Michigan prevailing wage rates: MI20260082
Building construction in Eaton County.
MI20260082, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
1 classifications added, 1 removed or reworded
- added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $42.74 + $21.53 fringe
- removed SHEET METAL WORKER (Including HVAC Duct Installation; Excluding HVAC System Installation) was $42.74 + $21.53 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 | ASBE0047-002 eff. 07/01/2025 |
| BOILERMAKER | $43.50 | $36.74 | $80.24 | BOIL0169-001 eff. 07/01/2025 |
BRICKLAYER: TERRAZZO AND TILE SETTERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 | $55.66 | BRMI0009-009 eff. 08/01/2024 |
BRICKLAYER: TERRAZZO AND TILE FINISHERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $20.74 | $52.94 | BRMI0009-009 eff. 08/01/2024 |
BRICKLAYER: BRICKLAYERScope and notesFOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $36.10 | $26.22 | $62.32 | BRMI0009-009 eff. 08/01/2024 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 | $49.71 | CARP0525-012 eff. 06/01/2023 |
| CARPENTER: SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 | $49.71 | CARP0525-016 eff. 06/01/2023 |
| CARPENTER: SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (REMAINDER OF COUNTY) | $36.21 | $21.06 | $57.27 | CARP1004-005 eff. 06/01/2025 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (REMAINDER OF COUNTY) | $36.21 | $21.06 | $57.27 | CARP1004-020 eff. 06/01/2025 |
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | CARP1102-002 eff. 06/01/2025 |
| ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $34.30 | $22.16 | $56.46 | ELEC0445-003 eff. 06/01/2021 |
| ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $34.30 | $22.16 | $56.46 | ELEC0445-003 eff. 06/01/2021 |
| ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $42.98 | $29.75 | $72.73 | ELEC0665-003 eff. 05/31/2024 |
| ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $30.43 | $10.92 | $41.35 | ELEC0665-003 eff. 05/31/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 7 OILERScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | ENGI0324-010 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | ENGI0324-010 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING)Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | ENGI0324-010 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | ENGI0324-010 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHERScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | ENGI0324-010 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICKScope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | ENGI0324-010 eff. 06/01/2024 |
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.Scope and notesFOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | ENGI0324-010 eff. 06/01/2024 |
| IRONWORKER: STRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $29.51 | $66.06 | IRON0025-012 eff. 06/01/2025 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 | IRON0025-012 eff. 06/01/2025 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $32.53 | $13.45 | $45.98 | LABO0499-013 eff. 06/01/2025 |
| PAINTER: DRYWALL FINISHING/TAPING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET) | $28.75 | $18.68 | $47.43 | PAIN0845-005 eff. 06/01/2025 |
| PAINTER: BRUSH, ROLLER, SPRAY AND PAPERHANGING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET) | $28.75 | $18.68 | $47.43 | PAIN0845-005 eff. 06/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 | $37.52 | PLAS0016-011 eff. 04/01/2014 |
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATIONScope and notesFOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 | $71.72 | PLUM0333-006 eff. 06/01/2025 |
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATIONScope and notesFOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 | $71.72 | PLUM0333-006 eff. 06/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI0669-001 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | SHEE0007-004 eff. 05/01/2024 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 EO 13658 minimum $13.65 may apply | $1.18 | $14.75 | SUMI2011-007 eff. 02/01/2011 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 | SUMI2011-007 eff. 02/01/2011 |
| TRUCK DRIVER: DUMP TRUCK | $16.00 | $7.26 | $23.26 | SUMI2011-007 eff. 02/01/2011 |
| ROOFER | $15.00 | $0.58 | $15.58 | SUMI2011-007 eff. 02/01/2011 |
| OPERATOR: LOADER | $19.75 | $9.98 | $29.73 | SUMI2011-007 eff. 02/01/2011 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | SUMI2011-007 eff. 02/01/2011 |
| OPERATOR: GRADER/BLADE | $22.00 | $6.29 | $28.29 | SUMI2011-007 eff. 02/01/2011 |
| OPERATOR: BULLDOZER | $19.73 | $7.02 | $26.75 | SUMI2011-007 eff. 02/01/2011 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 | $30.66 | SUMI2011-007 eff. 02/01/2011 |
| METAL BUILDING ERECTOR | $16.92 | $6.32 | $23.24 | SUMI2011-007 eff. 02/01/2011 |
| LABORER: MASON TENDER - BRICK | $16.75 | $4.75 | $21.50 | SUMI2011-007 eff. 02/01/2011 |
| LABORER: LANDSCAPE & IRRIGATION | $10.38 EO 13658 minimum $13.65 may apply | $0.50 | $10.88 | SUMI2011-007 eff. 02/01/2011 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 | SUMI2011-007 eff. 02/01/2011 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.