Michigan prevailing wage rates: MI20260046
Heavy construction in Benzie, Kalkaska Counties.
MI20260046, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $30.83 | $21.09 | $51.92 | CARP0202-003 eff. 06/01/2025 |
| ELECTRICIAN | $36.62 | $23.05 | $59.67 | ELEC0498-001 eff. 06/01/2024 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | ENGI0325-026 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | ENGI0325-026 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | ENGI0325-026 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | ENGI0325-026 eff. 09/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILERScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.98 | $25.25 | $58.23 | ENGI0326-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING)Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | ENGI0326-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 COMPACTOR; CRANE; SCRAPERScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | ENGI0326-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICKScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | ENGI0326-017 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 | $74.23 | ENGI0326-017 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 | IRON0025-011 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 | IRON0025-011 eff. 06/01/2025 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | LABO0334-025 eff. 09/01/2022 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | LABO0334-025 eff. 09/01/2022 |
| LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) | $25.02 | $13.45 | $38.47 | LABO1098-023 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $23.10 | $12.38 | $35.48 | PLAS0016-033 eff. 04/01/2014 |
| PLUMBER | $43.50 | $21.10 | $64.60 | PLUM0085-002 eff. 05/04/2023 |
| TRUCK DRIVER: DUMP TRUCK | $12.63 EO 13658 minimum $13.65 may apply | $1.25 | $13.88 | SUMI2010-044 eff. 11/09/2010 |
| OPERATOR: LOADER | $13.68 | $8.41 | $22.09 | SUMI2010-044 eff. 11/09/2010 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | SUMI2010-044 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | SUMI2010-044 eff. 11/09/2010 |
| OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 | SUMI2010-044 eff. 11/09/2010 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 EO 13658 minimum $13.65 may apply | $6.12 | $19.10 | SUMI2010-044 eff. 11/09/2010 |
| OPERATOR: BACKHOE/EXCAVATOR | $16.05 | $9.55 | $25.60 | SUMI2010-044 eff. 11/09/2010 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | SUMI2010-044 eff. 11/09/2010 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | SUMI2010-044 eff. 11/09/2010 |
| LABORER: LANDSCAPE | $10.89 EO 13658 minimum $13.65 may apply | $1.74 | $12.63 | SUMI2010-044 eff. 11/09/2010 |
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | TEAM0007-010 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.