PrevailCrew

Michigan prevailing wage rates: MI20260066

Heavy construction in Monroe County.

MI20260066, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MI20260066 wage rates
ClassificationBaseFringeTotalRate ID
CARPENTER, INCLUDES FORM WORK$42.44$31.43$73.87CARP0687-009
eff. 06/01/2025
ELECTRICIAN$48.40$17.79$66.19ELEC0008-011
eff. 05/25/2024
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER$39.95$25.25$65.20ENGI0325-019
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25$65.77ENGI0325-019
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25$66.50ENGI0325-019
eff. 09/01/2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25$71.23ENGI0325-019
eff. 09/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$35.29$25.35$60.64ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$43.63$25.35$68.98ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$45.34$25.35$70.69ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$46.31$25.35$71.66ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$47.17$25.35$72.52ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$47.99$25.35$73.34ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$48.29$25.35$73.64ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$49.79$25.35$75.14ENGI0326-008
eff. 06/01/2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER
Scope and notes

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$51.29$25.35$76.64ENGI0326-008
eff. 06/01/2025
IRONWORKER: STRUCTURAL AND REINFORCING$35.50$29.20$64.70IRON0055-010
eff. 07/01/2024
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER$27.71$9.10$36.81LABO0334-009
eff. 06/01/2025
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT)$29.93$9.10$39.03LABO0334-009
eff. 06/01/2025
LABORER ((7) LANDSCAPE)$19.59$12.95$32.54LABO0334-018
eff. 09/01/2022
LABORER ((524.20) PIPELAYER)$25.65$12.95$38.60LABO0334-018
eff. 09/01/2022
LABORER ((4) GRADE CHECKER)$25.50$12.95$38.45LABO0334-018
eff. 09/01/2022
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$22.11$12.95$35.06LABO0334-018
eff. 09/01/2022
LABORER ((1) COMMON OR GENERAL)$25.20$12.95$38.15LABO0334-018
eff. 09/01/2022
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE$38.80$15.70$54.50LABO0499-018
eff. 06/01/2025
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER$38.58$15.70$54.28LABO0499-018
eff. 06/01/2025
PAINTER: SPRAY$25.86$14.75$40.61PAIN0022-005
eff. 07/01/2008
PAINTER: BRUSH & ROLLER$25.06$14.75$39.81PAIN0022-005
eff. 07/01/2008
CEMENT MASON/CONCRETE FINISHER$27.19$16.00$43.19PLAS0886-009
eff. 08/01/2011
PLUMBER$43.79$23.94$67.73PLUM0671-003
eff. 07/01/2022
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69$24.51SUMI2010-064
eff. 11/09/2010
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK
Scope and notes

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.65$0.75$34.40TEAM0007-006
eff. 06/01/2025
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER$33.50$0.75$34.25TEAM0007-006
eff. 06/01/2025
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK
Scope and notes

FOOTNOTE: A. $470.70 PER WEEK. B.: $68.70 DAILY

$33.40$0.75$34.15TEAM0007-006
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.