Michigan prevailing wage rates: MI20260074
Heavy construction in Washtenaw County.
MI20260074, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $42.44 | $31.43 | $73.87 | CARP0687-006 eff. 06/01/2025 |
| ELECTRICIAN | $56.05 | $30.52 | $86.57 | ELEC0252-009 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | ENGI0325-019 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | ENGI0325-019 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | ENGI0325-019 eff. 09/01/2025 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | ENGI0325-019 eff. 09/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $35.29 | $25.35 | $60.64 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFTScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $43.63 | $25.35 | $68.98 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $45.34 | $25.35 | $70.69 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATORScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $46.31 | $25.35 | $71.66 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.17 | $25.35 | $72.52 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $47.99 | $25.35 | $73.34 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $48.29 | $25.35 | $73.64 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $49.79 | $25.35 | $75.14 | ENGI0326-008 eff. 06/01/2025 |
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGERScope and notesFOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | $51.29 | $25.35 | $76.64 | ENGI0326-008 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | IRON0025-006 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | IRON0025-006 eff. 06/01/2025 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | LABO0334-009 eff. 06/01/2025 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | LABO0334-009 eff. 06/01/2025 |
| LABORER ((7) LANDSCAPE) | $19.59 | $12.95 | $32.54 | LABO0334-018 eff. 09/01/2022 |
| LABORER ((524.20) PIPELAYER) | $25.65 | $12.95 | $38.60 | LABO0334-018 eff. 09/01/2022 |
| LABORER ((4) GRADE CHECKER) | $25.50 | $12.95 | $38.45 | LABO0334-018 eff. 09/01/2022 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.11 | $12.95 | $35.06 | LABO0334-018 eff. 09/01/2022 |
| LABORER ((1) COMMON OR GENERAL) | $25.20 | $12.95 | $38.15 | LABO0334-018 eff. 09/01/2022 |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 3 PIPELAYER | $38.47 | $15.45 | $53.92 | LABO0499-020 eff. 08/01/2025 |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 2 MASON TENDER - CEMENT/CONCRETE | $38.33 | $15.45 | $53.78 | LABO0499-020 eff. 08/01/2025 |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 1 COMMON OR GENERAL; GRADE CHECKER | $38.11 | $15.45 | $53.56 | LABO0499-020 eff. 08/01/2025 |
| PAINTER: SPRAY | $25.86 | $14.75 | $40.61 | PAIN0022-005 eff. 07/01/2008 |
| PAINTER: BRUSH & ROLLER | $25.06 | $14.75 | $39.81 | PAIN0022-005 eff. 07/01/2008 |
| CEMENT MASON/CONCRETE FINISHER | $32.23 | $22.11 | $54.34 | PLAS0514-002 eff. 06/01/2023 |
| PLUMBER | $44.31 | $23.70 | $68.01 | PLUM0190-010 eff. 06/01/2021 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 | SUMI2010-072 eff. 11/09/2010 |
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.65 | $0.75 | $34.40 | TEAM0007-006 eff. 06/01/2025 |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER | $33.50 | $0.75 | $34.25 | TEAM0007-006 eff. 06/01/2025 |
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCKScope and notesFOOTNOTE: A. $470.70 PER WEEK. B.: $68.70 DAILY | $33.40 | $0.75 | $34.15 | TEAM0007-006 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.