Michigan prevailing wage rates: MI20260050
Heavy construction in Barry County.
MI20260050, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $31.50 | $21.15 | $52.65 | CARP0100-009 eff. 06/01/2025 |
| ELECTRICIAN (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE, PRAIRIEVILLE, RUTLAND & YANKEE SPRINGS) | $42.78 | $21.84 | $64.62 | ELEC0131-008 eff. 06/01/2025 |
| ELECTRICIAN (TOWNSHIPS OF ASSYRIA, BALTIMORE, CARLTON, CASTLETON, HASTINGS, JOHNSTOWN, MAPLE GROVE & WOODLAND) | $41.00 | $25.74 | $66.74 | ELEC0445-010 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Underground Construction (Including Sewer)- GROUP 4 : BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | ENGI0325-008 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | ENGI0325-008 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | ENGI0325-008 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | ENGI0325-008 eff. 09/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 | ENGI0326-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | ENGI0326-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 | ENGI0326-004 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHERScope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $44.00 | $25.25 | $69.25 | ENGI0326-004 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 | IRON0025-011 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 | IRON0025-011 eff. 06/01/2025 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 | LABO0334-006 eff. 09/01/2022 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 | LABO0334-006 eff. 09/01/2022 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 | LABO0334-006 eff. 09/01/2022 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $23.34 | $11.60 | $34.94 | LABO0355-009 eff. 06/01/2024 |
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 | PAIN0312-014 eff. 06/12/2014 |
| PAINTER: BRUSH & ROLLER | $21.75 | $11.94 | $33.69 | PAIN0312-014 eff. 06/12/2014 |
| CEMENT MASON/CONCRETE FINISHER | $22.31 | $12.83 | $35.14 | PLAS0016-020 eff. 04/01/2014 |
| PLUMBER (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND) | $39.89 | $23.82 | $63.71 | PLUM0174-018 eff. 07/01/2022 |
| PLUMBER (TOWNSHIPS OF ASSYRIA, BALTIMORE, CASTLETON, HASTINGS, JOHNSTOWN & MAPLE GROVE) | $42.29 | $23.94 | $66.23 | PLUM0333-024 eff. 06/01/2022 |
| PLUMBER (REMAINDER OF COUNTY) | $35.20 | $22.35 | $57.55 | PLUM0357-013 eff. 07/01/2020 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $16.50 | $4.89 | $21.39 | SUMI2010-048 eff. 11/09/2010 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 | SUMI2010-048 eff. 11/09/2010 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 | SUMI2010-048 eff. 11/09/2010 |
| PIPEFITTER | $19.90 | $5.63 | $25.53 | SUMI2010-048 eff. 11/09/2010 |
| OPERATOR: LOADER | $17.41 | $4.97 | $22.38 | SUMI2010-048 eff. 11/09/2010 |
| OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 | SUMI2010-048 eff. 11/09/2010 |
| OPERATOR: CRANE | $18.50 | $5.10 | $23.60 | SUMI2010-048 eff. 11/09/2010 |
| OPERATOR: BULLDOZER | $29.31 | $2.64 | $31.95 | SUMI2010-048 eff. 11/09/2010 |
| LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 | SUMI2010-048 eff. 11/09/2010 |
| LABORER: LANDSCAPE | $12.21 EO 13658 minimum $13.65 may apply | $1.96 | $14.17 | SUMI2010-048 eff. 11/09/2010 |
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | TEAM0007-010 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.