAL (HILLSDALE, LENAWEE, SHIAWASSEE)$23.39$13.15$36.54LABO0334-019
eff. 09/01/2022
LABORER: COMMON OR GENERAL (BRANCH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION)$27.21$13.45$40.66LABO0355-007
eff. 06/01/2025
LABORER: COMMON OR GENERAL (MECOSTA & OSCEOLA COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)$26.70$12.95$39.65LABO0355-015
eff. 06/01/2022
LABORER: COMMON OR GENERAL (HILLSDALE & LENAWEE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)$32.35$13.45$45.80LABO0499-014
eff. 06/01/2025
LABORER: COMMON OR GENERAL (SHIAWASSEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION)$29.46$16.11$45.57LABO1075-011
eff. 06/01/2025
LABORER: COMMON OR GENERAL (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) EXCLUDES OPEN CUT CONSTRUCTION$27.68$13.45$41.13LABO1098-022
eff. 07/01/2025
CEMENT MASON/CONCRETE FINISHER (MECOSTA & OSCEOLA COUNTIES)$22.02$12.38$34.40PLAS0016-009
eff. 04/01/2014
CEMENT MASON/CONCRETE FINISHER (SHIAWASSEE COUNTY)$25.58$12.88$38.46PLAS0016-021
eff. 04/01/2014
CEMENT MASON/CONCRETE FINISHER (BRANCH COUNTY)$24.63$12.88$37.51PLAS0016-023
eff. 04/01/2014
CEMENT MASON/CONCRETE FINISHER (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES)$25.47$12.38$37.85PLAS0016-031
eff. 04/01/2014
CEMENT MASON/CONCRETE FINISHER (HILLSDALE & LENAWEE COUNTIES)$27.19$16.00$43.19PLAS0886-013
eff. 08/01/2011
PLUMBER/PIPEFITTER (ARENAC, GLADWIN, HURON (WEST OF M-53), MIDLAND & TUSCOLA COUNTIES)$43.50$22.10$65.60PLUM0085-017
eff. 05/04/2023
PLUMBER (HURON COUNTY (EAST OF M-53))$35.77$35.13$70.90PLUM0098-008
eff. 06/01/2019
PLUMBER/PIPEFITTER (MECOSTA & OSCEOLA COUNTIES)$39.89$23.82$63.71PLUM0174-015
eff. 07/01/2020
PLUMBER/PIPEFITTER (LENAWEE COUNTY (TOWNSHIPS OF CLINTON, MACON & TECUMSEH))$44.31$23.70$68.01PLUM0190-012
eff. 06/01/2021
PLUMBER/PIPEFITTER (BRANCH & HILLSDALE COUNTIES)$42.29$23.94$66.23PLUM0333-021
eff. 06/01/2022
PLUMBER/PIPEFITTER (LENAWEE COUNTY (REMAINDER OF COUNTY))$42.29$23.94$66.23PLUM0333-022
eff. 06/01/2022
PLUMBER/PIPEFITTER (SHIAWASSEE COUNTY)$39.81$20.95$60.76PLUM0370-007
eff. 06/01/2020
PIPEFITTER (HURON COUNTY (EAST OF M-53))$40.41$29.35$69.76PLUM0636-008
eff. 06/05/2017
TRUCK DRIVER: DUMP TRUCK$14.06$1.25$15.31SUMI2010-042
eff. 11/09/2010
OPERATOR: ROLLER$13.74$7.93$21.67SUMI2010-042
eff. 11/09/2010
OPERATOR: GRADER/BLADE$15.50$3.62$19.12SUMI2010-042
eff. 11/09/2010
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$12.98
EO 13658 minimum $13.65 may apply
$6.12$19.10SUMI2010-042
eff. 11/09/2010
LABORER: PIPELAYER$15.28$3.99$19.27SUMI2010-042
eff. 11/09/2010
LABORER: MASON TENDER - CEMENT/CONCRETE$15.97$3.51$19.48SUMI2010-042
eff. 11/09/2010
LABORER: LANDSCAPE$10.89
EO 13658 minimum $13.65 may apply
$1.74$12.63SUMI2010-042
eff. 11/09/2010
CARPENTER, EXCLUDES FORM WORK$23.97$6.29$30.26SUMI2010-042
eff. 11/09/2010
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK
Scope and notes

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30TEAM0007-010
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.