Michigan prevailing wage rates: MI20260049
Heavy construction in Lake, Mason, Sanilac, St Joseph, St Joseph Counties.
MI20260049, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (FORM WORK ONLY) (LAKE & MASON COUNTIES) | $31.50 | $21.15 | $52.65 | CARP0100-006 eff. 06/01/2025 |
| CARPENTER: FORM WORK ONLY (ST. JOSEPH COUNTY) | $28.29 | $21.42 | $49.71 | CARP0525-010 eff. 06/01/2023 |
| CARPENTER: FORM WORK ONLY (SANILAC COUNTY) | $42.44 | $31.43 | $73.87 | CARP0687-007 eff. 06/01/2025 |
| ELECTRICIAN (SANILAC COUNTY) | $51.32 | $28.54 | $79.86 | ELEC0058-009 eff. 06/28/2024 |
| ELECTRICIAN (ST. JOSEPH COUNTY) | $42.78 | $21.84 | $64.62 | ELEC0131-007 eff. 06/01/2025 |
| ELECTRICIAN (LAKE (TOWNSHIPS OF CHASE, CHERRY VALLEY, LAKE, PINORA, PLEASANT PLAINS, SWEETWATER, WEBBER & YATES) & MASON (TOWNSHIPS OF AMBER, BRANCH, CUSTER, EDEN, HAMLIN. LOGAN, PERE MARQUETTE, RIVERTON, SHERIDAN, SHERMAN, SUMMIT & VICTORY) COUNTIES) | $36.52 | $25.15 | $61.67 | ELEC0275-013 eff. 06/01/2024 |
| ELECTRICIAN (LAKE (TOWNSHIPS OF DOVER, EDEN, ELK, ELLSWORTH, NEWKIRK, PEACOCK & SAUBLE) & MASON (TOWNSHIPS OF FREESOIL, GRANT & MEADE) COUNTIES) | $36.62 | $23.05 | $59.67 | ELEC0498-007 eff. 06/01/2024 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | ENGI0325-021 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | ENGI0325-021 eff. 09/01/2025 |
| OPERATING ENGINEERS: GROUP 5 (AREA 2) | $32.98 | $25.25 | $58.23 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEERS: GROUP 4 (AREA 2) | $41.32 | $25.25 | $66.57 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEERS: GROUP 3 (AREA 2) | $44.00 | $25.25 | $69.25 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEERS: GROUP 2 (AREA 2) | $45.68 | $25.25 | $70.93 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEERS: GROUP 1 (AREA 2) | $48.98 | $25.25 | $74.23 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEER: GROUP 5 (AREA 1) | $32.98 | $25.25 | $58.23 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEER: GROUP 4 (AREA 1) | $41.32 | $25.25 | $66.57 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEER: GROUP 3 (AREA 1) | $44.00 | $25.25 | $69.25 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEER: GROUP 2 (AREA 1) | $45.68 | $25.25 | $70.93 | ENGI0326-018 eff. 06/01/2025 |
| OPERATING ENGINEER: GROUP 1 (AREA 1) | $48.98 | $25.25 | $74.23 | ENGI0326-018 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL (SANILAC COUNTY) | $36.55 | $35.93 | $72.48 | IRON0025-008 eff. 06/01/2025 |
| IRONWORKER: REINFORCING (SANILAC COUNTY) | $36.55 | $33.37 | $69.92 | IRON0025-008 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL (LAKE, MASON & ST. JOSEPH COUNTIES) | $36.55 | $34.04 | $70.59 | IRON0025-017 eff. 06/01/2025 |
| IRONWORKER: REINFORCING (LAKE, MASON & ST. JOSEPH COUNTIES) | $36.55 | $34.04 | $70.59 | IRON0025-017 eff. 06/01/2025 |
| LABORER: (4) GRADE CHECKER (LAKE, MASON, ST. JOE) | $22.73 | $12.95 | $35.68 | LABO0334-023 eff. 09/01/2022 |
| LABORER: (1) COMMON OR GENERAL (LAKE, MASON, ST. JOE) | $22.42 | $12.95 | $35.37 | LABO0334-023 eff. 09/01/2022 |
| LABORER: (4) GRADE CHECKER (SANILAC) | $22.73 | $12.95 | $35.68 | LABO0334-024 eff. 09/01/2022 |
| LABORER: (1) COMMON OR GENERAL (SANILAC) | $22.42 | $12.95 | $35.37 | LABO0334-024 eff. 09/01/2022 |
| LABORER: COMMON OR GENERAL (ST. JOSEPH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 | LABO0355-011 eff. 06/01/2025 |
| LABORER: COMMON OR GENERAL (LAKE & MASON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | $28.56 | $12.95 | $41.51 | LABO0355-013 eff. 06/01/2024 |
| LABORER: COMMON OR GENERAL (SANILAC COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | $30.35 | $17.90 | $48.25 | LABO1075-006 eff. 06/01/2024 |
| CEMENT MASON/CONCRETE FINISHER (ST. JOSEPH COUNTY) | $24.63 | $12.88 | $37.51 | PLAS0016-024 eff. 04/01/2014 |
| CEMENT MASON/CONCRETE FINISHER (LAKE & MASON COUNTIES) | $22.02 | $12.38 | $34.40 | PLAS0016-026 eff. 04/01/2014 |
| CEMENT MASON/CONCRETE FINISHER (SANILAC COUNTY) | $32.23 | $22.11 | $54.34 | PLAS0514-004 eff. 06/01/2023 |
| PLUMBER (SANILAC COUNTY) | $35.77 | $35.13 | $70.90 | PLUM0098-009 eff. 06/01/2019 |
| PLUMBER/PIPEFITTER (LAKE & MASON COUNTIES) | $39.89 | $23.82 | $63.71 | PLUM0174-016 eff. 07/01/2022 |
| PLUMBER/PIPEFITTER (ST JOSEPH COUNTY) | $35.20 | $22.35 | $57.55 | PLUM0357-014 eff. 07/01/2020 |
| PIPEFITTER (SANILAC COUNTY) | $40.41 | $29.35 | $69.76 | PLUM0636-009 eff. 06/05/2017 |
| TRUCK DRIVER: DUMP TRUCK | $14.06 | $1.25 | $15.31 | SUMI2010-047 eff. 11/09/2010 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 | SUMI2010-047 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 | SUMI2010-047 eff. 11/09/2010 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 EO 13658 minimum $13.65 may apply | $6.12 | $19.10 | SUMI2010-047 eff. 11/09/2010 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 | SUMI2010-047 eff. 11/09/2010 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 | SUMI2010-047 eff. 11/09/2010 |
| LABORER: LANDSCAPE | $10.89 EO 13658 minimum $13.65 may apply | $1.74 | $12.63 | SUMI2010-047 eff. 11/09/2010 |
| CARPENTER, EXCLUDES FORM WORK | $23.97 | $6.29 | $30.26 | SUMI2010-047 eff. 11/09/2010 |
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | TEAM0007-010 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.