What changed since modification 1

No existing rate changed amount.

2 classifications added, 3 removed or reworded
  • removed DRYWALL FINISHER/TAPER: Hand work was $27.15 + $15.00 fringe
  • removed DRYWALL FINISHER/TAPER: Machine work was $27.15 + $15.00 fringe
  • removed ELECTRICIAN: Low Voltage Wiring was $34.50 + $21.74 fringe
  • added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $31.01 + $17.19 fringe
  • added POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) $31.01 + $17.29 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

MI20260083 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65ASBE0047-002
eff. 07/01/2025
BOILERMAKER$43.50$36.74$80.24BOIL0169-001
eff. 07/01/2025
TILE SETTER
Scope and notes

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$33.31$23.20$56.51BRMI0009-014
eff. 08/01/2024
TILE FINISHER
Scope and notes

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$28.21$20.88$49.09BRMI0009-014
eff. 08/01/2024
BRICKLAYER
Scope and notes

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$38.00$26.49$64.49BRMI0009-014
eff. 08/01/2024
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$36.46$23.69$60.15CARP0706-001
eff. 06/01/2025
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$44.83$26.96$71.79ELEC0948-001
eff. 05/25/2025
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.23$25.25$56.48ENGI0324-011
eff. 06/01/2023
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$33.71$25.25$58.96ENGI0324-011
eff. 06/01/2023
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING)
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.57$25.25$64.82ENGI0324-011
eff. 06/01/2023
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.57$25.25$64.82ENGI0324-011
eff. 06/01/2023
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRACTOR; TRENCHER
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.28$25.25$66.53ENGI0324-011
eff. 06/01/2023
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$43.93$25.25$69.18ENGI0324-011
eff. 06/01/2023
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.
Scope and notes

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$47.28$25.25$72.53ENGI0324-011
eff. 06/01/2023
IRONWORKER: STRUCTURAL$36.55$35.93$72.48IRON0025-019
eff. 06/01/2025
IRONWORKER: REINFORCING$36.55$33.37$69.92IRON0025-019
eff. 06/01/2025
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER$27.71$9.10$36.81LABO0334-005
eff. 06/01/2025
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT)$29.93$9.10$39.03LABO0334-005
eff. 06/01/2025
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER$29.46$16.10$45.56LABO1075-002
eff. 06/01/2025
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D)$31.01$17.29$48.30PAIN1052-001
eff. 05/01/2025
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL)$31.01$17.19$48.20PAIN1052-001
eff. 05/01/2025
PAINTER: SPRAY$31.01$17.29$48.30PAIN1052-001
eff. 05/01/2025
PAINTER: BRUSH & ROLER$32.58$18.12$50.70PAIN1052-001
eff. 05/01/2025
DRYWALL FINISHER/TAPER (DRYWALL SANDING)$33.54$18.12$51.66PAIN1052-004
eff. 06/01/2025
CEMENT MASON/CONCRETE FINISHER$25.58$12.88$38.46PLAS0016-005
eff. 04/01/2014
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$46.61$22.95$69.56PLUM0370-002
eff. 06/01/2025
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION)$46.61$22.95$69.56PLUM0370-002
eff. 06/01/2025
ROOFER$30.38$19.97$50.35ROOF0149-005
eff. 06/01/2024
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73SFMI0669-001
eff. 01/01/2025
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$35.19$23.57$58.76SHEE0007-008
eff. 05/01/2023
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57
EO 13658 minimum $13.65 may apply
$1.18$14.75SUMI2011-008
eff. 02/01/2011
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41SUMI2011-008
eff. 02/01/2011

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.